Grindmaster SHUTTLE BREWER APBVSA 330V2 User Manual

Shuttle® Brewer & Airpot/Shuttle® Brewers  
Operation and Instruction Manual  
For Models APB-330V2, APB-430V2, APBVSA-330V2, APBVSA-430V2, APBIC-330V2,  
APBIC-430V2, APB-330V2E230, APB-430V2E230, APBVSA-330V2E230,  
APBVSA-430V2E230, APBIC-330V2E230, PBIC-430V2E230  
Table of Contents  
Warning Labels . . . . . . . . . . . . . . . . . . . . . . . . . . 3  
Installation and Start-up . . . . . . . . . . . . . . . . . . . 4  
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6  
Adjustments . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . 8  
Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16  
Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17  
Troubleshooting  
Models APB-330V2/  
APB-330V2E230  
Models APBIC-430V2/  
Error Messages . . . . . . . . . . . . . . . . . . . . . 20  
APBIC-430V2E230  
Filling Problems . . . . . . . . . . . . . . . . . . . . . 20  
Heating Problems . . . . . . . . . . . . . . . . . . . . 22  
Brewing Problems . . . . . . . . . . . . . . . . . . . . 24  
Precision Brew® Control Board . . . . . . . . . . . .26  
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27  
Parts Photos . . . . . . . . . . . . . . . . . . . . . . . . . . . 28  
VS-1.5(S) Cleaning and Sanitizing . . . . . . . . . .32  
Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . 33  
Prior authorization must be obtained from  
Grindmaster-Cecilware for all warranty claims.  
Models APBVSA-430V2/  
APBVSA-430V2E230  
Grindmaster-Cecilware  
4003 Collins Lane  
Louisville, KY 40245 USA  
(502) 425-4776  
(800) 695-4500 (USA & Canada only)  
(800) 568-5715 (Technical Service Only)  
FAX (502) 425-4664  
© Grindmaster Corporation, 2004  
PRINTED IN U.S.A.  
0611 Form # AM-346-03  
Part # A090-842  
Warning Labels  
The following warning labels were on your dispenser when it was shipped from the factory. They should remain on your dispenser  
in good, readable condition at all times. If one of your labels is missing or damaged, order a replacement label immediately.  
Part # A546-445  
Located on front splash panel and lid of machine.  
Located on APB-330V2, APB-330V2E230, APB-430V2, and APB-430V2E230 lower front decal.  
Order part # A546-434 for APB-330V2.  
Order part # A546-435 for APB-430V2.  
Located on APBIC-330V2, APBIC-330V2E230, APBIC-430V2, and APBIC-430V2E230 above faucet.  
Order part # A546-428 for APBIC-330V2.  
Order part # A546-427 for APBIC-430V2.  
Part # A546-213  
Located on front splash panel.  
Part # A71949  
Located on brew baskets.  
CAUTION  
Hot liquid in brew  
basket could cause  
burns.  
Remove with care.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 3  
Installation  
WARNING  
ƽ
ELECTRIC SHOCK HAZARD!  
Installation of this appliance should be performed by qualified service personnel only. Improper  
installation could result in electrocution.  
Set-Up/Position  
1) Remove the brewer from the packing material and attach its legs.  
2) Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust the  
legs to the correct level.  
IMPORTANT:  
THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER  
CONNECTIONS MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE, NATIONAL PLUMBING  
CODE, AND ANY LOCAL ORDINANCES.  
The electric and water hook-up locations are behind the front panel. Remove the four screws fastening this panel for  
access to these connections.  
Water Hook-up  
1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water.  
2) Use 3/8” copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection  
to the fill valve is 3/8” flare.  
3) Water line pressure must be from 30 to 80 psi (207-2 KPA).  
4) Hot (up to 160°F/71°C) or cold water may be used. Hot water offers faster recovery between brews.  
5) Install a shut-off valve near the brewer.  
6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water  
has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting  
type if cold water is used.  
Page 4  
Shuttle Brewers & Airpot/Shuttle Brewers  
Installation (cont.)  
Electric Hook-up  
The brewer is designed to operate at the specified voltage on the nameplate with a tolerance of 10% for voltage  
deviation. It is very important that the power line to the brewer be checked to make sure that the voltage is within  
10% of the brewer’s rated voltage. Failure to provide adequate voltage, as defined above, will cause problems  
with your brewer. If the power is too low, the solenoid valves may or may not work or longer recovery time will be  
experienced. The brewer may be permanently damaged if the voltage is too high.  
1) The electric ratings for your brewer are printed on its nameplate.  
2) The brewer should be connected to its own circuit with a fused disconnect switch or a circuit breaker near the brewer.  
Important: For CE units, means shall be provided to endure all pole disconnection from the supply. Such means shall be  
one of the following: a supply cord fitted with plug, or a switch that is directly connected to the supply terminals and has a  
contact separation of at least 3mm in each pole.  
3) Attach the appropriately sized cord to the brewer with a cord grip for the 1 1/2” (3.8 cm) electric input opening.  
The cord may enter through the rear or bottom on the left side of the brewer. Use an oil resistant cord such as  
type SO, SOO, SAO, STOO, SEO, SJO, SJOO, SJTO, SJTOO, SJEO, HSO, HSOO, HSJO, or HSJOO.  
Alternatively, flexible conduit and type THHN wires may be used. Use only copper conductors.  
4) Standard connection is 1 phase 3 wire. Connect the two lines to L1 and L2 on the terminal block. If the brewer is  
wired for three phase, a lug, L3, is provided on the terminal block. Neutral line should be connected to the N terminal.  
Alternately, if no neutral is available, the brewer can be wired accordingly by connecting L1 to position marked “L1”  
and L2 to position marked “L2”. This will require the installer to change the connection to the transformer primary  
from the white wire (120V) to the blue (208V) or orange (230,240V) connection. See below.  
NOTE: This “no neutral” conversion is only applicable to units marked as 208V, 230V, or 240V. It is NOT  
applicable to units marked 120/208V or 120/240V.  
Note: The brewer utilizes a multiple tap primary transformer to convert line voltage to 24 volts for use by the controller  
and some operating controls. The transformer has taps for 120V (white wire), 208V (blue wire), and 240V (orange wire)  
line voltage. Be sure to connect the white wire from the terminal block to the proper tap for the supplied voltage.  
See diagram below.  
YELLOW  
ORANGE  
240V  
TO  
RED  
BLUE  
208V  
TRANSFORMER  
CONTROLLER  
WHITE FROM  
TERMINAL BLOCK  
*N-120V  
*L2 -208V or 230V  
YELLOW  
WHITE  
120V  
BLACK FROM L1  
5) The body of the brewer must be grounded. A ground lug is provided for this purpose.  
Note: If supply cord is damaged, it must be replaced by a special cord or assembly from the manufacturer, or it’s  
service agent.  
Note: This appliance is IP10 rated, and shall not be cleaned with a water jet.  
WARNING  
ƽ
Never use the ground conductor as a neutral. This could cause electrocution.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 5  
Installation (cont.)  
Start-up  
1) Flip power supply to machine “ON” at the branch supply disconnect and allow the water tank to fill. The machine  
will make a subtle hissing sound while filling.  
Attention: A watchdog circuit monitors the fill valve “ON” time. If the “ON” time exceeds 6 minutes  
continuously, the brewer will display message “ER1” and cease operation. Normal initial fill time on  
some models exceeds 6 minutes. Turn off power to brewer and turn back on; this will reset the  
controller and allow brewer to complete filling.  
2) Once the brewer is full, it will take 15 to 35 minutes to heat. The ready lights will turn on when up to temperature.  
3) Insert the brew baskets and place a Shuttle or airpot under the baskets. Brew at least one batch from each side.  
