Sterling Food Processor SSE 2 User Manual

Operating Instructions  
Single Conveying Hopper Loader  
SSE-2  
Sterling Material Processing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Sterling Material Processing retains all rights to change the information in these  
operating instructions at any time without notice.  
We assume no liability for any errors or direct or indirect damage resulting in context  
with these operating instructions.  
Copying, translation or publication in any form except for personal use of purchaser  
requires approval from Sterling Material Processing.  
All rights reserved.  
iii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
iv  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Please note that our address and phone information has changed.  
Please reference this page for updated contact information.  
These manuals are obsolete and are provided only for their technical information, data and capacities.  
Portions of these manuals detailing procedures or precautions in the operation, inspection, maintenance  
and repair of the products may be inadequate, inaccurate, and/or incomplete and shouldn’t be relied  
upon. Please contact the ACS Group for more current information about these manuals and their  
warnings and precautions.  
Parts and Service Department  
The ACS Customer Service Group will provide your company with genuine OEM quality parts manufactured to engineering  
design specifications, which will maximize your equipment’s performance and efficiency. To assist in expediting your phone  
or fax order, please have the model and serial number of your unit when you contact us. A customer replacement parts list  
is included in this manual for your convenience. ACS welcomes inquiries on all your parts needs and is dedicated to  
providing excellent customer service.  
For immediate assistance, please contact:  
North, Central and South America, 8am – 5pm CST +1 (800) 483-3919 for drying, conveying, heating and cooling  
and automation. For size reduction: +1 (800) 229-2919.  
North America, emergencies after 5pm CST (847) 439-5855  
North America email: [email protected]  
Mexico, Central & South America  
Europe, Middle East & Africa +48 22 390 9720  
India +91 21 35329112  
Asia/Australia +86 512 8717 1919  
Sales and Contracting Department  
Our products are sold by a worldwide network of independent sales representatives. Contact our Sales Department for the  
name of the sales representative nearest you.  
Let us install your system. The Contract Department offers any or all of these services: project planning; system packages  
including drawings; equipment, labor, and construction materials; and union or non-union installations.  
For assistance with your sales or system contracting needs please Call:  
(
)
North, Central and South America +1 262 641-8600 or +1 (847) 273-7700 Monday–Friday, 8am–5pm CST  
Europe/Middle East/Africa +48 22 390 9720  
India +91 21 35329112  
Asia/Australia +86 512 8717 1919  
Facilities:  
ACS offers facilities around the world to service you no matter where you are located. For more information, please visit us at  
Asia/Australia:  
India  
United States:  
ACS India  
ACS Suzhou  
Gat No. 191/1, Sandbhor Complex  
Mhalunge, Chakan, Tal Khed,  
Dist. Pune 410501, India  
Phone: +91 21 35329112  
Fax: + 91 20 40147576  
ACS Schaumburg – Corporate Offices  
1100 E. Woodfield Road  
Suite 588  
109 Xingpu Road SIP  
Suzhou, China 215126  
Phone: + 86 8717 1919  
Fax: +86 512 8717 1916  
Schaumburg, IL 60173  
Phone: + 1 847 273 7700  
Fax: + 1 847 273 7804  
Europe/Middle East/Africa
ACS New Berlin – Manufacturing Faci
2900 S. 160th Street  
ACS Warsaw  
Ul. Działkowa 115  
02-234 Warszawa  
Phone: + 48 22 390 9720  
Fax: +48 22 390 9724  
New Berlin, WI 53151  
Phone : +1 262 641 8600  
Fax: + 1 262 641 8653  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Table of Contents  
1. General instructions.........................................................................................................1-1  
1.1. Warnings and symbols ......................................................................................................................... 1-2  
1.2. Explanations and information .............................................................................................................. 1-3  
1.3. Legal basis ............................................................................................................................................ 1-3  
1.4. Fields of applications............................................................................................................................ 1-3  
1.5. Notes on usage...................................................................................................................................... 1-3  
2. Safety instructions ...........................................................................................................2-1  
2.1. For your safety...................................................................................................................................... 2-2  
2.1.1. General......................................................................................................................................... 2-2  
2.1.2. Assembly....................................................................................................................................... 2-3  
2.1.3. Operation ..................................................................................................................................... 2-4  
2.1.4. Maintenance................................................................................................................................. 2-4  
2.2. For the operating safety of the equipment........................................................................................... 2-5  
3. Transport, Assembly and Storage...................................................................................3-1  
3.1. Transport and Packing.......................................................................................................................... 3-2  
3.2. Assembly .............................................................................................................................................. 3-2  
3.3. Storage .................................................................................................................................................. 3-2  
4. Assembly instructions......................................................................................................4-1  
4.1. Unpacking............................................................................................................................................. 4-2  
4.2. Installing the Dump Valve Sensor....................................................................................................... 4-3  
4.3. Attaching the Pickup Wand.................................................................................................................. 4-4  
4.4. Mounting............................................................................................................................................... 4-5  
4.4.1. Mounting on the processing machine ......................................................................................... 4-6  
4.4.2. Mounting onto a machine hopper ............................................................................................... 4-6  
4.4.3. Mounting onto mixing hoppers with lateral inlet ....................................................................... 4-7  
4.4.4. Mounting onto dosing station DT 30 .......................................................................................... 4-7  
4.5. Electrical connection ............................................................................................................................ 4-8  
4.6. Installation of the optional SKW proportioning valve........................................................................ 4-9  
5. Functional Description ....................................................................................................5-1  
5.1. Sequence of Operation ......................................................................................................................... 5-2  
5.2. Controller.............................................................................................................................................. 5-2  
6. Operation .........................................................................................................................6-1  
6.1. Switching on the unit............................................................................................................................ 6-2  
6.2. Checking the Flexible Hose ................................................................................................................. 6-2  
6.3. Setting the Conveying Time................................................................................................................. 6-3  
6.4. Setting the Purge Time (optional)........................................................................................................ 6-4  
6.5. Initial Operation.................................................................................................................................... 6-5  
6.6. Switching off the unit........................................................................................................................... 6-5  
7. Troubleshooting...............................................................................................................7-1  
7.1. Alarms................................................................................................................................................... 7-2  
v
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8. Maintenance.....................................................................................................................8-1  
8.1. Maintenance intervals........................................................................................................................... 8-3  
8.2. Servicing the Loader............................................................................................................................. 8-4  
8.2.1. Changing the sealing ring of the outlet flap ............................................................................... 8-4  
8.2.2. Adjusting the dump valve sensor................................................................................................. 8-5  
8.2.3. Cleaning the unit.......................................................................................................................... 8-6  
8.2.4. Replacing carbon brushes at the motor...................................................................................... 8-8  
9. Technical data..................................................................................................................9-1  
10. Spare parts list ............................................................................................................... 10-1  
10.1. SSE-2, 230 V, 50 Hz ........................................................................................................................ 10-3  
10.2. SSE-2, 110 V, 60 Hz ........................................................................................................................ 10-4  
10.3. SSE-2, 230 V, 50 Hz with active cleaning ...................................................................................... 10-5  
10.4. SSE-2, 110 V, 60 Hz with active cleaning ...................................................................................... 10-5  
11. Accessories ..................................................................................................................... 11-1  
12. Electrical manual........................................................................................................... 12-1  
vi  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
1. General instructions  
M
These instructions apply to all persons within the range of action of the  
equipment.  
