Installation
Instructions
If you have questions, call 800.GE.CARES or visit our website at: monogram.com
Island Vent Hoods
Models:
ZV42I
ZV54I
Download from Www.Somanuals.com. All Manuals Search And Download.
Design Information
CONTENTS
Design Information
Installation Instructions
Product Dimensions ......................................................................3
Duct Cover Accessories ..............................................................4
Product Clearances ......................................................................4
Step 1, Construct Ceiling Support ......................................10–12
Step 2, Mount Template..............................................................13
Step 3, Size and Install Ductwork ............................................13
Step 4, Install Support Frame and Duct Covers ....................14
Step 5, Install Duct Transition and Damper ..........................15
Step 6, Install Hood to Support ................................................15
Step 7, Connect Duct ................................................................15
Step 8, Connect Electrical..........................................................16
Step 9, Install the Motor ............................................................16
Step 10, Slide Duct Cover Down ..............................................17
Step 11, Install Filters..................................................................17
Step 12, Install Rods....................................................................17
Step 13, Install Supplied Duct Cover, Top Cover....................18
Step 14, Finalize Installation ......................................................18
Step 15, Installation Checklist ..................................................19
Advance Planning
Ductwork Planning ......................................................................5
Ceiling Framing for Support ........................................................5
Accessory Frames and Duct Covers ........................................5
Power Supply ................................................................................5
Installation Height ........................................................................6
Duct Fittings .................................................................................. 7
Installation Preparation
Tools and Materials Required ....................................................8
Remove the Packaging ................................................................8
Parts, Hardware, Accessory Packages ..................................9
42” HOOD DIMENSIONS
54” HOOD DIMENSIONS
Model ZV54I
Model ZV42I
14”
16”
25-3/4”
33”
20”
24”
31-3/4”
3/
36-1/4”
42”
54”
Supplied duct covers dimensions: 16"W x 12"D x 9"H
Supplied duct covers dimensions: 20-1/4"W x 12"D x 5"H
These vent hoods are supplied with a support frame and
decorative duct cover for ceiling heights of 7’11" to 8’5".
The hood installation height is determined by the ceiling
height. Accessories are available to reach ceiling
heights from 8’6" to 10’4".
3
Download from Www.Somanuals.com. All Manuals Search And Download.
Design Information
PRODUCT CLEARANCES
DUCT COVER ACCESSORIES
*Height
to Ceiling
20" For ZV42I
24" For ZV54I
30" Min.
36" Max.
36" Min.
ZV42I
* 9" for ceiling heights 7’11" to 8’5" using the supplied
support frame and duct cover.
Order ZX42DC10 for ceiling heights of 8"6" to 10’4".
These vent hoods must be installed 30" min. to 36" max.
above the cooking surface. Exact installation height is
determined by ceiling height. The cooking surface
should be at least 36” above the floor.
ZV54I
* 5" for ceiling heights 7’11" to 8’5" using the supplied
support frame and duct cover.
Order ZX54DC10 for ceiling heights of 8"6" to 10’4".
IMPORTANT: Clearances may vary due to type of
cooking product and local codes. Check with local
inspectors to be sure standard is applicable.
• When installing these Island Hoods above a
Monogram Professional Range or Cooktop,
installation clearance must be at least 30".
These accessories include telescoping support
frames and decorative covers. Order the accessory
for your model at the same time as the vent hood and
have on site before installation begins.
4
Download from Www.Somanuals.com. All Manuals Search And Download.
Advance Planning
ADVANCE PLANNING
POWER SUPPLY
Ductwork Planning
IMPORTANT - (Please read carefully)
• These vent hoods are equipped for 10” round
ductwork.
WARNING:
MUST BE PROPERLY GROUNDED.
• Determine the exact location of the vent hood.
• Plan the route for venting exhaust to the outdoors.
• Use the shortest and straightest duct route possible.
For satisfactory performance, duct run should not
exceed 150 ft. equivalent length for any duct
configurations.