Check the level in the container to be sure the brew volume is correct. Remember that when using coffee, the  
level will be lower. Do this for all batch sizes. The water must be hot to check the levels. If adjustments are needed,  
see the adjustments section of this manual.  
Operation  
CAUTION  
ƽ
HOT LIQUID HAZARD!  
Water used for brewing coffee is very hot. Use caution when brewing, pouring, or transporting  
coffee. Accidental spills may result in severe burns.  
1) Place an empty, warm Shuttle on the shelf, under the brew head. Turn on the warmer if available.  
2) If the Shuttle is not warm, allow the warmer to heat the Shuttle. Only a short brew of water will speed this.  
A cold Shuttle will significantly lower the temperature of the brewed coffee.  
3) Remove the filter basket and line with a filter paper. Paper size is 13 x 5 for the smaller basket, BB1.5, and  
14 x 6 for the larger, BB2.0.  
4) Place ground coffee in the filter basket. Follow corporate recommendations for amount of coffee and grind.  
A full Shuttle is 1.5 gallons (5.7L). A full vacuum Shuttle is 1.6 (6.0L) gallons.  
5) Slide the basket into the brewer making sure the spout lines up with the top of the Shuttle.  
6) If ready lights are lit, press correct batch size button.  
7) Brew spray time is about 4 minutes for a full Shuttle. After the brew, allow the coffee to drip for 1 to 2 minutes.  
Ready light will flash during the entire brew spray and drip cycle. Brew basket will be locked in place until drip  
cycle is finished.  
CAUTION  
ƽ
Coffee basket contains very hot water until the drip is completed. Early removal of a dripping  
basket could result in burns.  
8) Dump the grounds from the basket and rinse for the next brew. Coffee is ready to serve.  
9) The Shuttle may be placed on remote warming stations. Use caution when moving a full Shuttle.  
Page 6  
Shuttle Brewers & Airpot/Shuttle Brewers  
Adjustments  
All adjustments to machine are accessible through the front display(s). Refer to specifics below and the  
Programming Routine section. All values are preset at the factory and may vary brewer to brewer.  
Temperature Adjustment  
Tank temperature can be adjusted from 170°F – 205°F (77°C – 96°C) through the front display. See Programming  
Routine section for procedure.  
This brewer can be set for maximum water temperature of 205°F (96°C). The boiling point of water is lower as  
altitude increases. The setpoint temperature of the brewer should be maintained below the boiling point at a given  
elevation. Refer the to the chart below for recommended maximum setpoint for given altitudes.  
Approximate Boiling Point  
Recommended Max. Temperature  
Altitude (ft)  
°F  
°C  
°F  
°C  
0
212  
100  
99.5  
99.0  
98.5  
98.0  
97.5  
97.0  
96.5  
96.0  
95.5  
95.0  
94.4  
93.9  
93.4  
92.9  
92.4  
205  
204  
203  
202  
201  
200  
199  
199  
198  
197  
196  
195  
194  
193  
192  
191  
96.1  
95.6  
95.0  
94.4  
93.9  
93.3  
92.8  
92.8  
92.2  
91.7  
91.1  
90.6  
90.0  
89.4  
88.9  
88.3  
500  
211.1  
210.2  
209.3  
208.4  
207.5  
206.6  
205.7  
204.8  
203.9  
203  
1000  
1500  
2000  
2500  
3000  
3500  
4000  
4500  
5000  
5500  
6000  
6500  
7000  
7500  
202  
201.1  
200.2  
199.3  
198.3  
THERMISTOR CURVE FOR PART # A725-097  
°C  
°F  
RESISTANCE (OHMS)  
°C  
°F  
RESISTANCE (OHMS)  
0
5
32  
41  
50  
59  
68  
77  
86  
95  
104  
113  
122  
131  
16325  
12697  
9951  
7856  
6246  
5000  
4028  
3266  
2663  
2185  
1802  
1493  
60  
65  
70  
75  
80  
85  
90  
95  
140  
149  
158  
167  
176  
185  
194  
203  
212  
221  
230  
1244  
1041  
875  
740  
628  
535  
458  
393  
339  
294  
255  
10  
15  
20  
25  
30  
35  
40  
45  
50  
55  
100  
105  
110  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 7  
Adjustments (cont.)  
Brew Volume “br”  
Brew time can be set for each size visually. See Setting Brew Volume Procedure below.  
Brew time can also be adjusted through the display. See Programming Routine section.  
Setting Brew Volume Visually  
1. Remove brew basket and place container under brew head.  
2. Press and hold desired brew button for 5 seconds. Display will read “Pro”.  
3. Within 20 seconds, press and release desired brew button. Water will dispense from spray head and time  
will count-up in display.  
4. When volume is at desired amount, press and release brew button to stop flow. Time will flash in display.  
5. Within 20 seconds, press and release desired brew button. Display will clear and brew time will be stored  
into memory.  
Note: During this routine, no pulsing or bypass will occur.  
Note: If the On/Off button is pressed during procedure, time setting will default to previous time.  
Control Features  
Pre-infusion: Controls the initial coffee grounds wetting and the first dwell time after the initial wetting. Pulse brews  
are the series of pulses after the Pre-infusion process. All pulse ON and OFF times are the same.  
Brew Countdown Timer: After the start of a brew the LED display will countdown the remaining time left in the brew  
process. The countdown will include all OFF periods programmed in the Pre-infusion and the pulses. At the end of  
the brew time, the display will scroll driP, while the brew basket drains itself. At the end of the drip cycle, the display  
will scroll doneE for 30 seconds then turn off.  
Energy Savings Mode: If enabled, when the brewer is idle for three (3) hours this feature will allow the water tank to  
lower its holding temperature to 120°F. The display will scroll SLEEPIng while in this mode. To exit energy savings  
mode press any button and the unit will start reheating to brewing temperature.  
Copy-to-Left: On twin brewers, this feature allows you to copy the brew parameters programmed on a particular  
brew portion on the Right side to the Left side.  
Programming  
On twin brewers, the right side, Large portion button gives the user access to the global programming parameters of  
the brewer, such as; Tank Temperature, Energy Savings Mode, Enable/Disable Low Temp No Brew, ON/OFF, Drip  
Time and Bypass Ratio. After the global parameters are set, the individual portion brew parameters can be set. All  
other portion sizes (left and right) only access individual brew parameters to that particular portion. Also, on twin  
brewers, the last program step in programming individual brew parameters allows the operator to copy those brew  
parameters to the left side if “YES” is selected. If “YES” is selected, the brew parameters that were set for the right  
side for that particular portion are copied to the left side. If “NO” is selected, then the left side must be programmed  
separately.  
To enter program mode:  
Press the UP and DOWN arrows simultaneously for 5 seconds. Once in program mode, the green LED for each por-  
tions size will flash.  
Page 8  
Shuttle Brewers & Airpot/Shuttle Brewers  
Programming (cont.)  
To program the following items, press the Large, Right side portion button. (refer to Table 1)  
1)  
2)  
3)  
4)  
Temperature Scale:  
Choose °F or °C  
Set Water Tank Temperature: Choose between 170°F - 205°F  
EnErGy mOdE:  
Choose YES or NO  
Ltn (Low Temp No Brew):  
Choose YES or NO  
• If YES, the brewer will only allow a brew to begin if the water tank  
temperature is within 5°F of set point.  
• If NO, the brewer will brew at any temperature.  
5)  
DriP time:  
Choose from 40% to 80% of brew time.  
This is the amount of time the brewer takes to completely drain the brew  
basket after the brew valve closes. The factory default is 50%, so if the  
brewer is set for a 1.5 gallon brew, without pre-infusion and pulses, the  
brew basket will remain locked for 2 minutes after the brew valve closes.  
If, with coffee, the brew basket drips for longer than 2 minutes, increase  
the setting to 60% which will be 2:24 of drip time. The setting increases by  
5% increments; 12 seconds each.  