These operating instructions are to be used by all persons assigned activities  
connected with the equipment.  
General instructions 1-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
1.1. Warnings and symbols  
The following warnings and symbols are used in these operating instructions:  
M
This symbol indicates danger to life. Fatal or serious injury is possible if the  
corresponding instructions, regulations or warnings are not observed.  
L
This symbol indicates that serious injury is possible if the corresponding  
instructions, regulations or warnings are not observed.  
F
&
$
This symbol indicates that extensive damage to equipment is possible if the  
corresponding instructions, regulations or warnings are not observed.  
This symbol indicates information important for becoming familiar with the  
equipment, i.e. technical correlations.  
This symbol indicates that a technical term is explained at this point.  
1-2 General instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
1.2. Explanations and information  
Various terms are used in these operating instructions to ensure clarity. Therefore  
please note that the terms used in the text stand for the corresponding explanations  
listed below.  
Equipment: ”Equipment” can mean an individual unit, a machine or an installation.  
Operating personnel: The ”operating personnel” are persons operating the  
equipment on their own responsibility or according to instructions.  
Operator: The ”operator” of the equipment (production manager, foreman, etc.) is the  
person responsible for all production sequences. The operator instructs the operating  
personnel of what is to be done.  
Operating instructions: The ”operating instructions” describe the interaction of the  
equipment, production sequences or methods. The operating instructions must be  
compiled by the operator of the equipment.  
Equipment foreman: When several operating personnel work on one machine, the  
”equipment foreman” coordinates the sequences. The equipment foreman must be  
appointed by the operator.  
Trained personnel: ”Trained personnel” are persons who, due to their training, are  
authorized to carry out the required work.  
1.3. Legal basis  
See “Manufacturer’s Certificate” resp. “Certificate of Conformity”.  
1.4. Fields of applications  
Sterling single conveying units are designed for use in facilities that require independent  
machine conveying systems. The single conveying units have been developed for  
conveying thermoplastic granules. A typical area of application is for processing  
machines and drying hoppers with throughputs of up to 400 lbs./hr (180 kg/h).  
1.5. Notes on usage  
Experienced operators can begin directly with the chapter on “Start-up” if the unit has  
been properly installed.  
If the unit has not been installed yet, observe the instructions in the chapters  
“Transport, Assembly and Storage” and “Assembly Instructions”.  
General instructions 1-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
2. Safety instructions  
M
These safety instructions apply to all persons within the range of action of the  
equipment, and should be used by all persons assigned activities connected  
with the equipment.  
Please inform all persons within the range of action of the equipment of the  
direct and indirect hazards connected with the equipment.  
Knowledge of the English language is prerequisite.  
Ensure that all operating personnel are familiar with the operating instructions  
and the function of the equipment.  
Safety instructions 2-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
2.1. For your safety  
2.1.1. General  
To prevent injury and/or damage to equipment, observe the following safety rules:  
Read these operating instructions carefully before operating for the first time. Contact  
us should questions arise.  
These operating instructions must be kept available at all times at the place of  
operation of the equipment.  
Please note that, for reasons of clarity, not all conceivable cases regarding operation  
or maintenance of the equipment can be covered in these operating instructions.  
Observe all safety instructions and warnings on the equipment.  
All work on the equipment is to be carried out by persons whose qualifications are  
specified in the pertaining chapters of the operating instructions.  
Wear proper working clothes while performing any work on the equipment.  
The local regulations and requirements pertaining to this equipment must be  
observed.  
Disconnect electrical components from the main power supply before work is carried  
out on these components  
Compile detailed operating instructions based on these operating instructions for the  
sequence of procedures to be carried out on this equipment.  
Please note that sound levels exceeding 85 db(A) may in the long term damage your  
health. Use appropriate ear protection to prevent hearing impairment.  
2-2 Safety instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
2.1.2. Assembly  
To prevent injury and/or damage to equipment, observe the following safety rules:  
Compare the connected loads with those of the main supply.  
Use care when using lifting gear, and observe any pertaining regulations.  
Do not modify, add other equipment or change the design of the equipment without  
the approval of the manufacturer.  