• Refer to “Duct Fittings” chart to compute the
maximum permissible length for duct runs to the
outdoors.
FOR PERSONAL SAFETY, THIS APPLIANCE
ATTENTION –
POUR DES
RAISONS DE SÉCURITÉ, CET APPAREIL
DOIT ÊTRE CORRECTEMENT MIS À LA TERRE.
Remove house fuse or open circuit breaker before
beginning installation.
• Use rigid metal ductwork only.
• Install a roof cap with damper at the exterior opening.
Order the cap and any transitions needed in advance.
Do not use an extension cord or adapter plug with
this appliance. Follow National Electrical Code or
prevailing local codes and ordinances.
Ceiling Framing for Adequate Support
• These vent hoods are heavy. Adequate structural
support must be provided. The ceiling structure must
be capable of supporting the weight of the hood and
any inadvertent user contact loads (approximately 300
pounds). The hood support frame will be supported by
2 x 4 cross framing.
Electrical Supply
This vent hood must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp
circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above
requirements, call a licensed electrician before
proceeding.
• Route house wiring in the ceiling, as close to the
installation location as possible. Allow additional
length from ceiling joists to reach the junction box
on the bottom of the hood support frame.
• Connect the wiring to the house wiring in accordance
with local codes.
Accessory Frames and Duct Covers
• All models are shipped with a support frame and duct
covers for ceilings heights of 7’11" to 8’5".
• Optional accessories include telescoping support
frames and duct covers to reach 8’6” and up to
10’4” ceiling heights.
• Optional accessories must be ordered with the hood
and be on site before final framing and wall finishing.
Grounding Instructions
The grounding conductor must be connected to
a ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the hood.
Mounting the hood without a support frame
The distance between the cooking surface and the
bottom of the hood must be 30" to 36". In situations
where the ceiling is low, the hoods may be secured
directly to the ceiling without the supplied frame.
Use the bottom of the supplied support frame as a
template to locate the mounting holes in the top of the
hood. Use shims on the ceiling joists or cross framing
in the mounting hole locations. This will allow the
mounting screws to engage the recessed keyhole
slots in the top of the hood. See Step 2.
WARNING:
The improper
connection of equipment-grounding
conductor can result in a risk of electric shock. Check
with a qualified electrician or service representative if
you are in doubt whether the appliance is properly
grounded.
AVERTISSEMENT
Le mauvais branchement du fil de mise
à la terre peut causer un choc électrique. En cas
de doute, consulter un électricien qualifié ou un
technicien pour déterminer si l’appareil est à la terre.
5
Download from Www.Somanuals.com. All Manuals Search And Download.
Advance Planning
Model ZV42I
Chimney Length at
INSTALLATION HEIGHT REQUIREMENTS
Actual
Ceiling
Duct
• These vent hoods must be installed 30" min. and 36" max.
above the cooking surface – regardless of the ceiling
height. Therefore, installation height of the hood depends
on the exact ceiling height of the kitchen.
Hood Installation Height
Cover
Height 30" 31" 32" 33" 34" 35" 36" Kit
10’4"
10’3"
10’2"
10’1"
10’
9’11"
9’10"
9’9"
9’8"
9’7"
9’6"
9’5"
9’4"
9’3"
9’2"
9’1"
9’
8’11"
8’10"
8’9"
8’8"
8’7"
8’6"
8’5"
8’4"
8’3"
8’2"
8’1"
8’
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
33 32
32 31
31 30
30 29
29 28
28 27
27 26
26 25
25 24
24 23
23 22
22 21
21 20
20 19
19 18
18 17
17 16
16 15
15
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
Order
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
ZX42DC10
Use Long
Support
and
• Accessories are available for ceiling heights 8’6" and up
to 10’4".
Example: Hood installation height with 8 ft. ceilings.
Duct Cover
8 ft. Ceiling
8 ft. Ceiling
5"
9"
Supplied
Duct
Supplied
Duct
Order
Cover
Cover
ZX42DC10
Use Short
Support
and
31"
31"
ZV54I
Duct Cover
ZV42I
• Both models are shipped with a support frame and duct
cover for 7’11" to 8’5" ceilings.