6)  
rto (Set Bypass Ratio):  
Choose Std or Grm  
• Choose Std if you are using the standard sprayhead.  
• Choose Grm if you are using the gourmet sprayhead.  
Bypass ratio is the last global program parameter to be set. The following are the individual brew portion parameters.  
Each portion button can have individual brew sequences.  
7)  
Br time (Brew time):  
Choose between 0:01 to 6:00 minutes.  
This time setting controls the brew volume. The brewer brews at a rate of  
1.5 gallons in four minutes (48 ounces per minute / 0.8 ounces per second).  
The Large portion button is factory set to brew 1.5 gallons or 4 minutes of  
brew time. Adjust the brew volume to desired level. One second of brew  
time will change brew volume by 0.8 ounces.  
8)  
PrE inFuSion:  
Choose OFF to 2:00 minutes.  
This is the amount of pre-infusion desired with the batch of coffee. If no  
pre-infusion is desired then set to OFF.  
9)  
PrE inFuSion oFF:  
PuLSE br:  
Choose 0.05 to 2:00 minutes.  
This is the OFF time that allows the brew basket to drain the Pre-infused  
volume of water.  
10)  
11)  
12)  
Choose OFF to 10  
This will set the number of brew pulses desired. If none are desired, then  
set to OFF.  
PuLSE on (Pulse ON time):  
Choose 0:05 - 2:00 minutes  
If pulses are set to 10, program the ON time for the pulses. The same ON  
time is used on all pulses.  
PuLSE oFF (Pulse OFF time): Choose 0:05 - 2:00 minutes  
If pulses are set on step 10, then program the OFF time for the pulses. The  
same OFF time is used on all pulses.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 9  
Programming (cont.)  
13)  
By-PASS (Set bypass volume):  
Choose OFF to 25%  
Set the amount of bypass desired during brew. If none is desired  
then set to OFF, otherwise, set the % of brew volume to bypass.  
14)  
CoPY-to-LEFt:  
Choose YES or no  
If the same program parameters are desired on same portion size  
on the left side, then choose YES and the parameters will  
be copied.  
The sequence of programming for the Medium portion is as follows: (refer to Table 2)  
1)  
2)  
3)  
4)  
5)  
6)  
7)  
8)  
Br time (Brew time):  
Choose 0:01 - 6:00 minutes  
Choose OFF to 2:00 minutes  
Choose 0:05 to 2:00 minutes  
Choose OFF to 10  
PrE inFuSion:  
PrE inFuSion oFF:  
PuLSE br (Pulse Brewing):  
PuLSE on (Pulse ON time):  
PuLSE oFF (Pulse OFF time):  
By-PASS (Set bypass volume):  
CoPY-to-LEFt:  
Choose 0:05 - 2:00 minutes  
Choose 0:05 - 2:00 minutes  
Choose OFF - 25%  
Choose YES or no  
The sequence of programming for the Small portion is as follows: (refer to Table 3)  
1)  
2)  
3)  
4)  
5)  
6)  
7)  
Br time (Brew time):  
PrE inFuSion:  
Choose 0:01 - 6:00 minutes  
Choose OFF to 2:00 minutes  
Choose 0:05 to 2:00 minutes  
Choose OFF to 10  
PrE inFuSion oFF:  
PuLSE br (Pulse Brewing):  
PuLSE on (Pulse ON time):  
PuLSE oFF (Pulse OFF time):  
CoPY-to-LEFt:  
Choose 0:05 - 2:00 minutes  
Choose 0:05 - 2:00 minutes  
Choose YES or no  
Page 10  
Shuttle Brewers & Airpot/Shuttle Brewers  
Programming Sequence for Large Left Portion  
Table 1  
PRESS-AND-HOLD UP & DOWN ARROWS FOR 5 SECONDS.  
DISPLAY WILL READ AS FOLLOWS:  
DISPLAY  
READING ADJUST ADVANCE  
OR  
OR  
TEMP SCALE  
TANK TEMP (170-202F)  
ENERGY MODE  
ENERGY MODE  
OR  
OR  
TO  
LOW-TEMP/NO-BREW  
LOW-TEMP/  
NO-BREW  
DRIP TIME  
DRIP TIME PERCENT OF BREW  
BYPASS RATIO  
OR  
BREW TIME  
BREW TIME (.01 TO 6.00)  
PRE INFUSION  
PRE INFUSION TIME (OFF TO 2.00)  
TO  
continued on next page  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 11  
Programming Sequence for Large Left Portion (cont.)  
Table 1 (cont.)  
DISPLAY  
READING ADJUST ADVANCE  
PRE INFUSION  
PRE INFUSION OFF TIME  
(.05 TO 2.00)  
TO  
PULSE BREW  
# OF PULSES  
(OFF, 1 - 10)  
TO  
PULSE ON  
PULSE ON TIME (0:05-2:00)  
PULSE OFF  
PULSE OFF TIME (0:05-2:00)  
BY-PASS  
OFF TO .25 PERCENT  
TO  
COPY TO LEFT  
OR  
Page 12  
Shuttle Brewers & Airpot/Shuttle Brewers  
Programming Sequence for Medium Portions  
Table 2  
PRESS-AND-HOLD UP & DOWN ARROWS FOR 5 SECONDS.  
DISPLAY WILL READ AS FOLLOWS:  
DISPLAY  
READING  
ADVANCE  
ADJUST  
ꢃꢄꢃ  
BREW TIME  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
ꢃꢄꢃ  
BREW TIME (.01 TO 6.00)  
PRE INFUSION  
PRE INFUSION TIME (OFF TO 2.00)  
TO  
PRE INFUSION  
PRE INFUSION OFF TIME  
(.05 TO 2.00)  
TO  
PULSE BREW  
# OF PULSES  
(OFF, 1 - 10)  
TO  
PULSE ON  
PULSE ON TIME (0:05-2:00)  
PULSE OFF  
PULSE OFF TIME (0:05-2:00)  
BY-PASS  
OFF TO .25 PERCENT  
TO  
continued on next page  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 13  
Programming Sequence for Medium Portions (cont.)  
Table 2 (cont.)  
PRESS-AND-HOLD UP & DOWN ARROWS FOR 5 SECONDS.  
DISPLAY WILL READ AS FOLLOWS:  
DISPLAY  
READING  
ADVANCE  
ADJUST  
ꢂ  
COPY TO LEFT  
ꢄꢃ  
OR  
Page 14  
Shuttle Brewers & Airpot/Shuttle Brewers  
Programming Sequence for Small Portions  
Table 3  
PRESS-AND-HOLD UP & DOWN ARROWS FOR 5 SECONDS.  
DISPLAY WILL READ AS FOLLOWS:  
DISPLAY  
READING  
ADJUST  
ADVANCE  
BREW TIME  
BREW TIME (.01 TO 6.00)  
PRE INFUSION  
PRE INFUSION TIME (OFF TO 2.00)  
TO  
PRE INFUSION  
PRE INFUSION OFF TIME  
(.05 TO 2.00)  
TO  
PULSE BREW  
# OF PULSES  
(OFF, 1 - 10)  
TO  
PULSE ON  
PULSE ON TIME (0:05-2:00)  
PULSE OFF  
PULSE OFF TIME (0:05-2:00)  
COPY TO LEFT  
OR  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 15  
Cleaning  
WARNING  
ƽ
Burn Hazard!  
Hot liquids and surfaces are present in this equipment. To avoid burns use caution when cleaning.  
Rinse hot parts with cold water before cleaning. Use gloves or a heavy cloth when removing hot  
parts from brewer.  
After Each Brew:  
1) Dispose of grounds and rinse brew basket.  
2) Rinse Shuttle or airpot containers before reuse.  