Attachments not supplied by Sterling must be manufactured in accordance with  
safety regulation EN 294.  
Make sure all the accessories and components are properly connected in  
accordance with any relevant regulations.  
To prevent electrical shock, operate the device only if all its components are  
grounded.  
Do not allow solid particles and dust to enter to the vacuum generator.  
Safety instructions 2-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
2.1.3. Operation  
To prevent injury and/or damage to equipment, observe the following safety rules:  
Appoint an equipment foreman to be responsible for the equipment.  
Ensure that the operating personnel are provided detailed instruction in the operation  
of the equipment.  
When the main switch is switched off for reasons pertaining to safety, it must be  
secured against unauthorized activation.  
Repair work may be carried out by trained personnel only.  
Never operate the equipment when partially dismantled.  
In case of malfunction, shut down the equipment immediately. Have malfunctions  
corrected immediately.  
The equipment is intended only for conveying granulated plastics and regrinds. Any  
other or additional use is contrary to specifications.  
This equipment is not suitable for food processing.  
The safety instructions of the connected machines must be followed.  
Explosive gases and mixtures of gas and air must not be conveyed.  
2.1.4. Maintenance  
To prevent injury and/or damage to equipment, observe the following safety rules:  
Before starting maintenance work, appoint a supervisor.  
Inform the responsible personnel before maintenance work on the system is started.  
Disconnect the equipment from main supply before starting maintenance procedures  
to ensure that it cannot be switched on unintentionally.  
All pipes, hoses and screwed connections should be checked regularly for leaks and  
damage. Any faults that arise should be corrected immediately.  
Depressurize all compressed air piping before starting maintenance work.  
2-4 Safety instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
2.2. For the operating safety of the equipment  
Never change settings if the consequences are not precisely known.  
Use only original Sterling spare parts.  
Please observe the maintenance schedule.  
Keep record of all maintenance and repair work.  
Please note that electronic components may be damaged by static discharge.  
Check all electrical connections for proper fit before the equipment operated for the first  
time and at regular intervals.  
The operating temperature range is 32 to +113 °F (0 °C to +45 °C).  
The recommended storage temperature range is -13 to +131 °F (-25 °C and +55 °C).  
Write down all data that you have entered into the control system.  
Please ensure that all plugs are correctly plugged in.  
The operating instructions of the connected machines must be followed.  
Operate the device only if all its components are grounded.  
Never adjust sensors without exact knowledge of their function.  
Please note that a compressed air supply is required for the operation of the active  
cleaning option.  
Compressed air supply for the active cleaning option should not exceed 87 PSI (6 bar)  
(active cleaning option only).  
Align the suction tubes correctly.  
The unit should be installed in such a way that the outlet flap swings at right angles to  
the moving direction of the equipment.  
The load-bearing capacity of the machine flange should be adhered to.  
A level indicator is required when conveying from granulators.  
The maximum conveying capacity is up to 400 lbs./hr (180 kg/hr) at 100% operating  
time.  
The typical conveying capacity is up to 200 lbs./hr (90 kg/hr) at 50 % operating time.  
Safety instructions 2-5  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
3. Transport, Assembly and Storage  
M
This chapter is intended for all operating personnel of the equipment.  
Personnel using these instructions must be instructed in the regulations for  
the prevention of accidents, the operating conditions and safety regulations  
and their implementation.  
Ensure in each case that the operating personnel are sufficiently informed.  
Please inform all persons within the range of action of the equipment of the  
direct and indirect hazards connected with the equipment.  
Please observe all safety regulations for the operation of lifting equipment.  
Transport, Assembly and Storage 3-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
3.1. Transport and Packing  
M
Please ensure adequate carrying capacity of the lifting equipment.  
The equipment passes rigorous testing in the factory and is packed carefully to avoid  
transport damage.  
Please check packing on delivery for transport damage.  
The inlet and discharge flanges are sealed with plugs, so that no dirt can enter during  
transport. Plugs must be removed before assembly.  
Packing materials should be disposed of according to environmental laws or reused.  
Only use for transport of the equipment a suitable lifting device (e. g. a fork lift truck or a  
workshop crane).  
Transport must be shock-proofed and free from vibrations.  
3.2. Assembly  
M
Please ensure adequate carrying capacity of the lifting equipment.  
Check the carrying capacity of the point of installation, particularly if installed  
on a platform.  
The place selected for installation should be as free of vibrations as possible.  
The main power switch must be freely accessible.  
Ground the equipment against electrostatic charging.  
3.3. Storage  
The control system may only be stored at temperatures from -13 to +131 °F (-25 to  
+55°C).  
Between delivery and machine commissioning, the equipment should be stored in a dry,  
dust-free and vibration-free room.  
3-2 Transport, Assembly and Storage  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4. Assembly instructions  
M
These installation instructions are intended for persons with skills in electrical  
and mechanical areas due to their training, experience and received  
instructions.  
Personnel using these installation instructions must be instructed in the  
regulations for the prevention of accidents, the operating conditions and  
safety regulations and their implementation.  
Ensure in each case that the personnel are sufficiently knowledgeable about  
the equipment.  
The installation instructions provided in the corresponding operating  
instructions apply for all connected equipment.  
Please observe all safety regulations for the operation of lifting gear.  
All installation work must be carried out with the equipment disconnected from  
electrical power and compressed air supply.  
L
For installation work taking place at heights of over approx. 6 feet, use only  
ladders or similar equipment and working platforms intended for this purpose.  
At greater heights, the proper equipment for protection against falling must be  
used.  
Use only suitable lifting gear that is in proper working order and load  
suspension devices with sufficient carrying capacity. Do not stand or work  
under suspended loads!  
Use only suitable workshop equipment.  
F
Install the equipment so that all parts are easily accessible; this facilitates  
maintenance and repair work.  