• If the ceiling height is 7’11", the installation height above
the cooking surface will be 30".
• If the ceiling height is 8’5", the hood installation height
will be 36".
9
9
Use
9
Supplied
Support
and
DETERMINE INSTALLATION HEIGHT
1. Measure the exact ceiling height.
2. Review the chart to determine the range of hood
installation heights that can be accomplished
with or without an accessory kit.
9
9
9
Duct Cover
7’11"
9
Model ZV54I
Actual
Ceiling
Chimney Length at
Duct
Cover
Duct Cover
Hood Installation Height
Height 30" 31" 32" 33" 34" 35" 36" Kit
10’4"
10’3"
10’2"
10’1"
10’
9’11"
9’10"
9’9"
9’8"
9’7"
9’6"
9’5"
9’4"
9’3"
9’2"
9’1"
9’
8’11"
8’10"
8’9"
8’8"
8’7"
8’6"
8’5"
8’4"
8’3"
8’2"
8’1"
8’
28
28 27
27 26
26 25
25 24
24 23
23 22
22 21
21 20
20 19
19 18
18 17
17 16
16 15
15 14
14 13
13 12
12
Order
20" for ZV42I
24" for ZV54I
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
ZX54DC10
Use Long
Support
and
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
28
28 27
27 26
26 25
25 24
24 23
23 22
22 21
21 20
20 19
19 18
18 17
17 16
16 15
15 14
14 13
13 12
12
Ceiling
Height
Duct Cover
30" Min. and 36" Max.
Order
ZX54DC10
Use Short
Support
and
36"
to
Countertop
Duct Cover
ACCESSORIES
ZX42DC10 – Optional Accessory for ZV42I.
ZX54DC10 – Optional Accessory for ZV54I.
Accessories for ceiling heights of 8’6" to 10’4".
Includes telescoping support frames and duct
covers.
5
Use
5
Supplied
Support
and
5
5
5
Duct Cover
5
7’11"
5
6
Download from Www.Somanuals.com. All Manuals Search And Download.
Advance Planning
Equivalent Quantity Total
DUCT FITTINGS
Duct Piece
Length*
Used
Length
10" round
Use this chart to compute maximum
permissible lengths for duct runs to
outdoors.
For best results, use 10" diameter duct.
Note: Do not exceed maximum permissible
to 8" round
5 ft.
Round,
straight
1 ft.
(per foot
length)
equivalent lengths!
90° elbow
45° elbow
8" Dia. 52 ft.
10" Dia. 24 ft.
Maximum recommended duct
length for these hoods: 150 feet
8" Dia. 31 ft.
10" Dia. 14 ft.
Flexible ducting:
If flexible metal ducting is used, all
the equivalent feet values in the table
should be doubled. The flexible metal
duct should be straight and smooth
and extended as much as possible.
Round
wall cap
with damper
8" Dia. 99 ft.
10" Dia. 41 ft.
Round
roof cap
8" Dia. 136 ft.
10" Dia. 56 ft.
Do NOT use flexible plastic ducting.
Note: Any home ventilation system, such as a ventilation
hood, may interrupt the proper flow of combustion air and
exhaust required by fireplaces, gas furnaces, gas water
heaters and other naturally vented systems. To minimize
the chance of interruption of such naturally vented systems,
follow the heating equipment manufacturer’s guidelines and
safety standards such as those published by NFPA and
ASHRAE.
Total Duct Run
Hoods Are Equipped
For 10" Round Duct
*Hoods are supplied with a 10"
round transition. A locally
supplied transition is required
for other sizes.
Note: Outlet on top of hood is
8-1/8" x 8".
*Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are
based on actual tests conducted by GE Evaluation
Engineering and reflect requirements for good
venting performance with any ventilation hood.