Every Day:  
1) Wash brew basket with warm soapy water. The wire basket is removable to aid cleaning.  
2) Remove spray head(s), located above brew basket(s), using gloves or a heavy towel. Wash off coffee oils  
and clean any plugged holes.  
3) Clean Shuttles with warm soapy water and a brush or towel.  
4) Use only a soft cloth and warm soapy water or stainless steel polish on the outside to avoid scratches.  
5) Wipe exterior of brewer with a damp cloth. Do not use abrasives which will scratch surface.  
6) If Shuttles are to be left on warmer all night, fill with water to avoid coffee oil burn-in.  
Weekly or Bi-Weekly, Depending on Use  
11) Fill Shuttles with one gallon, 2/3 full, of hot water.  
12) Pour into the Shuttle liners the recommended concentration of urn cleaner (excessive amounts of cleaner will  
attack the stainless steel).  
Urn cleaners that have been used successfully:  
DIP-IT  
TABZ™ Super Concentrate  
manufactured by Urnex Brands, Inc.  
170 Ludlow Street  
manufactured by Reckitt Benckiser, Inc.  
1655 Valley Road  
Wayne, NJ 07474  
(800) 228-4722 or (973) 633-3600  
Yonkers, NY 10705  
(800) 222-2826 or (914) 963-2042  
13) Scrub the liner interior with a plastic bristle brush.  
14) Remove the knurled nut at the top of the gauge glass and clean the glass with a small bottle brush.  
15) Pour out the contents of the Shuttle.  
16) Remove the handle assembly of the Shuttle faucet by unscrewing the plastic bonnet.  
17) Gently wash the faucet seat cup with a soft cloth and warm soapy water.  
18) Wash the faucet shank with a bottle brush.  
19) Soak airpot pick-up tube assembly in hot soapy water. Urn cleaner may be used for stronger cleaning.1  
10) Clean the warmer and bottom of Shuttle surfaces. These surfaces must be clean for proper heat transfer.  
11) Polish the exterior of the brewer with stainless steel cleaner. Use the appropriate cleaner for brass, copper,  
or vinyl if these optional finishes are provided.  
Page 16  
Shuttle Brewers & Airpot/Shuttle Brewers  
Service  
The rest of this manual contains information to aid the service person who is working on this equipment. This page  
has information on performing common service tasks. Following this is the Troubleshooting section which can help  
diagnose problems which are divided into three basic systems: filling, heating, and brewing.  
Next is an illustrated parts breakdown which will help in the selection of repair parts. If further assistance is needed,  
call our Technical Service Department at 800-695-4500 (USA & Canada only) or (502) 425-4776 Monday – Friday  
between 8:00 am and 6:00 pm Eastern time.  
Wiring diagrams are also provided. Locate the basic diagram for the model you are working with. If there are any  
options, see Diagram #091-548 (page 33 of this manual) which shows the wiring alterations for options.  
Drain Water Tank  
Always empty the tank before shipping.  
WARNING  
ƽ
Draining of tank should be performed by a qualified service technician. The tank contains very hot  
water. May cause severe burns.  
Note: Brewer may contain over 5 gallons (19.0L) of hot water.  
1) Prepare a heat resistant container to drain tank water into.  
2) Disconnect power to the brewer.  
3) Remove the front access panel.  
4) Pinch or clamp the silicone hose connected to fill valve.  
5) Disconnect hose from outlet barb on fill valve.  
6) Place hose over drain and release clamp.  
7) Allow the tank to drain completely.  
NOTE: It may be necessary to pinch the hose and stop the water before container is full. Carefully reinstall hose  
over fill valve outlet, then empty container. Repeat steps 4-7 completely to drain tank.  
Remove Brew Valve  
1) Disconnect power to machine.  
2) Remove top cover and remove wires and small tube from valve.  
3) Tilt inlet of valve down and pull sideways out of spray tee.  
4) Clamp rubber tubing and disconnect valve from tubing.  
Remove Heater  
1) Disconnect power and remove top cover of brewer.  
2) Disconnect wire leads to heater.  
3) Remove tank cover by loosening retaining screw(s). Cover is lifted up with heater attached. Heater is then  
removed.  
4) Replace heater with sealing washers in same configuration. When tightening nuts, hold element so it does  
not twist.  
5) Replace tank cover ensuring gasket seal is good.  
6) Replace heater wires. Be sure all electrical connections are secure.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 17  
Special Control Functions  
User Lockout  
User Lockout is achieved via the position of the LOCK jumper on the board header. Locate the header on the board  
(shown below) and place the jumper in the desired position. In the Locked position all menus in this document are  
locked out, and the unit will only allow brewing functions. There are two versions of the header, 10 pin and 2 pin.  
Both configurations are shown below.  
10 Pin Version  
2 Pin Version  
UNLOCKED  
UNLOCKED  
1
1
LOCK  
LOCKED  
LOCK  
LOCKED  
LOCK  
LOCK  
System Restore Function  
This function will restore a Precision Brew® unit to its original factory settings. To activate system restore, power on  
the unit while holding in the DOWN button on the keypad (use the keypad that controls the RIGHT side for a double  
unit).  
Continue holding the DOWN button and the display will scroll “rEStorE” to indicate that a system restore is about to  
happen. If the DOWN button is released at this point, the restore is cancelled. If the button hold is continued, the  
display will scroll “donE” to show completion of a system restore.  
Upon a successful restore, the original factory settings will override all changes. The brew counters are not affected.  
Factory Specific Features  
The following sections describe features that are not intended to be used by the end user. These features, instead,  
are intended to help Grindmaster set up and test the machine.  
Factory/Field Test Menu  
This menu is intended to check product functionality both at the end of the factory line and in the field. The con-  
trol must be completely OFF (both sides) to enter field test. This mode is entered by pressing and holding the UP  
key and the LARGE BREW key on the keypad (use the keypad that controls the RIGHT side for a double unit)  
for 6 seconds. Once the menu is entered, the unit will start with an LED test that lights all LEDs and segments  
on the display.  
Proceeding through the field test is done by pressing the ON/OFF key (RIGHT side if a double unit). Each time  
this button is pressed, the test will advance to the next step. For the output test, use the UP and DOWN keys to  
select the desired output.  
Refer to the table on the following page for operation. Field Test Mode exits after stepping through all modes  
only- there is not a timeout.  
Page 18  
Shuttle Brewers & Airpot/Shuttle Brewers  
Factory/Field Test Menu (cont.)  
Step Function  
Operation  
Description  
1
LED Test  
All LEDs ON  
Verify that all LEDs turn on.  
2
Firmware Version  
Display firmware version  
Shows the software version of the control.  
3
4
Date Code  
Not used  
Not used  
Not used  
Not used  
EEPROM Version  
Non Resetable Unit  
Counter  
Scroll non-resetable unit counter  
Shows the total number of brews made by  
the brewer (both sides if a double unit)  
5
6
7
8
Display Water  
Temperature  
Show averaged A/D reading of temperature Shows the current temperature in °F of the  
thermister.  
Display Water Level 1  
Show averaged A/D reading of water level 1 If > 500 water level is full,  
If < 500 water level is not full.  
Display Water Level 2  
Show averaged A/D reading of water level 2 If > 500 water is at the heater level,  
If < 500 water level not at the heater level.  
9
Show Input  
Input Test  
Display scrolls “InPut”  
Input Test Mode  
10  
Press each key and the display will show a Right Side  
number related to that key  
On/Off - 1 (advances test)  
Up - 5  
Down - 3  
Large Brew - 4  
Medium Brew - 2  
Small Brew - 0  
Basket Switch - 17  
Left Side  
On/Off - 9  
Up - 13  
Down - 11  
Large Brew - 12  
Medium Brew - 10  
Small Brew - 8  
Basket Switch - 16  
11  
12  
Show Output  
Output Test  
Display scrolls “outPut”  
Output Test Mode  
Turns on each relay separately. Displays  
“O##“ where:  
Scroll through relay outputs with the UP  
and DOWN keys.  