Assembly instructions 4-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.1. Unpacking  
The loader is insensitive to shocks and can be  
mounted directly onto the processing machine,  
on a machine hopper, a drying hopper or a  
dosing and blending unit.  
The equipment is delivered as a complete  
assembly.  
Use the following procedure to prepare the  
machine for assembly:  
1. Unpack the equipment.  
2. Remove the plastic stopper (A) from the  
material inlet nozzle.  
3. Open the flap (B) and remove the adhesive  
tape from the exit flap.  
F
The controller must be freely accessible.  
Figure 1: SSE 2  
4-2 Assembly instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.2. Installing the Dump Valve Sensor  
The controller uses a dump valve sensor (A) with a  
magnet (B) to determine demand. When the  
dump valve is closed, indicating demand, the  
magnet is pushed towards the sensor. The  
presence of the magnet near the sensor indicates  
demand and triggers a new conveying cycle.  
When the dump valve is open, indicating that no  
material is needed, the magnet is pushed up and  
away from the sensor. If the sensor does not  
detect the magnet, it does not trigger a new  
conveying cycle.  
Figure 2: Dump valve and sensor  
To install the dump valve sensor, insert the  
appliance plug of the dump valve sensor into the connector (Figure 3) on the lower side  
of the controller.  
Figure 3: Lower side of the controller  
Assembly instructions 4-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.3. Attaching the Pickup Wand  
Use the following procedure to attach the pickup wand:  
1. The pickup wand must be connected to flexible hose to allow sufficient movement.  
The length of the hose should not exceed 10 feet (3 meters). Push the free pipe end  
approximately 1.5” to 2” (4-5 cm) into the hose. Use a hose clamp to secure the  
connection. The flex hose should not cover the aeration holes on the pickup wand.  
2. Slide the flexible hose onto the material inlet. Use the hose clamps supplied to  
secure the flex hose.  
The pickup wand needs no adjustment for most applications. Insert it into the material to  
be conveyed and turn the loader on. Some applications require a more defined air-to-  
material ratio.  
The pickup wand can be angled up to approximately 45 degrees in either direction to the  
vertical. Additional fastening is not required.  
When conveying from the bottom of storage containers (silos, surge bins, blender bins,  
etc.), a suction box is required.  
4-4 Assembly instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.4. Mounting  
Please check during assembly that the admissible bearing loads are not exceeded.  
Mount the loader in such a way that the outlet flap swings in a right angle to the direction  
of machine movement.  
Please check that all connecting points are tight to ensure that the conveying  
performance is not impaired.  
Figure 4: Mounting  
Assembly instructions 4-5  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.4.1. Mounting on the processing machine  
A material hopper VT 1.0 is required:  
1. Mount the material hopper onto the  
flange of the processing machine.  
2. Mount the unit onto the material  
hopper.  
Figure 5: VT 1.0  
F
Observe the bearing capacity of the machine flange.  
4.4.2. Mounting onto a machine hopper  
A welding flange EF 190 is required:  
L
Please observe all safety regulations  
for the operation of welding  
equipments.  
Always wear safety goggles.  
Figure 6: EF 190  
1. Weld the welding flange into the machine hopper lid.  
2. Mount the unit onto the flange.  
4-6 Assembly instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.4.3. Mounting onto mixing hoppers with lateral inlet  
A material hopper VT 1.0 is required:  
1. Mount the material hopper onto the  
swan-neck of the mixing hopper.  
2. Mount the unit onto the intermediate  
hopper.  
Figure 7: VT 1.0  
F
Observe the bearing capacity of the machine flange.  
4.4.4. Mounting onto dosing station DT 30  
A dosing hopper DT 30 (12.6”, 320 mm high) is required:  
1. Mount the dosing hopper directly onto the dosing container of the dosing station DT  
30.  
2. Mount the unit onto the dosing hopper.  
Figure 8: DT 30  
F
Observe the bearing capacity of the machine flange.  
Assembly instructions 4-7  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.5. Electrical connection  
M
The regulations of the local Electricity Board must be observed.  
Before connection to the electricity supply, ensure that the supply voltage and  
the power frequency are in accordance with the data on the nameplate of the  
machine.  
The electrical connection may only be carried out by Sterling service staff or  
trained personnel authorized by Sterling.  
It is not permitted for other persons to undertake the electrical connection.  
The main switch must be freely accessible.  
Ground the equipment against electrostatic charging.  
The operating voltage is 110V/1/60 Hz. Special voltages are available on request.  
The connected load is approx. 800 W.  
The equipment is connected to main power supply by a standard plug.  
Separate fuse protection of the wall socket is required (max. 16 A).  
4-8 Assembly instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
4.6. Installation of the optional SKW proportioning valve  
&
Before proceeding, review the connecting diagram included with the unit.  
For more information, refer to the manual that shipped with the SKW valve.  
Connecting the SKW-E proportioning valve:  
Control and power of the proportioning valve is supplied through a 4-wire control  
connection.  
Brown  
Positive Power  
Negative power  
Line signal  
X7, L  
X7, N  
X7, ZKW  
X3  
Blue  
Black  
Green w/ Yellow  
Ground  
1. Remove the control box face, and locate the removable plug in the bottom of the  
box.  
2. Remove the plug and feed the wire of the proportioning valve through the empty  
hole.  
3. Tighten the lock nut inside, position the wire length for optimum use and tighten the  
lock nut on the outside.  
4. Strip the wires so that 1/4” of wire is showing, for connection to terminal blocks.  
5. Upon removal of the loader control face you will see two printed circuit boards. One  
board on the reverse of the control face, and the other mounted inside the control  
box. The ground wire will connect to the terminal block X3 on the back of the control  
face. The other three wires connect to terminal block X7 inside the control box, in  
order from left to right Brown, Blue, then Black. Please refer to the schematic in the  
back of the manual.  