7
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Preparation
TOOLS AND MATERIALS REQUIRED
7/16" Pivoting
hex socket with 4"
and 6" extensions
(NOT SUPPLIED)
Hammer
Duct tape
Electric or battery operated drill
and 3/16", bits, Phillips and Flat
Blade Screwdriver bits.
Wire cutter/stripper
Key Hole Saw
Pencil and tape measure
Spirit level
10" round metal
duct, length to
suit installation.
Safety glasses
Wire nuts
Flashlight
Phillips and flat blade
screwdrivers
Saber saw
or Sawsall
Strain relief for
junction cover.
Step ladder
120V 60Hz. 15 or 20 Amp,
2-wire with ground. Properly
grounded branch circuit.
Pliers
Metal Snips
Carpenter’s square
• Carefully, lay the hood on its side. A support frame is
secured to the inside top of the hood. Remove the
attachment screws at the outside top. Discard screws.
• Grasp the support
REMOVE THE PACKAGING
• Remove the parts packages and packing materials.
• Lift the hood out of the box.
frame inside the
hood with both
hands and
IMPORTANT:
Lift the hood by grasping
the outside edges of the exhaust opening on the top.
carefully rotate out
of the opening.
Be careful not to
Parts
Parts
Parts
scratch the hood.
Hood
Motor
Mounted
on Skid
Shipping Carton
• The hood motor is shipped secured to the skid with 4
screws. Locate and remove 2 screws on each side of
the motor. Discard the shipping skid and screws.
• Place the hood on a protective surface to prevent
scratches and damage to the stainless steel finish.
8
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
Allen Wrench
Support frame for 8 ft. ceiling
with 4 large pan head screws
installed on the bottom corners.
Transition with Damper
Implement rods with standoffs
2-piece decorative duct cover
Duct collar
Decorative top cover
2 Filters (3 with 54" hood)
2 Grease trays (3 with 54" hood)
HARDWARE PACKAGE
ACCESSORY PACKAGE
Locate and check
contents. Screws
shown actual size.
Check accessory package.
Select the taller set for 9’6" to 10’4" ceilings.
Select the shorter set for 8’6" to 9’6" ceilings.
Discard unused set.
Screws A
4 (7/16")
hex head
wood
screws
2 Sets of Duct Covers
Screws B
2 (1/8" x 1-1/2")
Phillips
pan head
screws.
2 Support Frames
with 8 height
adjustment
Screws D
2 small
Phillips
head
screws
2 Templates
screws
Screws C
8 blunt point
Phillips
4 Attachment Screws
screws
Screws E
2 Phillips
head wood
screws
Screw F
Blower safety screw and lock washer,
Phillips head M 6 x 16.
Note: Hardware appearance may vary slightly.
9
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 1 CONSTRUCT CEILING SUPPORT
Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location. The
countertop/cooktop below the hood must be centered
with the hood.
• The hood should extend beyond the front and rear edge
of the cooking appliance.
• The duct in the ceiling must be centered over the
cooktop.
Ceiling
Ceiling
Hood
Ducting
Centerline
Hood
Ducting
Centerline
Front
Front
18-1/8"
15-7/8"
36-1/4"
31-3/4"
Align With
Center of
Cooktop
Align With
Center of
Cooktop
Cooktop
Cooktop
Countertop
Countertop
54" Hood Side View
42" Hood Side View
Ceiling Support Structure
• At the hood location, install 2 x 4 cross framing between
ceiling joists as shown. (2x4’s are required to support the
weight of the hood.)
• Arrange cross framing in the ceiling to suit the existing
structure.
• Your ceiling joists will be like one of the following
examples.
