Evaluation Procedure  
(DEP-001 A)  
The Delphi DNM and DNL Series of  
SIP type POL converters  
The DNM and DNL, 2.4~5.5V or 10~14V input,  
programmable output, non-isolated point of load  
DC/DC converters, are the latest offering from  
one of the world’s largest power supply  
manufacturers Delta Electronics, Inc. The  
DNM and DNL product family also has a flexible,  
programmable tracking feature, which provides a  
variety of startup voltages as well as sequencing  
and tracking between power modules. With  
creative design technology and optimization of  
component placement, these converters possess  
outstanding electrical and thermal performance,  
as well as extremely high reliability under highly  
stressful operating conditions. All models  
1.0 Purpose  
This document guides the user in performing  
electronic measurements on a DNM and DNL  
POL (point of load) DC/DC converter by using  
the Delta Evaluation Board.  
possess  
features.  
a
myriad of standard protection  
2.0 Relevant Documentation  
This document guides the user through the  
evaluation procedures to qualify a POL module.  
The data shown in this Evaluation Procedure is  
for the SIP Package Type POL evaluation board.  
Please refer to the data sheet for detailed  
performance and technical information for the  
specific POL units.  
The documentation and background information  
listed below is relevant to this evaluation  
procedure:  
2.1 Appropriate date sheet for the DNM or DNL  
Series units.  
2.2 Power Module Evaluation Board Schematic.  
2.3 Power Module Evaluation Board Layout.  
2.4 General Test and Safety Procedures.  
Evaluation Procedure  
EP_DNML_SIP_08062004  
1
Download from Www.Somanuals.com. All Manuals Search And Download.  
Delta Electronics, Inc.  
4.1 Connect one lead from the “+” lead of the DC source (See Item 3.1) to the “20A” terminal of the  
first multi-meter DVM1 (See Item 3.3). Then connect one lead from the “Common” of the DVM1  
to the “Vin” pin of the Evaluation Board. DVM1 is used to measure the input current.  
4.2 Connect one wire from the “-” lead of the DC source (See Item 3.1) to the “GND“ pin of the  
Evaluation Board. Note: Use stranded leads at least equivalent to 14 AWG for all connections  
in sections 4.1 and 4.2. The leads should be twisted to reduce noise coupling.  
4.3 Connect the plus “+” and minus “-“ connection leads from a second multi-meter (See Item 3.3)  
to the “SVin” and “SGND” pins on the Evaluation Board. This multi-meter is designated DVM2.  
DVM2 is used to measure the input voltage.  
4.4 Connect the plus “+” and minus “-“ connection leads from the third multi-meter (See Item 3.3) to  
the “SVOUT” and “SGND” Pin on the Evaluation Board. The multi-meter is designated DVM3.  
DVM3 is used to measure the output voltage.  
4.5 Connect a BNC cable (length less than 20 inches/500mm) from BNC1 of the Evaluation Board  
to Channel 1 of the oscilloscope (See Item 3.2). This cable is used to measure the input  
voltage (between SVIN and SGND).  
4.6 Connect a BNC cable (length less than 20 inches/500mm) from BNC2 of the Evaluation Board  
to Channel 2 of the oscilloscope (See Item 3.2). This cable is used to measure the output  
voltage (between SVOUT and SGND).  
4.7 Connect the positive and negative power leads of the electronic load (ensuring correct polarity),  
or an appropriate resistive load to the Evaluation Board output terminal pin (“Vout” for positive  
power lead and “SGND” for the negative power lead).  
4.8 Connect one lead from the “+” lead of the DC source (See Item 3.5) to the “12Vcc” on the  
Evaluation Board. Then connect one lead from the “-” of the DC source (See Item 3.5) to the  
“12VGND” on the Evaluation Board.  
5.0 Thermal Management of the Converter  
It is imperative that sufficient airflow needs to be provided to the converter at all times during all  
portions of testing. Please refer to the applicable data sheet for the proper cooling and derating  
necessary conditions to obtain accurate results when testing the converter.  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
6.0 Tests Performed  
The following tests are performed at room temperature (+25 ).  
6.1 Input Characteristics  
Input Voltage Range.  
Under-Voltage Lockout.  
No Load Input Current.  
6.2 Output Characteristics  
Line Regulation.  
Load Regulation.  
Output Regulation.  
Output Voltage Set-point Programming  
Output Voltage Margining  
Output Voltage Tracking  
6.3 Dynamic Characteristics  
Maximum Output Voltage Deviation (due to step change in load).  
Turn on Response time.  
6.4 Thermal Characteristic  
Efficiency  
7.0 Test Set-Up  
7.1 Initial Set-Up  
1) Examine the part number of the power module to determine that the correct module is  
being evaluated. Note: DNM04S0A0S10P A would denote the SMT package, while  
DNM04S0A0R10P A would denote the SIP package. This Evaluation Board is for SIP  
package.  
2) Set the multi-meter DVM1 to the DC current 20A range. Set multi-meters DVM2 and  
DVM3 to DC voltage, auto ranging.  
3) Electronic Load  
Turn on the Electronic Load at CR mode (or resistive load) and adjust the current level.  