Assembly instructions 4-9  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Connecting Material Lines:  
Component 1 – connected to the intake port furthest from the air cylinder (regrind)  
Component 2 – connected to the intake port closest to the air cylinder (virgin)  
Setting the ratio:  
When the loader motor is not running, pressing the arrow key on the valve’s controller  
will change the percentage of component 1. This can be set from 0% to 99%  
Set the cycle switching:  
Press and hold the percentage key on the valve’s controller. Then by pressing the up  
arrow, you will be selecting the cycle time period in increments of 5 sec.  
For example, if the convey time is 60 seconds and you select a cycle time period of 10  
sec. the valve will switch a total of 6 times.  
4-10 Assembly instructions  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
5. Functional Description  
M
This functional description is intended for all operating personnel of the  
equipment.  
General knowledge of conveying systems is required to operate the equipment  
Ensure in each case that the operating personnel are sufficiently  
knowledgeable about the equipment.  
Functional Description 5-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
5.1. Sequence of Operation  
The sequence of operation is as follows:  
1. Plug in the machine and move the on/off switch to the “on” position  
2. All LEDs on the controller will blink, and the software version is displayed on the  
screen.  
3. A 2-second blowback pulse will clean the filter. During blowback, the screen will  
display “A2.”  
4. The motor starts, and conveying begins. The screen displays a countdown of the  
conveying time. Conveying time can be set for 1-99 seconds.  
5. If the optional purge valve is installed, line purging begins, and the screen displays a  
countdown of purge time. Purge time can be set for 0-99 seconds.  
6. The motor shuts off for 8 seconds while material dumps. The screen displays “L8.”  
The 8-second dump time is a fixed setting and is not adjustable.  
7. The controller checks for demand, and if material is needed, the cycle starts over  
from step 3.  
5.2. Controller  
3 LEDs indicate the respective modes of operation: blowback, conveying, purging, and  
dumping.  
Conveyin  
Blowback  
Purging  
Dumping  
Blowba  
Conveyi  
Purgi  
Change-  
Figure 9: Controller  
Arrow Key  
5-2 Functional Description  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
6. Operation  
M
This chapter is intended for operating personnel.  
General knowledge of the operation of conveying systems is required to  
perform these tasks. Make sure you have read and understood the Functional  
Description chapter in this manual before operating the equipment.  
Ensure that all operating personnel are sufficiently knowledgeable about the  
equipment.  
F
Make sure the plastic stopper has been removed from the material inlet nozzle.  
Make sure the adhesive tape has been removed from the exit flap.  
Operation 6-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
6.1. Switching on the unit  
Locate the power switch on the left side of the control box and switch it to the “on”  
position.  
6.2. Checking the Flexible Hose  
Before operating the equipment, check to make sure the suction is working:  
1. Remove pickup wand from the flexible hose.  
2. Cover the open end of the hose with your hand.  
3. Connect the unit to the main power supply and turn the machine on.  
a. If the motor is operating, your hand will feel the suction within few seconds.  
b. If you don’t feel the vacuum, the flexible hose is not tight.  
4. Check the hose and seal any loose points you may have identified.  
5. Reconnect the pickup wand.  
6-2 Operation  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
6.3. Setting the Conveying Time  
F
Do not overfill the hopper loader  
&
The conveying time cannot be set while the unit is in the process of conveying  
material.  
By correctly setting the conveying time, you can reduce vacuum motor wear, save  
energy, and reduce your need to maintain filters:  
1. Turn on the hopper loader  
2. Observe the flex hose and the material in which you buried the pickup probe. Listen  
to the vacuum motor and the sound that the material makes as it enters the hopper  
loader.  
3. When the hopper loader is full, the conveying rate drops off sharply. You can  
observe this condition in the clear flex hose and the material container in which you  
buried the pickup probe. When the hopper loader is full, the vacuum motor and  
material sounds also change.  
4. Make a note of the elapsed time from the start of conveying to the time the hopper  
loader is full.  
5. Turn the hopper loader off  
6. Disable the conveying cycle by disconnecting the dump valve sensor from the  
controller. With the dump valve sensor disabled, no demand will be indicated, and  
the conveying cycle will not start.  
7. Turn the hopper loader on.  
8. Use the arrow key to adjust the conveying time to slightly shorter  
than it takes to fill the hopper loader. For example, if the hopper is  
full by the 30-second point of the conveying sequence, set the  
conveying time to 28 seconds.  
NOTE: To decrease the load time setting it is necessary to cycle the time setting past 99 and  
then to the desired setting. There is no “down” button.  
9. With the new time setting entered, reconnect the dump valve sensor. Conveying  
should start again.  
&
The conveying time that was last selected appears in the display.  
The conveying time can be set at 1 to 99 seconds.  
If the hopper loader is overfilling, reduce the conveying time.  
If the hopper loader is not filling to capacity, increase the conveying time.  
10. Check operation to ensure proper settings. If settings are not right, repeat steps 1-9.  
Operation 6-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
6.4. Setting the Purge Time (optional)  
To set the purge time, press and hold the “change-over” key while using the “arrow key”  
to adjust the time.  
&
The purge time that was last selected appears  
in the display.  
The purge time can be set at 1 to 99 seconds.  
F
If no line clearing valve has been installed, enter “0".  
1. Turn the hopper loader off.  
2. Disable the conveying cycle by disconnecting the dump valve sensor from the  
controller. With the dump valve sensor disabled, no demand will be indicated, and  
the conveying cycle will not start.  
3. Turn the hopper loader on.  
4. Enter a conveying time setting. (See Section 6.3. on page 6-3.)  
5. Enter a purge time. This is done by pressing (and holding) the change-over key (the  
bottom and center LED should be lit). Then pressing the arrow key. The purge time  
on the display will increase.  