12-3/4” (42” Hood)
17” (54” Hood) Install
EXAMPLE A
Cross-Framing
Symmetrically About
Duct/Cooktop Centerline
8 5/8”
10” Duct
16” Joist
Spacing
2x4 Cross
Framing
Align duct
to center of
Cooktop
Front
of
Cooktop
Outline
Hood
Top View – Ceiling Joists Parallel to Front of Hood
10
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 1 CONSTRUCT CEILING SUPPORT
CONTINUED
12-3/4” (42” Hood)
17” (54” Hood)
Install Cross-
Framing
Symmetrically About
Duct/Cooktop
Centerline
EXAMPLE B
16” Joist
Spacing
2x4 Cross
Framing
10” Duct
8 5/8”
Front
Cooktop
Outline
Align duct
to center of
Cooktop
of
Hood
Top View – Ceiling Joists Run Perpendicular to Front of Hood
EXAMPLE C
12-3/4” (42” Hood)
2x4 Cross
Framing
17” (54” Hood) Install Cross-Framing
Symmetrically About Duct/Cooktop
Centerline
8 5/8”
10” Duct
16” Joist
Spacing
Front
of
Align duct
to center of
Cooktop
Hood
Cooktop
Outline
Top View – Ceiling Joists at Angle with Front of Hood
11
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 1 CONSTRUCT CEILING SUPPORT
CONTINUED
• Secure each 2 x 4 block with at least four (4), #10 wood
screws, 3” long (not supplied). Use 8 wood screws
total for the two supports.
2x 4 Min.
Cross Framing
• The cross framing must be accurately aligned to
assure correct positioning of the hood.
• The cross framing must be level in all directions.
Check with a spirit level and adjust if necessary.
Ceiling
Joist
IMPORTANT: The ceiling structure must be capable of
supporting the weight of the hood (approximately 300
pounds) and any inadvertent user contact loads. The
hood support frame will be supported by the 2 x 4
cross framing.
8-5/8"
17"
(54" Hood)
12-3/4"
(42" Hood)
Height
Adjustment
Screw Holes
Ductwork
Ceiling Joint
• Use the shortest and straightest duct route possible.
For satisfactory performance, duct run should not
exceed 150 feet equivalent length for any duct
configuration.
10"
Duct
• Refer to “Duct Fittings” chart to compute the maximum
permissible length for duct runs to the outdoors.
• This vent hood must use 10” round rigid duct.
• Install the house ductwork to run horizontally between
ceiling joists or straight up through the roof.
2x4
Vent Straight Up
Through The Ceiling
Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location of
the ceiling joists and cross framing. Check to be sure
the ceiling is level, use shims if necessary.
12
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 2 MOUNT TEMPLATE
• Select the template for your hood size.
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly,
with the front of the hood.
• Use a plumb to check to be sure the mounting
holes will provide parallel alignment with the
countertop below.
• Center punch all hole locations.
1/4" Gap
• Drill pilot holes in the 4 screw locations. Use a
3/16” bit and drill approximately 1-1/2” deep.
• Drive 4 Hex head wood screws (Screws A) into
the center of the ceiling joists and cross framing.
Leave a 1/4" gap to allow the screw head to
engage the keyhole slots on the support frames.
• Cut the 10-1/2" duct opening through the sheet
rock.
Screws A
STEP 3 SIZE AND INSTALL DUCTWORK
• Measure from house duct flange to bottom of
support frame. Subtract 4-3/8" for clearance to the
bottom of the support frame.
House
Duct
• Cut the 10” duct length to size.
• Secure duct to house ducting with sheet metal screws.
• Seal all connections with duct tape.
• Attach the duct collar loosely, about 1" from the bottom
of the duct using Screws B.
Duct
Length
Duct
Duct
Collar
Screws B
4-3/8" Clearance
to Bottom of Frame
13
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COVERS
Install Small Pan Head
Screws on Each Side
Top Duct
Cover
Screws D
Bottom Duct
Cover
Adjust
Install
Safety Screw
on Each Side
Frame to
Install Stop
Screw
nstallation
Height
Screws E
Stop Screw
Storage Location
Install supplied support frame OR telescoping
accessory frame
• Hang the supplied support frame or telescoping
accessory frame to the ceiling joists and cross framing
on the 4 hex head screws by engaging the keyhole slots
on the frame.
CAUTION:
The stop screw
must be installed. Failure to do so could result in
personal injury or damage to the duct cover. The stop
screw will prevent the lower duct from sliding down
while completing the installation.
