GE Monogram Ventilation Hood ZXR8510 User Manual

Installation  
Instructions  
If you have questions, call 800.GE.CARES or visit our website at: www.monogram.com  
ZXR858, ZXR859 and ZXR8510  
Recirculating Accessories  
For Model ZV850, Island Vent Hood  
M
o
n
og  
ra  
m
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Preparation  
REQUIRED ACCESSORIES  
• Order the required accessory at the same time as the  
vent hood and have on site before installation.  
• Each kit includes decorative duct covers, a support  
frame, air deflector and charcoal filters.  
This book provides step by step instructions to install  
the Monogram ZV850 ceiling mounted hood for  
recirculating operation.  
• One of the following accessory kits is required for non-  
vented ceiling mounted installations of model ZV850.  
Choose the correct kit according to ceiling heights:  
ZXR858 – For 8 ft. ceiling height.  
ZXR859 – For 9 ft. ceiling height  
ZXR8510 – For 10 ft. ceiling height.  
PRODUCT DIMENSIONS  
The vent hood must be installed 24min. and 30max.  
above the cooking surface. 25-1/2is recommended for  
best performance and to ensure that the duct cover  
meets the ceiling. The cooking surface should be at least  
36above the floor. Installation will be easier if the vent  
hood is installed before the cooktop and countertop is  
installed.  
*Height  
to Ceiling  
8-1/4"  
35-3/8"  
27-1/2"  
* 26-1/4” for 8 ft. Ceiling  
Using ZXR858 Accessory  
38-1/8” for 9 ft. Ceiling  
Using ZXR859 Accessory  
50-1/8” for 10 ft. Ceiling  
Using ZXR8510 Accessory  
*25-1/2" Recommended  
* The distance between the cooking surface and the bottom of the  
hood must be at least 24” and up to 30”. The 25-1/2” recommended  
installation height, above the standard 36” countertop, will ensure  
duct cover fit to the ceiling.  
36" Reference  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Preparation  
USING DUCT COVER ACCESSORIES  
POWER SUPPLY  
A duct cover accessory is required for all ceiling  
heights. Use this chart to determine the correct Duct  
Cover Accessory for 8-ft. to 10-ft. ceilings that must be  
ordered with the hood.  
IMPORTANT  
- (Please read carefully)  
WARNING:  
FOR PERSONAL SAFETY, THIS APPLIANCE MUST  
BE PROPERLY GROUNDED.  
ZV850SB Installation Heights  
Actual  
Remove house fuse or open circuit breaker before  
beginning installation.  
*Possible Hood  
Installation Height  
Ceiling  
Height  
Recirculating  
Accessory  
24-1/2  
Do not use an extension cord or adapter plug with  
this appliance. Follow National electrical codes or  
prevailing local codes and ordinances.  
711″  
Electrical supply  
25-1/2″  
80″  
This vent hood must be supplied with 120V, 60Hz,  
and connected to an individual, properly grounded  
branch circuit, and protected by a 15 or 20 amp  
circuit breaker or time delay fuse.  
• Wiring must be 2 wire with ground.  
• If the electrical supply does not meet the above  
requirements, call a licensed electrician before  
proceeding.  
• Route house wiring in the ceiling, as close to the  
installation location as possible. Allow an addi-  
tional 3 feet length from ceiling joists to reach the  
junction box on the hood.  
25-1/2to 26-1/2″  
25-1/2to 27-1/2″  
25-1/2to 28-1/2″  
25-1/2to 29-1/2″  
30max.  
81″  
82″  
83″  
84″  
85″  
86″  
87″  
88″  
89″  
810″  
811″  
90″  
91″  
92″  
93″  
94″  
95″  
96″  
97″  
98″  
99″  
910″  
911″  
100″  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
• Connect the wiring to the house wiring in accor-  
dance with local codes.  
Grounding instructions  
The grounding conductor must be connected to a  
ground metal, permanent wiring system, or an  
equipment-grounding terminal or lead on the hood.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
30max.  
WARNING:  
The improper connection of  
the equipment-grounding conductor can result in a  
risk of electric shock. Check with a qualified electri-  
cian or service representative if you are in doubt  
whether the appliance is properly grounded.  
TOOLS AND MATERIALS  
REQUIRED (NOT SUPPLIED)  
• Tape measure  
• Knife  
• Spirit level  
• 10 mm Hex wrench/socket  
• Safety glasses  
• Duct tape  
*Based on 36countertop height.  