6. Reconnect the dump valve sensor. Conveying should start.  
7. Verify both the load time and purge time settings. This can be done by observing the  
conveying cycle. When loader motor starts it will convey material for the time  
entered. After this time expires, the motor stays on and the line clearing valve is  
activated. At this time, the conveying line will be “purged” clean of material. When  
the settings are correct, the load time is just long enough to pull the desired amount  
of material into the conveying line and the purge time is just long enough to clean out  
the line. Once both of these functions are complete, the material level in the hopper  
should be at the material inlet level, but not above. If this is not the case readjust the  
settings by repeating steps 1-7.  
NOTE: To decrease the load time and purge settings, it is necessary to cycle the time setting  
past 99 and then to the desired setting. There is no “down” button.  
8. Once the settings are optimized, the loader is ready for operation.  
6-4 Operation  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
6.5. Initial Operation  
Metal shavings may be inside the pipe from cutting down pipes into lengths. These are  
pulled during the first conveying process and collected in the separator.  
F
This material should not be used again.  
6.6. Switching off the unit  
Locate the power switch on the left side of the control box and switch it to the “off”  
position.  
Operation 6-5  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
7. Troubleshooting  
M
This chapter is intended for the operating personnel of the equipment.  
General knowledge of the operation of conveying systems is required to  
perform these tasks.  
Make sure you have read and understood the “Start-up” section of this manual  
before proceeding.  
Ensure that the operating personnel are sufficiently knowledgeable about the  
equipment.  
Troubleshooting 7-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
7.1. Alarms  
An alarm will be triggered if there is no material to convey or if the loader overheats.  
&
An “E” appears in the display and an error number.  
And alarm will sound.  
F
Do not restart operation until the malfunction has been corrected.  
The following error messages can be displayed:  
“E1"  
The alarm message “E1" is displayed when no material has been conveyed during 3  
consecutive conveying cycles.  
Check that sufficient material is being conveyed.  
Check that the flap switch is set correctly.  
As supplied, this feature is disabled. To enable it:  
1. Turn the loader off and remove power.  
2. Remove the cover from the control.  
3. Remove the two wires that are connected to terminals X9 and X6  
4. Replace the cover and turn the loader on.  
“E2"  
If the control system becomes too hot during operation (>158°F, 70°C) the “E2" alarm  
message is displayed and the unit is switched off.  
Allow the system to cool before restarting.  
&
When the malfunction has been corrected, turn the power off and then on  
again to restart.  
7-2 Troubleshooting  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8. Maintenance  
M
This chapter is intended for persons with skills in electrical and mechanical  
areas due to their training, experience and received instructions.  
Personnel using the instructions in this chapter must be instructed of the  
regulations for the prevention of accidents, the operating conditions and  
safety regulations and their implementation.  
Ensure in each case that the personnel are sufficiently knowledgeable about  
the equipment.  
For maintenance work taking place at heights of over approx. 6 feet, use only  
ladders or similar equipment and working platforms intended for this purpose.  
At greater heights, the proper equipment for protection against falling must be  
worn.  
Use only suitable lifting gear that is in proper working order and load  
suspension devices with sufficient carrying capacity. Do not stand or work  
under suspended loads!  
Ensure that the electric motors/switch cabinets are sufficiently protected  
against moisture.  
Use only suitable workshop equipment.  
Before starting maintenance work, appoint a supervisor.  
Inform the responsible personnel before maintenance work on the system is  
started.  
Never operate the equipment when partially dismantled.  
All maintenance and repair work not described in this chapter may only be  
carried out by Sterling service personnel or authorized personnel (appointed  
by Sterling).  
L
Disconnect the equipment from main power supply before starting  
maintenance procedures to ensure that it cannot be switched on  
unintentionally.  
Depressurize all system sections of the equipment before carrying out any  
repair work.  
Maintenance 8-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
F
Please observe the maintenance intervals.  
Before starting maintenance work, clean the equipment of oil, fuel or  
lubricants.  
Ensure that materials and incidentals required for operation as well as spare  
parts are disposed of properly and in an environmentally sound manner.  
Use only original Sterling spare parts.  
Keep record of all maintenance and repair procedures.  
8-2 Maintenance  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8.1. Maintenance intervals  
Daily:  
Check that warning labels on the equipment are clear and  
readable  
Clean the sieve or filter  
Use compressed air to blow through the sieve or filter (according  
to the accumulation of dust)  
Monthly:  
Check function of the power cord and plug  
Check all electrical and mechanical connections for tight fit  
Check setting of the level sensor (if present, optional)  
Replace the sieve or filter (according to the accumulation of dust)  
Replace outlet valve sealing.  
Every 6 months:  
Annually:  
Adjust valve switch  
After 1000  
operating hours:  
Replace carbon brushes  
F
The given maintenance intervals are average values.  
Check whether in your individual case the maintenance intervals must be  
shortened.  
Maintenance 8-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8.2. Servicing the Loader  
M
Disconnect the unit from main power supply by unplugging it.  
Depressurize all system sections of the equipment (only units with active  
cleaning).  
8.2.1. Changing the sealing ring of the outlet flap  
1. Open the toggle-type fasteners (A)  
and the flap (B) of the hopper loader.  
2. Draw the old sealing ring (C) off the  
nozzle of the material outlet.  
3. Install the new sealing ring (C).  
F
Make sure the new sealing ring (C)  
in installed properly. Do not install  
the sealing ring upside-down.  
Figure 10: Installation sealing ring  
4. Close the flap (B) and the toggle-type fasteners (A).  
&
Order number sealing ring “material outlet”:  
ID 29258  
8-4 Maintenance  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8.2.2. Adjusting the dump valve sensor  
1. Stop the conveying cycle by  
disconnecting the dump  
valve sensor from the  
controller. With the dump  
valve sensor disabled, no  
demand will be indicated,  
and conveying will stop.  