• Check to be sure the support frame is level, vertically
and horizontally.
• Tighten the hex head screws securely.
• Install safety screws, (Screws E) on each side of the
frame.
PRUDENCE
Il faut mettre en place la vis de butée afin d’éviter des
blessures ou d’endommager l’enceinte du conduit. La vis
de butée empêche l’enceinte inférieure du conduit de
descendre pendant l’installation.
Adjust telescoping accessory frame to length
• Remove the 8 frame adjustment screws. Adjust the
lower support up or down to the pre-determined length.
Reinstall and securely tighten the 8 adjustment screws.
• Slide the top (inner) accessory duct cover up and over
the frame. Secure the duct cover to the frame as shown
using Screws D.
Secure house wiring
• Route house wiring through the ceiling and pull a length
to reach the hood junction box, approximately 6” below
the support. Tape to the right side of the support frame.
• Locate and remove the safety stop screw. Slide bottom
duct cover up and over the top duct cover. Align bottom
duct screw hole to the hole in the frame. Hold the duct
cover in place while installing screw.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the hood
after the hood is secured to the frame.
14
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 5 INSTALL DUCT TRANSITION
STEP 6 INSTALL HOOD
WITH DAMPER
Note: THREE PEOPLE ARE REQUIRED TO
COMPLETE THIS INSTALLATION!
Bumper Pads
Duct
Transition
1/4" Gap
Attachment
Screws
Attachment
Keyholes
Screws C
IMPORTANT: Remove shipping tape from damper and
check that damper moves freely.
• Place the transition piece over the hood exhaust and
secure with 4 Screws C provided.
• Use duct tape to seal the connection. Check to be
sure the damper moves freely.
• Back out the hanging screws on the bottom of the
support frame to a 1/4" gap.
• Lift the hood up to the support frame. Carefully align
the hood keyhole to the screws on the support frame.
Slide the hood to engage the keyhole slots.
• Tighten the screws.
Install
2 Safety
Screws
Screws C
• Install safety screws into the top of the hood as
shown.
• Check hood level in both directions.
STEP 7 CONNECT DUCT
• Loosen duct collar and slide
Slide Duct
Collar Down
to Cover Gap
down to cover gap between
transition and house duct.
Tighten collar
screws and tape all joints.
• Seal all connections with duct
tape.
Note: Do not drive screws through this duct
connection. Doing so will prevent proper damper
operation.
15
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 8 CONNECT ELECTRICAL
Verify that power is turned off at the source.
• Install strain relief onto the knockout of the junction
box.
• Insert house wiring through strain relief and tighten.
• Use wire nuts to connect incoming ground to green,
white to white and black to black.
• Push wires into junction box and replace cover. Be sure
wires are not pinched.
WARNING:
If house wiring is not
2-wire with a ground wire, a ground must be provided
by the installer. When house wiring is aluminum, be
sure to use UL approved anti-oxidant compound and
aluminum-to-copper connectors.
ATTENTION –
Si le câblage de la
maison n’est pas du type à deux fils avec un fil de
terre, l’installateur doit fournir un circuit de terre.
Quand les fils de la maison sont en aluminium, il
prendre soin d’utiliser de la pâte antioxidation
approuvée par UL et des connecteurs pour
l’aluminium-cuivre.
STEP 9 INSTALL THE MOTOR
Top
IMPORTANT: Connector
ends are designed to
mate only one way.
Outlet
Match flat and round
connectors as shown.
Attachment
Slot
Spring
Clip
Attachment Screw
and Washer
Screw F
Attachment
Slot
Spring
Clip
Junction Box
• From the inside of the hood, slip motor into the
attachment slot on the left.
• Rotate motor upwards until it snaps into the spring
clip on the right.
• Plug cable at the top of the hood into the junction box
connector. Route cable so it won’t be pinched or
damaged when the duct cover is lowered.
• Secure the motor to the hood with the machine
screw and lock washer (Screw is marked with red
paint.)
• Plug blower cable into the connector on the blower.