## = 2 digit output number  
Outputs are as follows:  
IMPORTANT: Each output will be turned O01 - Fill Valve  
ON when its number is on the display  
REGARDLESS of temperature or fill  
level. Be CAREFUL not to overfill the  
tank and keep electric items out of the  
way of the brew channel.  
O02 - Right Bypass Valve  
O03 - Left Bypass Valve  
O04 - Right Brew Valve  
O05 - Left Brew Valve  
O06 - not used  
O07 - Tank Heater  
O08 - Right Basket Lock  
O09 - Left Basket Lock  
O10 - not used  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 19  
Troubleshooting  
The following pages are provided to help determine the cause of problems with operation of the brewers and to  
indicate the appropriate solution for the problems. For each problem, the possible causes should be checked in  
the order shown until the exact nature of the problem is determined.  
The following procedures must be performed by a qualified service technician. Disconnect power to  
machine before servicing.  
Error Messages  
Problem  
Possible Causes  
Service Check  
Remedy  
• Fill valve on for over  
6 min. (This occurs  
during initial fill on some  
units – see Initial  
Start-up.)  
• Check system for  
water leaks.  
• Correct any leaks and reset  
controller.  
ER1  
ER2  
• Thermistor failure or  
loose connections in  
thermistor circuit.  
• Ensure that connector  
is securely attached to  
controller and that  
thermistor is securely  
connected.  
• Secure connections and reset  
controller. If error reoccurs,  
replace thermistor.  
• Thermistor is reading  
out of range.  
• Check tank  
temperature.  
• Replace thermistor.  
ER3  
ER4  
• No heat is detected  
• See Heating Problems  
• See Heating Problems  
Filling Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Fill valve not sealing  
properly.  
• Check to see if water  
enters tank continuously  
(usually at a slow rate).  
• Disassemble valve and clean  
out debris. Valve may need to  
be replaced.  
Overfilling water  
tank when power  
is Off  
• High electrode coated  
with lime or faulty.  
• Disconnect electrode  
wire at quick connect  
(brown wire). Connect a  
wire from the quick con-  
nect to the cabinet body.  
If filling stops, this is the  
error cause.  
• Remove electrode assembly  
and clean the probes. If  
problem is not corrected,  
replace electrode assembly.  
Overfilling water  
tank only when  
power is On  
• Connection from  
control board to tank  
body faulty.  
• Check to ensure  
connection (red  
wire) is secure.  
• Make connection to tank  
secure.  
• Control board is faulty.  
• Secure connection from • Replace control board.  
control board to metal  
enclosure does not  
stop filling.  
Page 20  
Shuttle Brewers & Airpot/Shuttle Brewers  
Troubleshooting (cont.)  
Filling Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• No electrical power to  
equipment  
• Check for proper  
• Establish electrical power  
to unit.  
Tank does not refill  
voltage at terminal  
block. Check circuit  
breaker on supply circuit.  
• No water supplied to  
equipment  
• Disconnect water supply • Establish water supply  
line and ensure that  
water is provided to unit.  
Check to see that any  
and all valves in water  
line are open.  
to unit.  
• No power to control  
board  
• Check for proper voltage • If there is not 120V across  
across transformer  
primary, proceed to step  
primary terminals by  
disconnecting terminals.  
See wiring diagram for  
more information.  
entitled “No power to control  
board and transformer not  
powered.” If there is proper  
voltage across primary, proceed  
to step entitled “No power  
to control board and  
transformer powered”.  
• No power to control  
board and transformer  
not powered.  
• Ensure there is proper  
voltage across terminal  
block. Check wiring  
diagram for more  
• Secure connections and reset  
circuit breaker on equipment.  
information.  
• No power to control  
board and transformer  
powered.  
• Disconnect quick  
• If there is not 24 Vac between  
disconnect on secondary the blue and yellow wires,  
side of transformer at  
quick disconnect  
between yellow and blue connection between 3 pin  
wires. Check for 24 Vac  
between blue and  
yellow wires.  
replace transformer. If proper  
voltage exists, secure  
connector and control board.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 21  
Troubleshooting (cont.)  
Filling Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Fill valve or control  
board is faulty  
• Check to ensure proper • If 6 pin connector is securely  
connection between attached to control board and  
Tank does not refill  
6 pin connector and con- all connections are secure  
trol board. Check  
and there is 24 Vac across  
fill valve terminals, replace  
fill valve.  
for proper connections  
at fill valve terminals.  
Drain 1 gal. (3.8L) of  
water from hot water  
faucet. Check for 24 Vac  
across fill valve  
terminals.  
Heating Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• No electrical power to  
equipment  
• Check for proper voltage • Establish electrical power  
Tank does not heat  
at terminal block. Check  
circuit breaker on supply  
circuit.  
to unit.  
• No power to control  
board  
• Check for proper voltage • If there is not proper voltage  
across transformer  
primary terminals by  
across primary, proceed to step  
entitled “No power to control  
disconnecting terminals. board and transformer not  
See wiring diagram for  
more information.  
powered”. If there is proper  
voltage across primary, proceed  
to step entitled “No power  
to control board and  
transformer powered”.  
Page 22  
Shuttle Brewers & Airpot/Shuttle Brewers  
Troubleshooting (cont.)  
Heating Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Low (long) electrode  
coated with lime or  
faulty.  
• Disconnect electrode  
wire at quick connect  
• Remove electrode assembly  
and clean the probes. If  
Tank does not heat  
(purple wire). Connect a problem is not corrected,  
wire from the quick con-  
nect to the cabinet body.  
If heating begins, this is  
the error cause.  
replace electrode assembly.  
• Connection from  
control board to tank  
body faulty.  
• Make connection to  
tank secure.  
• Check to ensure  
connection (green wire)  
is secure.  
• Connections from  
control board to heater  
relay faulty.  
• Check to ensure  
connections (gray and  
blue wires) are secure.  
• Make connections to  
relay secure.  
• Line voltage connections • Check to ensure  
• Make connections to  
relay secure.  
to heater relay faulty.  
connections (black and  
brown wires) are secure.  
• Connections to  
remainder of heater  
circuit faulty.  
• Check to ensure  
• Make connections secure.  
connections from relay  
to thermal cut-out and  
from thermal cut-out to  
contactor and from  
contactor to proper ter-  
minal of terminal block  
are secure. See wiring  
diagram for more info-  
mation.  
• Heater relay faulty.  
• Ensure that coil on  
• If the relay coil is energized  
heater relay is energized and there is an open circuit  
by ensuring that there is across the connection tabs,  
24 VDC between the  
gray and blue wires  
attached to the relay.  
Remove the black and  
brown wires from the  
relay and check for an  
open circuit across the  
connection tabs (COM  
and NO) to which the  
wires were attached.  
replace relay.  
• Check for open circuit  
on thermal cut-out.  
(NOTE: Tripping of  
thermal cut-out can  
indicate presence of  
another problem with  
the unit. Unit should  
be monitored)  
• Replace thermal  
cut-out.  
• Thermal cut-out tripped  
or faulty.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 23  
Troubleshooting (cont.)  
Heating Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Contactor faulty.  
• Ensure that coil on  
contactor is energized  
by ensuring that there  
is proper voltage  
between the brown and  
white wires attached to  
the relay. Check each  
side of the contactor  
(Line and Load) at each  
pole for continuity.  
• If the contactor coil is  
energized and there is an  
open circuit across any of  
the contactor poles, replace  
contactor.  
Tank does not heat  
• Heater faulty.  
• Check resistance  
across element(s)  
with power conductors  
disconnected.  