2. Connect an ohmmeter to  
PINS 2 and 3 of the dump  
valve sensor.  
3. Release the nuts (A) of the  
dump valve sensor (B) until  
the support can be  
displaced.  
Figure 11: Dump Valve  
4. Open the dump valve (C) so far that the front tip of the outlet flap is approx. 1.2” (30  
mm) away from the sealing surface.  
5. Displace the dump valve sensor (B) until the contact of the magnet switch is closed.  
6. Tighten the nuts (A) of the dump valve sensor.  
7. Check the adjustment: In case of free hanging dump valve (empty hopper loader) the  
contact of the magnet switch must be closed.  
8. If the dump valve sensor cannot be properly adjusted, replace the dump valve with  
magnet or the sensor.  
&
Order numbers  
Sensor with plug:  
Dump valve with magnet:  
ID 29570  
ID 28647  
Maintenance 8-5  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8.2.3. Cleaning the unit  
1. Open the tension ring.  
2. Tilt the turbine head upwards.  
3. Remove the filter.  
4. Clean the filter by means of compressed-air.  
5. Clean the hopper loader by means of a vacuum cleane
6. Mount the filter. Pay attention for proper fit.  
7. Mount the turbine head.  
8. Mount the tension ring.  
&
Order number  
filter with sealing:  
ID 37755  
8-6 Maintenance  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Cleaning the filter cloth:  
1. Open the toggle-type fasteners  
(A) and the flap (B) of the hopper  
loader.  
2. Check the filter cloth (C) and the  
wire cloth (D) for material  
residue. Clean the filter by means  
of compressed air.  
3. Close the flap (B) and the toggle-  
type fasteners (A) on the flap of  
the hopper loader.  
Figure 12: Filter Cloth  
&
Order numbers  
Filter cloth:  
Wire cloth:  
ID 28626  
ID 23091  
Maintenance 8-7  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
8.2.4. Replacing carbon brushes at the motor  
M
This work must be carried out by qualified personnel only.  
Disconnect the unit from main power supply before working on the controller.  
Remove compressed air and  
depressurize unit prior to  
disassembly.  
Disassemble the unit:  
1. Remove the screws (A) at the  
lid.  
2. Remove the lid (B).  
3. Remove the latch carefully  
from the brush holder (C).  
4. Remove the cover (D).  
5. Loosen the brush holder lock.  
6. Pull out the brush holder.  
Installation:  
1. Push the latch with the  
connecting line onto the new  
brush holder.  
2. Mount the brush holder.  
3. Please be careful with the  
latchet connecting line.  
4. Mount the cover.  
5. Mount the lid.  
6. Mount the screws at the lid.  
7. Install the unit.  
Figure 13: Replacing the carbon brushes  
8-8 Maintenance  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
F
Verify that no cables are pinched or cut.  
Carbon brushes can be replaced twice.  
After that the turbine has to be completely replaced.  
&
Order numbers  
Turbine (230 V, 800 W):  
ID 85629  
ID 85628  
ID 85844  
ID 84716  
Carbon brushes (switching off):  
Turbine (110 V, 800 W):  
Carbon brushes (switching off):  
Maintenance 8-9  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
9. Technical data  
M
These instructions apply to all persons within the range of action of the  
equipment.  
These operating instructions are to be used by all persons assigned activities  
connected with the equipment.  
Technical data 9-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Integrated control with:  
- LED-display  
- indication of the respective modes of operation  
- adjustable conveying time  
- adjustable line clearing time  
Integrated vacuum pump  
Integrated filter with automatic cleaning  
Parts coming in contact with material are made of stainless steel  
Simple mounting to dosing and blending units due to compact and weight saving design  
Alarm output  
Automatic shut-down with lack of material  
Display of error codes  
Optional Features  
- Material purge valve output with adjustable line purging time.  
- Two component valve output  
- Granulator level sensor input  
Performance  
Conveying capacity max. up to 440 lbs./hr (200 kg/hr) at 100 % operating time  
Hopper loader capacity: ca. 0.088 cu. ft. (2.5 l)  
Connected load: 230 V, AC, N, PE, 50/60 Hz, 0,8 kW; 110 V, AC, N, 60 Hz  
Material temperature max. 176°F (80 °C)  
Noise level max. approx. 80 db(A)  
Weight approx. 22 lbs. (10 kg)  
Air consumption: max. 0.35 cu. ft. at 87 PSI (10 l at 6 bar) per cleaning cycle  
9-2 Technical data  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
Dimension Sheet  
Technical data 9-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
10. Spare parts list  
M
This spare parts list is intended to be used only by trained personnel.  
Other persons are not permitted to modify or repair the equipment.  
&
Wear Code:  
A = Wearing part, wears quickly  
B = Wearing part  
C = Spare part, reorder every year  
D = Spare part, reorder every 2 years  
E = Spare part, rarely reordered  
Spare parts list 10-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
SSE-2, 230 V, 50 Hz / 110 V, 60 Hz  
10-2 Spare parts list  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
10.1. SSE-2, 230 V, 50 Hz  
Pos. Order no.  
1
Designation  
Wear Code  
37767 Turbine head complete, with turbine  
and controller  
37765 Covering cap  
2
3
4
5
6
18491 Sieve  
34197 Isolation  
37768 Support  
85629 Turbine (800 W)  
85628 Carbon brushes (switching off)  
24679 Isolation  
D
B
7
8
9
26384 Filter round  
37764 Turbine lower part  
98194 Cable bushing  
82277 Controller “ECO”  
83098 High comfort control  
35014 Sieve with sealing ring  
28626 Filter cloth  
10  
11  
12  
13  
14  
15  
16  
17  
A
C
C
23091 Wire cloth  
28625 SealingC  
29258 Sealing ring  
A
28647 Outlet flap with magnet  
28839 Flap switch with plug  
26462 Covering  
C
C
18  
19  
37761 Separator  
82566 Tension ring with sealing ring  
B
Spare parts list 10-3  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
10.2. SSE-2, 110 V, 60 Hz  
Pos. Order no.  