• Wire cutter/stripper  
• Wire nuts  
• Electric drill and 5/32” bit  
• Phillips and flat-blade  
screwdrivers  
• Hammer  
• Pliers  
• Plumb  
9-7/16"  
ZV850SB Duct Cover Dimensions  
• Gloves to protect against sharp  
edges  
• 120V 60Hz. 15 or 20 Amp, 2 wire  
with ground. Properly grounded  
branch circuit.  
• Strain relief for junction cover  
• 6” round duct, length to suit  
installation  
Recirculating  
Installation  
B
A
B
15″  
22-1/2″  
27-15/16″  
14-3/16″  
21-7/8″  
26″  
ZXR858C  
A
ZXR859C  
ZXR8510C  
• Center punch  
15-3/4"  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Preparation  
Check contents of the required accessory,  
ZXR858, ZXR859 or ZXR8510.  
REMOVE THE PACKAGING  
The vent hood is packed separate from the required  
accessory: ZXR858, ZXR859 or ZXR8510.  
• Remove the frame, cover, parts box, side bars and  
packaging.  
Mounting Screw Holes  
• Remove junction box cover.  
• Install strain relief onto junction box cover.  
Check Installation Hardw are  
Locate the hardware accessory box packed with the  
hood and check contents.  
Support Frames  
With 8 Screws  
And 8 Washers  
Decorative Duct Covers  
4 Flat Washers  
2 Phillips Head  
Decorative Screws  
8 Frame Attachment  
Screws with Washers  
(attached to  
accessory  
support frames)  
4 Hex head  
wood lag screws  
(6mm x 2-1/2”  
or  
3 Charcoal Filters  
1/4 x 2-1/2")  
Front of Hood  
PLAN THE LOCATION  
Determine the exact location of the vent hood.  
• Use a plumb to check location to be sure countertop/  
cooktop location below the hood will align exactly.  
Template  
4 (10mm) Nuts  
and Lock Washers  
• The hood should project forward 1-1/2 beyond the front  
edge of the cooking appliance. See illustration.  
• Observe the recommended space between the cooking  
surface and bottom of hood.  
Check service manual  
envelope taped to the front  
on the hood to be sure it  
contains one stop screw.  
Leave this screw in the  
envelope.  
Ceiling  
Hood  
Ducting  
Centerline  
Hood  
3 Stainless Steel  
Grease Filters  
Front  
13-3/4"  
27-1/2"  
Approx. 1-1/2"  
Beyond Cooking  
Surface  
Cooktop  
2 side bars with 4 Machine screws  
Countertop  
Side View  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Preparation  
• The cross framing must be level in all directions.  
Check with a spirit level and adjust if necessary.  
INSTALL CEILING  
SUPPORT STRUCTURE  
• At the hood location, install 2 x 4 cross framing  
between ceiling joists as shown.  
Cross Framing  
• The 2 x 4 cross framing can be installed standing or  
flat. See illustration.  
Top View of Support Framing  
8-3/4"  
Cross  
Framing  
8-3/4"  
Ceiling  
Joist  
7-5/8"  
Support  
Frame  
Opening  
16"  
Joist  
*7-5/8"  
Upper Half  
Of Support  
Frame  
Front  
of  
Hood  
Typical Support Frame Mounting  
Height  
Adjustment  
Slot  
– The framing should be spaced 8-5/8” on the sides and 7-5/8”  
at the front from centerline to centerline to accept mounting  
screws in the vent support frame.  
IMPORTANT: The ceiling structure must be capable of supporting  
the weight of the hood (approximately 100 pounds) and any  
inadvertent user contact loads. It is recommended that the hood  
support frame be supported by a minimum of 2 x 4 cross framing.  
Cross  
Framing  
Ceiling  
Finish the Ceiling  
Once the ceiling is finished, mark the location of the  
ceiling joist and cross framing.  
• Check to be sure that ceiling is level, use shims if  
necessary.  
8-3/4"  
Front of  
Hood  
1
MOUNT TEMPLATE  
• Align the template with the marks on the ceiling  
Side  
View  
and tape in place.  
Support  
Frame  
– Be sure the template is oriented correctly, with the  
front of the hood.  
• Use a plumb to be sure the mounting holes will  
provide parallel alignment with the countertop  
below.  