• If resistance is much less than  
8 Ohms or much more than  
15 Ohms, replace heater(s).  
• Control board is faulty.  
• Check to ensure proper • If 5-pin connector is securely  
connection between  
connector 5-pin and  
control board. Check  
for proper connections  
in all heater control  
circuitry. Check for  
proper connections  
between N terminal of  
contactor coil and  
terminal block.  
attached to control board  
and all connections are  
secure and functioning  
except there is not 120 Vac  
across contactor coil terminals,  
replace control board.  
Brewing Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Portion selected on  
touchpad not correct.  
• Review timer settings  
versus portion size.  
• Adjust timer to desired value or  
select different portion size.  
Brew volume too  
large or too small  
• Timer not set properly.  
• Compare timer setting  
to either factory setting  
or initial user setting to  
determine if it has  
• Adjust timer to desired value.  
been changed.  
Page 24  
Shuttle Brewers & Airpot/Shuttle Brewers  
Troubleshooting (cont.)  
Brewing Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Sprayhead clogged.  
• Visually check for  
clogging of holes  
in brewhead.  
• Clean all holes.  
Brew volume too  
large or too small  
• Brew valves clogged  
with lime deposits.  
• Visually inspect  
brew valve at  
hose connections.  
• Clean lime from valve. Seat,  
cup or entire valve may need  
replacement.  
• Water supply pressure  
or flow rate not  
adequate.  
• Check to see that fill  
valve cycles on and  
off frequently during  
brew cycle when all  
brew heads are used  
simultaneously. Check  
to ensure that water  
supply line is 3/8” and  
pressure is between  
30 and 80 psi (207 and  
552 KPA).  
• Supply water at adequate  
pressure and flow rate.  
• Water supply pressure  
fluctuates.  
• Check water pressure  
with and without other  
appliances operating.  
• Plumb water supply so that  
water pressure is not  
significantly affected by  
other appliances.  
Brew volume  
erratic  
Note: Small variations from batch to batch are normal.  
• Optional momentary  
• Check to see that  
• If fully engaged switch does  
Brew cycle will  
not start  
switch to indicate  
container in place not  
engaged or faulty.  
container fully engages  
switch. Check for  
not complete circuit across  
terminals of switch, replace  
switch.  
continuity across switch  
when switch is engaged.  
• Brew circuit connections • Check to see that  
• Secure connections.  
not secure.  
connector (6-pin)  
is securely connected to  
control board. Check to  
see that all connections  
from controller through  
brew valve are secure.  
• If there is 24 Vac across  
terminals and brew valve is  
not open, replace valve.  
• Brew valve faulty.  
Touchpad faulty.  
• Check to see if there is  
24 Vac across brew valve  
terminals.  
• If connections are secure,  
other functions appear normal  
and touchpad will not initiate a  
brew cycle, replace touchpad.  
• Check to see that  
touchpad connections  
to control board are  
secure.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 25  
Troubleshooting (cont.)  
Brewing Problems  
Problem  
Possible Causes  
Service Check  
Remedy  
• Controller faulty.  
• Check to see that the  
power is supplied to the  
controller by following  
instructions given in  
the Troubleshooting  
section on Filling  
• If there is not 24 Vac across  
brew valve, replace control  
board.  
Brew cycle will  
not start  
Problems. Once  
touchpad and momentary  
switch integrity is  
assured (see above),  
initiate a brew cycle  
and check for 24 Vac  
across brew valve.  
• Brew valve not closing  
completely.  
• Visually inspect brew  
valve at hose  
connections.  
• Clean lime from valve. Seat,  
cup or entire valve may need  
replacement.  
Sprayhead will not  
stop dripping water  
• Water in tank boiling.  
• Remove sprayhead  
and determine if drip is  
coming from overflow.  
• Reduce tank temperature.  
If you still need help, call our Service Department at (800) 695-4500 (USA and Canada only) or (502) 425-4776  
(Monday-Friday 8:00 am - 6:00 pm EST) or an authorized service center in your area. Please have the model  
and serial number ready so that accurate information can be given.  
Prior authorization must be obtained from Grindmaster-Cecilware’s Technical Services Department for all  
warranty claims.  
A530-066 Control Board  
used on all PrecisionBrew™ V2.0 models  
Refers to software version number.  
Subject to change.  
Page 26  
Shuttle Brewers & Airpot/Shuttle Brewers  
Parts List for All Precision Brew Models  
Models APB-330V2, APB-430V2, APBVSA-330V2, APBVSA-430V2, APBIC-330V2, APBIC-430V2  
ITEM  
DESCRIPTION  
PART #  
Reference Front View Picture:  
1
2
Controller PB  
A530-066  
A71450  
Relay, Heater*  
3
4
5
6
6A  
8
Water Inlet Valve 24 VAC  
Terminal Block  
Spray Head  
Orifice Bypass  
Retaining Pin for A518-053  
Switch Momentary ** PBIC only  
A725-117  
A531-035  
APT400-105  
A518-053  
A551-098  
A531-025  
Reference Lower Warmer Picture:  
20  
21  
22  
23  
23  
Faucet Hot Water  
A537-043  
A515016  
A531-026  
A535-018  
Light Warmer  
Switch Warmer  
Heater Warmer 120V 100W  
Heater Warmer 220V 100W  
A535-079 (for E230 models)  
Reference Top View Picture:  
30  
31  
31  
31  
31  
32  
33  
34  
35  
36  
37  
38  
39  
40  
41  
42  
Thermostat, Hi Limit  
A536-023  
A514005 (for models with 3 heaters)  
A515027  
A531-083 (230VAC coil)  
A531-076 (230VAC coil)  
A554-137  
A537-184V  
A537-183V  
A554-135  
A530-065  
N/A  
A518-054  
A548-172  
A585-016  
A512012  
A548-129  
Contactor 4-Pole (120VAC coil)**  
Contactor 2-Pole (120VAC coil)**  
Contactor for 2-Pole E230V models  
Contactor for 4-Pole E230V models  
Transformer, 120/208/240 100W  
Valve, Brew 24VAC PB  
Valve, Bypass 24VAC PB  
Solenoid, Basket Lock 24vdc  
Touchpad PB Series  
N/A  
Spray Elbow  
Tee Barbed 3/8" KYNAR  
Hose Overflow  
Hose Silicone  
Elbow Silicone  
Reference Tank Lid Picture:  
50  
50  
50  
50  
50  
50  
51  
52  
53  
Element Ht 5kW 240V (PB, PBVS)  
Element Ht 5kW 240V (PBIC)  
Element Htr 6.6kW 240V ** (PB, PBVSA) A535-059  
Element Htr 6.6kW 240V ** (PBIC) A535-071  
Element Htr 3.7kW 240V ** (PB, PBVSA) A535-068 (for models with 3 heaters)  
Element Htr 3.7kW 240V ** (PBIC)  
Thermistor  
Electrode Assembly  
Gasket Tank **  
A535-010 (for models with 3 heaters)  
A535-072 (for models with 3 heaters)  
A535-073 (for models with 3 heaters)  
A536-027  
A712-018  
A544-029  
* A531-072 = 12VDC coil; A71450 = 24VDC coil  
** part not shown  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 27  
Front View (refer to key on page 27)  
2
6
5
1*  
7
3
4
Lower Warmer (refer to key on page 27) (APB-430V2 pictured)  
23  
23  
21  
20  
21  
22  
22  
Page 28  
Shuttle Brewers & Airpot/Shuttle Brewers  
Top View (refer to key on page 27)  
38  
36  
35  
36  
35  
42  
32  
34  
30  
52  
Tank Lid (refer to key on page 27)  
3 Heater Model shown  
52  
51  
50  
50  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 29  
Shuttle Parts List  
for APB-330V2 and APB-430V2  
6
4
5
ITEM  
DESCRIPTION  
Faucet Model ES  
Shank w/ Chrome Bonnet  
Gauge Assembly  
Kit, Shuttle Lid  
PART #  
A537-053  
A522078  
A718-018  
A725-092  
A713-027  
A548-142  
1
2
3
4
3
S.S. Shuttle Cover  
(not shown)*  
5
6
Lid Retaining Clip  
2
1
A548-140  
A61365  
Lid Stopper w/ O-Ring  
* S.S. Cover used until August 2001  
A318-119P Top Gage Fitting  
A522026 Washer Upper Gage  
A537-055 Handle  
A555-001 Gage Shield  
A522031 Gage Glass  
A522132 Bonnet Nut  
A522120 Spring  
A537-047 Plastic Stem  
A522102 Silicone  
Seat Cup  
A522027 Washer Lower Gage  
AA-958 Gage Base  
Upper Faucet  
(Part # A537-049)  
Gauge Assembly  
(Part # A718-018)  
Page 30  
Shuttle Brewers & Airpot/Shuttle Brewers  
Model VS-1.5 Vacuum Shuttle Parts List  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 31  
Cleaning & Sanitizing Instructions  
for Model VS-1.5(S)  
These cleaning and sanitizing instructions are only a guideline to be used for the cleaning and sanitizing of the  
VS-1.5S and VS-S with VS-1.5. In-house cleaning and sanitizing methods may be more effective. Grindmaster  
assumes no responsibility for the food born illness and/or sickness caused by using improper sanitizing methods.  