1
Designation  
Wear Code  
37777 Turbine head complete, with turbine  
and controller  
37765 Covering cap  
2
3
4
5
6
18491 Sieve  
34197 Isolation  
37768 Support  
85844 Turbine (800 W)  
84716 Carbon brushes (switching off)  
24679 Isolation  
D
B
7
8
9
26384 Filter round  
37764 Turbine lower part  
98194 Cable bushing  
83097 High comfort control  
35014 Sieve with sealing ring  
28626 Filter cloth  
10  
11  
12  
13  
14  
15  
16  
17  
A
C
C
C
A
23091 Wire cloth  
28625 Sealing  
29258 Sealing ring  
28647 Outlet flap with magnet  
28839 Flap switch with plug  
26462 Covering  
C
C
18  
19  
37761 Separator  
85481 Tension ring with sealing ring  
B
10-4 Spare parts list  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
10.3. SSE-2, 230 V, 50 Hz with active cleaning  
Pos. Order no.  
Designation  
Wear Code  
A
1
2
3
4
5
37755 Filter with sealing  
37222 Basket  
82593 Solenoid valve  
97745 Bush  
37800 Breather tube  
B
D
D
10.4. SSE-2, 110 V, 60 Hz with active cleaning  
Pos. Order no.  
Designation  
Wear Code  
A
1
2
3
4
5
37755 Filter with sealing  
37222 Basket  
82592 Solenoid valve  
97745 Bush  
37800 Breather tube  
B
D
D
Spare parts list 10-5  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
11. Accessories  
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _  
Accessories 11-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE 2  
12. Electrical manual  
This electrical manual is intended to be used only by Sterling service personnel and  
trained personnel authorized by Sterling.  
Other persons are not permitted to modify or repair the equipment.  
Electrical manual 12-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SSE-2  
Connecting the SKW-E proportioning valve:  
1. Quick Start Guide  
Turning on the loader:  
Control and power of the proportioning valve is  
supplied through a 4-wire control connection.  
Brown  
Blue  
Pos. Power  
Neg. power  
Line signal  
–Ground  
X7, L  
X7, N  
X7, ZKW  
X3  
Locate the power switch on the left side of the  
control box and move to the ‘ON’ position.  
Setting the loader convey time:  
Black  
It is only possible to set the convey time when the  
unit is not conveying material  
Green/Yellow  
1. Remove the control box face, and locate the  
removable plug in the bottom of the box.  
1. Disconnect the flapper valve switch from the  
control box, by unscrewing the plastic retainer  
ring, and pulling the plug straight down.  
2. Remove the plug and feed the wire of the  
proportioning valve through the empty hole.  
2. Adjust the conveying time by pressing the up  
arrow button (the center LED on the display lights  
up). Convey time can be adjusted from 1 to 99  
seconds, incrementally.  
3. Tighten the lock nut inside, position the wire  
length for optimum use and tighten the lock nut  
on the outside.  
4. Strip the wires so that 1/4” of wire is showing, for  
connection to terminal blocks.  
3. Make note of the conveying level and adjust time  
accordingly .  
5. Remove the loader control face.  
Please Note: The material level inside the loader  
should never exceed the material inlet.  
Upon removal of the loader control face you will see  
two printed circuit boards. One board on the reverse  
of the control face, and the other mounted inside the  
control box. The ground wire will connect to the  
terminal block X3 on the back of the control face. The  
other three wires connect to terminal block X7 inside  
the control box, in order from left to right Brown, Blue,  
then Black. Please refer to the schematic in the back  
of the manual.  
Setting the line clearing time or purge time:  
It is only possible to set the purge time when the  
unit is not conveying material  
1. Press and hold the “change-over” key, (bottom  
LED on the display lights up)  
2. While holding the change-over key, adjust the  
purge time by pressing the up arrow. Purge time  
can be adjusted from 0 to 99 seconds.  
Connecting Material Lines:  
Component 1 – connected to the intake port furthest  
from the air cylinder (regrind)  
If no line clearing valve has been installed, be sure  
to set purging time to 0.  
Component 2 – connected to the intake port closest to  
the air cylinder (virgin)  
Make note of the purge time and adjust for  
optimum efficiency  
Setting the ratio:  
When the loader motor is not running, pressing the up  
arrow key will change the percentage of component 1.  
This can be set from 0% to 99%  
Set the cycle switching:  
Press and hold the percentage key. Then by pressing  
the up arrow, you will be selecting the cycle time  
period in increments of 5 seconds.  
Therefore, if the convey time is 60 seconds and you  
select a cycle time period of 10 seconds the valve will  
switch a total of 6 times.  
Quick Start Guide 1-1  
Download from Www.Somanuals.com. All Manuals Search And Download.  

SIIG TV Mount CEMT0A12S1 User Manual
Snapper Snow Blower LE3170E User Manual
Sonance Freezer AVC100R User Manual
Sony Cell Phone D5803 D5833 User Manual
Sony Flat Panel Television 55HX929 User Manual
Sony Video Game Console SCPH 50003 SS User Manual
Soundstream Technologies Stereo Amplifier Angina A4 User Manual
Stanton MP3 Player C501 User Manual
Sunpentown Intl Air Conditioner WA 7500M User Manual
Targus Indoor Furnishings Chill Hub User Manual