Note: The cross framing must be spaced 8-3/4" on the side from  
centerline to centerline in order to accept the hood mounting  
screws.  
• Center punch all hole  
locations.  
• Drill pilot holes in the 4 screw  
locations. Use a 5/32bit and  
drill approximately 1-1/2″  
deep.  
• Cut wire access hole  
approximately 1dia.  
• Arrange cross framing in the ceiling to suit the  
existing structure. See examples.  
– Secure each 2 x 4 block with at least four (4), #10  
wood screws, 3long (minimum size screws, not  
supplied). Use 8 wood screws total for the two  
supports.  
Front of Hood  
• The cross framing must be accurately aligned to  
assure correct positioning of the hood.  
Wire Access Hole  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
2
3
INSTALL UPPER SUPPORT FRAME  
INSTALL LOWER SUPPORT FRAME  
• Install the plastic upper duct connector to the  
upper support frame by inserting from the bottom  
and snapping into the opening of the air deflector  
(already installed).  
• Secure the upper support frame to the ceiling joists  
and/or cross framing with the 4 screws provided.  
For maximum rigidity and strength, the screws must  
be driven into the center of the joists and/or cross  
framing.  
• Insert lower support frame (from required accessory  
ZXR858, ZXR859 or ZXR8510) into the upper  
support frame and loosely secure with 8 screws and  
washers (4 on the front and 4 on the back sides).  
• Adjust the lower support frame up or down to the  
desired height above the countertop. Tighten screws.  
• Check to be sure the support frame is level,  
vertically and horizontally.  
Hood  
Mounting  
Flange  
Lower Support  
13-5/8  
*39-1/8"  
Air  
Deflector  
25-1/2" Recommended  
**75-1/8"  
to Floor  
Upper  
Plastic Upper  
Front  
Support  
Duct Connector  
Of  
Frame  
Hood  
Countertop  
Support  
Frame  
Opening  
Check Level in  
Both Direction  
Lower  
Support  
Frame  
*Note: 39-1/8” to top of hood flange can be increased up to  
42” max.  
**75-1/8” min to floor, 77-7/8” max.  
Important: Again, check to be sure the support is  
level in both directions. There is no way to level the  
hood after the hood is secured to the frame.  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
4
5
SECURE WIRING  
SIZE AND INSTALL DUCTWORK  
• Route house wiring through the ceiling hole and  
pull a length to reach the hood junction box,  
approximately 6below the support.  
• Measure from top duct connector (Dim. A) to  
bottom of support frame.  
– Add at least 1for duct overlap at the top.  
– Subtract 1-3/4for hood insertion into the bottom  
of the frame.  
Ceiling  
• Cut the 6dia. duct to the required length.  
Front Side  
Ceiling  
Support  
Frames  
Duct Connector  
Tape  
Side  
View  
Support  
Required  
Frame  
Duct  
Length  
Dim. A  
Duct  
House  
Wiring  
Duct Connection  
To Hood  
1-3/4"  
• Tape the wire to the front of the frame support to  
prevent damage during installation and service.  
Bottom Support  
Frame Flange  
Note: The top and bottom of the duct are external  
(female) connections. The bottom end should be  
flared slightly, to facilitate installation of the hood.  
• Install duct up through support frames onto the top  
duct connector. Push duct up until it is 1-3/4from  
the bottom of support frame flange. See illustration.  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
6
INSTALL DECORATIVE DUCT COVERS  
Top Duct  
Cover  
Install Screw on  
Each Side  
Pretap  
2 Screw  
Holes  
Bottom Duct Cover  
Top Duct  
Cover  
Bottom Duct  
Cover  
Top Duct  
Cover  
Stop Screw  
Install Stop  
Screw in One  
of 3 Holes  
• Pretap or drive decorative screw into the screw holes  
on the support frame. This will make screw installation  
easier.  
• Separate the two decorative duct covers.  
• Select the inside (top) cover, which has vent hole  
pattern at the top.  
• Slide the lower decorative duct over the installed upper  
duct and push up, past the stop screw location.  
• Install the supplied temporary stop screw in one of 3  
holes in the support frame or the top duct cover to  
prevent the bottom decorative duct cover from sliding  
down.  
• Slide the decorative duct cover over the support frame  
and push to the ceiling.  
• Attach to the hood support at the top with 2 supplied  
decorative screws.  
• Locate the stop screw in the envelope taped to the  
front of the hood. Set aside.  
CAUTION:  
The stop screw must be installed.  