16
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 10 SLIDE DUCT COVER
STEP 12 INSTALL RODS
DOWN
SKIP THIS STEP IF USING THE SUPPLIED DUCT
COVER
• Use a flat blade screwdriver to install stand-offs into
the bottom of the hood.
• Align implement rod to stand-offs with the screw hole
towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.
• Follow the same procedure on the opposite side.
• Hold the duct cover in place and remove the
temporary stop screw. Return the screw to the
storage location for future use.
• Slide the lower duct cover down onto the hood.
Remove
Stop
Screw
Slide
Duct
Cover
Down
Screw
Stand-offs
Into Hood
Stop Screw
Storage Location
Use Allen
Wrench to
Secure Rod
to Stand-offs
STEP 11 INSTALL FILTERS
• Place filter drip trays into the rear of the hood.
• Insert the filter into the upper opening and drop into
the trays.
• To remove the filters, grasp the knobs and push the
filter up and lift out.
17
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 14 FINALIZE INSTALLATION
STEP 13 INSTALL SUPPLIED DUCT
COVER AND TOP COVER
• Check all lamps to assure tightness in sockets.
• Turn power on at the circuit breaker.
• Refer to the Owner’s Manual for operating and
cleaning instructions.
Install Duct
Cover Screw
on Each Side
Screws D
• Install the supplied 2-piece duct cover over the
support frame (if using supplied frame). Snap ends
together.
• Secure duct covers to support frame with 2
Screws D.
• For a more finished appearance, a top cover is
supplied and should be installed whenever the top of
the hood is visible.
TIP: Place pieces
of tape over ends
of the cover to
prevent scratching Tape
the duct cover.
Tabs
Remove tape
before installing
screws.
• Engage tabs into slots on each side at the top of the
hood. The covers should lay flat in the impression on
top of the hood.
Top Cover
Screws C
Install Screws
Front and Back
• Install 2 Screws C to secure the cover to the hood at
the front and back.
18
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
STEP 15 INSTALLATION CHECKLIST
Check Blower Safety Screw
Check appearance and installation
■ Use a spirit level to check that the hood is level.
Review installation instructions to determine source
of problem.
■ Ensure that blower safety screw is securely tightened.
See page 16, Step 9. If screw is missing, order
replacement parts bag.
■ Top covers (if used) should lay flat in the recess on
top of the hood. Make sure side tabs are engaged in
slots and the cover is secured with two screws.
Check Operating Sound and Proper Air-Flow
■ Turn blower to each speed setting and listen for rattles
and vibration. You should notice an audible difference
at each speed setting.
■ Clean the hood surfaces and all filters. See the
Owner’s Manual for cleaning instructions. They
should be free of construction debris such as
sawdust.
■ Check for foreign material in transition.
■ Check that blower screen is not damaged or pushed
into the blower impeller.
■ The damper should move freely. Listen for opening and
closing while turning the unit on and off.
■ Check that the damper is not damaged, does not
vibrate and that damper bumper pads are in place.
Order a damper replacement assembly if needed.
■ Check that ductwork is 10" round. If duct type is not
rigid and less than 10" round, inform the consumer that
performance will be reduced.
Check Lighting Function
■ Check that power cable is plugged into the junction
box on top of the hood.
■ Turn halogen lamps to each setting. Note change in
brightness at different settings.
■ Check that each lamp bezel is secure. Turn to the right
to tighten. Order replacement lamp bezel and socket
assemblies if needed.
19
Download from Www.Somanuals.com. All Manuals Search And Download.
Note: While performing installations described in this book,
safety glasses or goggles should be worn.
For Monogram® local service in your area, call
1.800.444.1845.
Note: Product improvement is a continuing endeavor at
General Electric. Therefore, materials, appearance and
specifications are subject to change without notice.
GE Consumer & Industrial
Appliances
General Electric Company
Louisville, KY 40225
ge.com
Pub. No. 49-80209-3
01-08 JR
Download from Www.Somanuals.com. All Manuals Search And Download.
|