For cleaning and sanitizing of the VS-1.5S and VS-S with VS-1.5 the three-sink method is recommended. The three-  
sink method consists of the sink full of hot soapy water using an approved detergent, a fresh water rinse, and an  
aqueous sanitizing solution using an approved iodine sanitizer with mixture between 12.5-25 PPM.  
1) Rinsing the unit after use:  
a) Rinse unit with hot water and empty completely.  
b) Fill unit with hot water.  
c) Open unit and empty contents completely by opening the faucet completely.  
2) Cleaning and sanitizing lid assembly:  
a) Remove lid from unit, fully submerse it in cleaning solution. Using a clean cloth, wipe the unit thoroughly.  
b) Using supplied brush, clean mixing tube thoroughly.  
c) Rinse with clean water.  
d) Submerse in sanitizing solution for 5 minutes then air dry completely.  
3) Cleaning and sanitizing body assembly:  
a) Remove unit from the base. (only when using VS-S with VS-1.5)  
b) Completely fill the unit with cleaning solution. Using a clean cloth, wipe the unit thoroughly.  
c) Rinse unit thoroughly with fresh water.  
d) Remove faucet, shank, and sight gauge from unit and place in cleaning solution.  
e) Open lid on the bottom of the unit and remove silicon tube (Tank to Faucet Tube) and place in cleaning  
solution for cleaning.  
f) Reassemble unit.  
g) Fully fill unit with sanitizing solution for 5 minutes and drain through fully opened faucet.  
h) Wipe outside of the unit with a clean cloth moistened with sanitizing solution.  
i) Place unit on rack upside down to thoroughly air-dry.  
4) Cleaning Stand Assembly and tray:  
a) Remove tray and tray top and place in cleaning solution. Using a clean cloth, clean tray and tray  
top thoroughly.  
b) Wipe outside of the stand with a clean cloth moistened with sanitizing solution.  
c) Place parts on rack to thoroughly air-dry.  
5) Cleaning the Faucet assembly and silicone tube:  
a) Using supplied brush, clean silicone tube, sight gauge tube, and shank assembly.  
b) Rinse parts and place in sanitizing solution for 5 minutes, remove and air dry.  
c) Remove top from faucet and use brush to clean inside, rinse and place in sanitizing solution for 5 minutes.  
Remove and air dry.  
6) When all pieces are completely dry reassemble for use.  
Page 32  
Shuttle Brewers & Airpot/Shuttle Brewers  
Wiring Diagram - Precision Brew 430 Series  
Models APB-430V2, APBVSA-430V2, and APBIC-430V2  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 33  
Wiring Diagram - Precision Brew 330 Series  
Models APB-330V2, APBVSA-330V2, and APBIC-330V2  
Page 34  
Shuttle Brewers & Airpot/Shuttle Brewers  
Wiring Diagram  
APB-430V2E230, APBVSA-430V2E230, APBIC-430V2E230  
(Single or Three Phase Models)  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 35  
Wiring Diagram  
APB-330V2E230, APBVSA-330V2E230, APBIC-330V2E230 Brewers  
Page 36  
Shuttle Brewers & Airpot/Shuttle Brewers  
Wiring Diagram - Precision Brew 430 Series  
120/208 or 120/240V  
Models APB-430V2, APBVSA-430V2, and APBIC-430V2  
:+7  
%/.  
/ꢈ  
/ꢁ  
3%ꢆꢂꢄꢅꢀ02'(/6  
ꢈꢁꢅ9ꢀ:505ꢀ(/(07  
%/. %/.  
%/.  
:+7  
%/.  
7(50,1$/  
%/2&.  
/ꢈ  
1
6((ꢀ+($7(5ꢀ&21),*6ꢀ21ꢀ27+(5ꢀ6+((7  
&217$&725  
/ꢈ  
237,21$/  
0$67(5  
32:(5  
:$50(5  
6:,7&+  
:$50(5ꢀ/,*+7  
:+7  
1
/ꢈ /ꢁ /ꢄ  
/ꢁ  
ꢈꢁꢅ9ꢀ:505ꢀ(/(07  
%/. %/.  
32:(5  
6833/<  
/ꢄ  
:$50(5  
6:,7&+  
:$50(5ꢀ/,*+7  
:+7  
:+7  
%51  
:+7  
ꢈꢁꢅ9  
%/.  
6((ꢀ:$50(5  
&,5&8,7ꢀ',$*ꢉ  
:+7  
+,ꢆ7(03ꢀ/,0,7  
Wƒ  
7+(50267$%751  
%51  
ꢈꢅꢅ9$  
75$16)250(5  
%/. %/. &20  
ꢁꢂꢅ 25*  
%/8  
ꢁꢅꢊ  
:+7  
ꢈꢁꢅ  
:+7  
:$7(5ꢀ,1/(7  
9$/9(ꢀꢁꢂYDF  
%/8  
%5(:ꢀ9$/9(ꢀ/()7ꢀꢁꢂYDF  
-ꢈ  
-ꢊ  
352%(6  
%<3$66ꢀ9$/9(ꢀ/()7ꢀꢁꢂ9$&  
%5(:ꢀ9$/9(ꢀ5,*+7ꢀꢁꢂYDF  
%<3$66ꢀ9$/9(ꢀ5,*+7ꢀꢁꢂYDF  
:$7(5ꢀ7$1.ꢀ  
*5281'  
:$7(5  
$ꢃꢄꢅꢆꢅꢃꢇꢀꢀ&21752//(5  
-ꢂ  
-ꢄ  
/()7ꢀ6+877/(ꢀ6:,7&+ꢀ  
5,*+7ꢀ6+877/(ꢀ6:,7&+ꢀ  
+($7(5  
7+(50,6725  
352%(  
,%&4ġ4/5#(0!$  
2)'(4ġ4/5#(0!$  
+($7(5ꢀ5(/$<  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 37  
Wiring Diagram - Precision Brew 330 Series  
120/208V, 120/240V  
Models APB-330V2, APBVSA-330V2, and APBIC-330V2  
:+7  
%/.  
/ꢈ  
/  
&217$&725  
237,21$/  
0$67(5  
32:(5  
7(50,1$/ꢀ%/2&.  
/ꢈ  
/ꢈ  
1
/ꢀ  
32:(5  
/ꢀ  
6833/<  
ꢂꢅꢀ7$1.ꢀ+($7(5  
9  
%/.  