Failure to do so could result in personal injury or damage  
to the duct cover.  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
7 INSTALL HOOD  
Bottom  
Duct  
Cover  
Align Duct  
Connector to  
House Duct  
Align  
Mounting  
Stop Screw  
Studs  
Install  
4 lock  
washer  
and 4 Nuts  
• Check hood level in both directions.  
• Check to be sure that the duct is positioned over the  
hood connector.  
Note: TWO PEOPLE ARE REQUIRED TO COMPLETE  
THIS INSTALLATION!  
• Seal the duct connection with duct tape.  
Note: Do not drive screws through this duct connection.  
Doing so will prevent proper damper operation.  
• Lift the hood up to the support frame. Carefully align  
the hood mounting studs into the support frame holes,  
and at the same time, guide the hood duct connector  
into the duct.  
• Install 4 nuts and lock washers. Tighten with a 10mm  
wrench.  
8 CONNECT ELECTRICAL  
Verify that power is turned off at the source.  
WARNING:  
If house wiring is not 2-wire  
with a ground wire, a ground must be provided by  
the installer. When house wiring is aluminum, be  
sure to use UL approved anti-oxidant compound and  
aluminum-to-copper connectors.  
• Install strain relief onto the knockout of the  
junction box cover.  
• Insert house wiring through strain relief and  
tighten.  
• Connect white leads to branch circuit white lead.  
• Connect black leads to branch circuit black lead.  
• Connect green/yellow leads to branch circuit green  
or bare ground lead.  
• Secure all connections with wire nuts on each  
electrical connector.  
• Push wires into junction box and replace cover. Be  
sure wires are not pinched.  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
Install Charcoal Filters  
9 SLIDE DUCT COVER DOWN,  
INSTALL SIDE UTILITY BARS  
Upper Charcoal  
Filter Slots  
Grasp Tab,  
Lift and Pull Forward  
• Remove protective film on charcoal filters.  
• Tip charcoal filters into the upper (top) slots at the  
rear of the opening. Grasp the filter tab, lift and  
pull forward until it rests in the front slots.  
• Install all 3 charcoal filters.  
• Hold the decorative duct cover and remove the  
temporary stop screw from the support frame.  
Return the screw to the service manual envelope  
for future use.  
• Slide the lower duct cover down onto the hood.  
Install Grease Filters  
Lower  
Filter Slots  
• Remove protective film from grease filters.  
• Tip the grease filter into the lower slots at the rear  
of the opening. Lift the filter and pull the knob  
forward until the filter rests on the slots.  
• Install all 3 grease filters.  
• Install the side utility bars with screws as shown.  
• To remove the filters, grasp the knob, push the  
filter towards the rear and tilt downwards. Grasp  
tabs on charcoal filters, push towards the rear and  
tilt downwards.  
10 INSTALL FILTERS  
Upper Charcoal  
Filter Slots  
Lower Grease  
Filter Slots  
11 FINALIZE INSTALLATION  
• Remove the protective film covering the control  
panel on the front face of the hood, and any other  
packaging materials.  
• Refer to the Owner’s Manual for operating  
instructions.  
• There are two slots inside the back and front of the  
hood. These slots will hold the charcoal filters and  
stainless steel grease filters in place.  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Note: While performing installations described in this book,  
safety glasses or goggles should be worn.  
TM  
For Monogram local service in your area, call  
1.800.444.1845.  
Note: Product improvement is a continuing endeavor at  
General Electric. Therefore, materials, appearance and  
specifications are subject to change without notice.  
Pub. No. 49-80045-2  
04/07 JR  
GE Consumer & Industrial  
GE Appliances  
General Electric Company  
Louisville, KY 40225  
Printed in Italy  
monogram.com  
©2007 GE Company  
Download from Www.Somanuals.com. All Manuals Search And Download.  

EarthQuake Chainsaw CS3814 User Manual
Elation Professional Network Card 60 Strip II WA User Manual
Electro Voice Portable Speaker Coronet User Manual
Fellowes Paper Shredder SB 83I User Manual
Field Controls Switch LS 140A User Manual
Fundex Games Games Phase 10 Deluxe User Manual
Garmin GPS Receiver 1000 800 User Manual
GE Washer GBVH5140 User Manual
Gigabyte Computer Hardware GA VM800PMC User Manual
Gigabyte Network Card GA 8I945PLGE RH User Manual