:+7  
%51  
:+7  
6((:$50(5  
3%ꢆꢄꢄꢅꢀ02'(/6  
&,5&8,7ꢀ',$*ꢉ  
9:505(/(07  
+,ꢆ7(03ꢀ/,0,7  
7+(50267$7  
Wƒ  
%/.  
%/. %/.  
/ꢈ  
1
:$50(5  
:$50(5ꢀ/,*+7  
%51  
%51  
6:,7&+  
:+7  
:+7  
ꢈꢅꢅ9$  
75$16)250(5  
ꢂꢅ 25*  
%/. %/. &20  
%/8  
ꢅꢊ  
:+7  
:+7  
ꢅ  
:$7(5ꢀ,1/(7  
9$/9(ꢂYDF  
%/8  
-ꢈ  
-ꢊ  
%<3$669$/9(ꢂYDF  
352%(6  
%5(:9$/9(ꢂYDF  
:$7(5ꢀ7$1.ꢀ  
:$7(5  
$ꢃꢄꢅꢆꢅꢃꢇꢀꢀ&21752//(5  
*5281'  
-ꢂ  
-ꢄ  
+($7(5  
6+877/(6:,7&+ꢀ  
7+(50,6725  
352%(  
4/5#(0!$  
+($7(55(/$<  
Page 38  
Shuttle Brewers & Airpot/Shuttle Brewers  
Wiring Diagram  
230V, 208V, or 240V without Neutral  
Models APB-430V2, APBVSA-430V2, APBIC-430V2, APB-430V2E230, APBVSA-430V2E230,  
and APBIC-430V2E230  
:+7  
%/.  
/  
/ꢁ  
3%ꢆꢂꢄꢅꢀ02'(/6  
ꢁꢁꢅꢀ25ꢀꢁꢂꢅ9ꢀ:505ꢀ(/(07  
%/. %/.  
%/.  
237,21$/  
0$67(5  
32:(5  
/ꢁ  
6((ꢀ+($7(5ꢀ&21),*6ꢀ21ꢀ27+(5ꢀ6+((7  
7(50,1$/ꢀ%/2&.  
:$50(5  
6:,7&+  
:$50(5ꢀ/,*+7  
:+7  
&217$&725  
:+7  
%/.  
/ꢁ  
/ꢁ  
/ꢄ  
/ꢁ  
/ꢄ  
/ꢁ  
1
/ꢁ  
32:(5  
6833/<  
ꢁꢁꢅꢀ25ꢀꢁꢂꢅ9ꢀ:505ꢀ(/(07  
%/. %/.  
:$50(5  
6:,7&+  
:$50(5ꢀ/,*+7  
:+7  
:+7  
ꢁꢅ9ꢆ  
%51 ꢁꢂꢅ9 :+7  
%/.  
:+7  
6((ꢀ:$50(5  
&,5&8,7ꢀ',$*ꢉ  
+,ꢆ7(03ꢀ/,0,7  
7+(50267$7  
Wƒ  
%51  
%51  
ꢅꢅ9$  
75$16)250(5  
ꢁꢄꢅꢀRUꢀꢁꢂꢅ  
25*  
&20  
&211(&7ꢀ$335235,$7(/<ꢀ)25ꢀ92/7$*(ꢀ6833/<  
%/. %/.  
:+7  
%/8  
ꢁꢅ  
:+7  
ꢁꢅ  
:$7(5ꢀ,1/(7  
9$/9(ꢀꢁꢂYDF %/8  
%5(:ꢀ9$/9(ꢀ/()7ꢀꢁꢂYDF  
-  
%<3$66ꢀ9$/9(ꢀ/()7ꢀꢁꢂ9$&  
352%(6  
-ꢂ  
%5(:ꢀ9$/9(ꢀ5,*+7ꢀꢁꢂYDF  
%<3$66ꢀ9$/9(ꢀ5,*+7ꢀꢁꢂYDF  
:$7(5ꢀ7$1.ꢀ  
*5281'  
$ꢃꢄꢅꢆꢅꢃꢇꢀꢀ&21752//(5  
:$7(5  
-ꢂ  
-ꢄ  
/()7ꢀ6+877/(ꢀ6:,7&+ꢀ  
+($7(5  
5,*+7ꢀ6+877/(ꢀ6:,7&+ꢀ  
7+(50,6725  
352%(  
,%&4ġ4/5#(0!$  
2)'(4ġ4/5#(0!$  
+($7(5ꢀ5(/$<  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 39  
Wiring Diagram  
230V, 208V, or 240V without Neutral  
Models APB-330V2, APBVSA-330V2, APBIC-330V2, APB-330V2E230,  
APBVSA-330V2E230, APBIC-330V2E230  
:+7  
%/.  
/ꢁ  
/ꢀ  
&217$&725  
237,21$/  
0$67(5  
32:(5  
7(50,1$/ꢀ%/2&.  
/ꢁ  
/ꢁ  
1
/ꢀ  
32:(5  
/ꢀ  
6833/<  
ꢂꢅꢀ7$1.ꢀ+($7(5  
ꢂ9ꢆ  
ꢂꢅ9  
%51  
:+7  
%/.  
:+7  
6((:$50(5  
3%ꢆꢄꢄꢅꢀ02'(/6  
&,5&8,7ꢀ',$*ꢉ  
ꢀꢀꢅꢀ25ꢂꢅ9:505(/(07  
%/.  
%/. %/.  
+,ꢆ7(03ꢀ/,0,7  
/ꢁ  
7+(50267$7  
:$50(5  
Wƒ  
:$50(5ꢀ/,*+7  
%51  
6:,7&+  
%51  
:+7  
:+7  
/ꢀ  
ꢅꢅ9$  
75$16)250(5 ꢄꢅꢀRUꢀꢂꢅ  
25*  
%/8  
&20  
%/. %/.  
:+7  
&211(&7ꢀ$335235,$7(/<ꢀ)2592/7$*(6833/<  
ꢂ  
:+7  
ꢁꢀꢅ  
9:$$/79((5,1/Y(D7F  
%/8  
-  
%<3$669$/9(ꢂYDF  
352%(6  
-ꢂ  
%5(:9$/9(ꢂYDF  
:$7(5ꢀ7$1.ꢀ  
$ꢃꢄꢅꢆꢅꢃꢇꢀꢀ&21752//(5  
:$7(5  
*5281'  
-ꢂ  
-ꢄ  
+($7(5  
6+877/(6:,7&+ꢀ  
7+(50,6725  
352%(  
4/5#(0!$  
+($7(55(/$<  
Page 40  
Shuttle Brewers & Airpot/Shuttle Brewers  
Wiring Diagram - Heater Configuration (3 Heater)  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 41  
Wiring Diagram - Heater Configuration (1 Heater)  
Page 42  
Shuttle Brewers & Airpot/Shuttle Brewers  
Control Board  
all PrecisionBrew™ V2.0 models  
Refers to software version number.  
Subject to change.  
Shuttle Brewers & Airpot/Shuttle Brewers  
Page 43  
Tel (502) 425-4776 • Fax (502) 425-4664 • 1-800-695-4500 (USA & Canada only)  
P.O. Box 35020 • Louisville, KY 40232 • USA  
© Grindmaster Corporation, 2011  
PRINTED IN USA  
0611 Form # AM-346-03  
Part # A090-842  

Mitsubishi Electronics M341i User Manual
Maxtor DiamondMax 4R160L0 User Manual
Kyocera QCP 6035 User Manual
Keurig B150 User Manual
JVC KD SX995 User Manual
JVC 1004DTSMDTJEIN KD G152 User Manual
HoMedics DWS 170 User Manual
Hamilton Beach Coffeemaker TE118 User Manual
Fostex DV40 User Manual
Denon DCD CX3 User Manual