The maximum rated output current is 10A for the model DNM series and 16A for the DNL  
series. Ensure the output load does not exceed the recommended maximum current.  
4) SW1 is used for on/off Transient function test. Turn SW1 to the OFF position if this function  
is not being used. Turn SW1 to the ON position if the Transient function test is required.  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
5) SW2 is used to enable or disable the converter.  
For positive logic module, When SW2 is pose for the ON position, the converter is ON,  
and SW2 is pose for the OFF position, the converter is OFF.  
For negative logic module, When SW2 is pose for the ON position, the converter is OFF,  
and SW2 is pose for the OFF position, the converter is ON.  
6) SW3 is used for the Output Voltage Set-Point Adjustment Range.  
By an external voltage source:  
If the converter requires a trim up, put the SW3_1 to ON position.  
If the converter requires a trim down, put the SW3_2 to ON position.  
By an external resistor:  
If the converter requires a trim up to Vo,set, put the SW3_8 to ON position.  
If the converter requires a margin trim down, put the SW3_3 to ON position.  
If the converter requires a margin trim up, put the SW3_4 to ON position.  
The SW3 Function table is listed as follows:  
SW3 Function table  
Subdivide switch NO.  
Obligation  
SW3_1  
Voltage trim up  
SW3_2  
Voltage trim down  
SW3_3  
SW3_4  
SW3_8  
Resistor margin trim down  
Resistor margin trim up  
Resistor trim up  
Note:  
1. The subdivide switch of SW3_1~4 must not be ON at the same time.  
2. For the SW3_5~7 use at NPA series, so must push to OFF position.  
7.2 Initial Power Up  
1) Turn the power supply ON, set the current limit on DC source (refer to specification of  
either converter) and increase the input voltage (use DVM2 to monitor the input voltage)  
until it reaches the desired value.  
2) Set the switch SW2 to power module ON.  
3) The converter is now operating, which can be verified by observing the DVM3 (appropriate  
value for the nominal output voltage) and channel 2 of the oscilloscope (appropriate value  
for the nominal output voltage).  
4) Set the switch SW2 to power module OFF.  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
8.0 Tests and Evaluation  
8.1 Input Characteristics  
8.1.1 Input Voltage Range and Under-Voltage Lockout  
The DNM04xx and DNL04xx Series of DC/DC converters will operate at full load from 2.4Vin  
to 5.5Vin for 5Vin (nominal) types. The DNM12xx and DNL12xx Series DC/DC converters will  
operate at full load from 10Vin to 14Vin for 12Vin (nominal) types. The converters feature  
input under-voltage protection, which will not allow the converter to start up unless the input  
voltage exceeds the turn-on voltage threshold.  
Test  
1) Turn on the fan.  
2) Set the input voltage to the desired operating point while monitoring DVM2.  
3) Set the switch SW2 to the “ON or OFF” position to enable the converter. (See Item  
7.1.5)  
4) Test the input under voltage function while observing DVM2, DVM3 and channel 1 of the  
oscilloscope. Increase the input voltage until the output of the converter reaches the  
appropriate value. This will occur between 2.05 and 2.25 volts for 5Vin nominal and  
between 9.0 to 10 volts for 12Vin nominal. Please refer to the appropriate converter data  
sheet for the detailed specification.  
8.1.2 No Load Input Current Test  
1) Turn on the fan.  
2) Set the input voltage to the desired operating point while monitoring DVM2.  
3) Set the switch SW2 to the converter ON.  
4) Remove/disable the output electronic load or resistive load.  
5) Note the input current from DVM1.  
6) The result is the No-Load Input current of the DC/DC converter.  
The No-Load Input Current will be around 50 to 150 mA depending on the model under  
evaluation. (Please refer to the data sheet for the detailed specification).  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
8.2 Output Characteristics  
8.2.1 Line Regulation  
Line Regulation Deviation is defined as the change in output voltage caused by varying the  
input voltage over a specified range while the output load and temperature remain constant.  
Test  
1) Turn on the fan.  
2) Set the output power to the desired operating point.  
3) Set the switch SW2 to the converter ON.  
4) Adjust the input voltage across the converter’s input range (refer to specified range) while  
monitoring DVM2.  
5) Note the maximum +/- deviation of the output voltage over the full range of the input  
operating voltage (please refer to the data sheet for the detailed specification).  
8.2.2 Load Regulation  
Load Regulation Deviation is defined as the change in output voltage caused by varying the  
output load current over the specified range (no load to full load) while the input voltage and  
temperature remain constant.  
Test  
1) Turn on the fan.  
2) Set the input voltage to the desired operating level while monitoring DVM2.  
3) Set the switch SW2 to the converter ON.  
4) Adjust the output load across the converter’s operating load range.  
5) Note the maximum +/- deviation of the output voltage over the full range of the operating  
load range (please refer to the data sheet for the detailed specification).  
8.2.3 Output Ripple  
Output Ripple is defined as the periodic AC component on the DC/DC converter’s output  
voltage. The output ripple is measured in terms of peak to peak and RMS values, both done  
with a specific bandwidth.  
Test  
1) Turn on the fan.  
2) Set the switch SW2 to the converter ON.  
3) Adjust the input voltage while monitoring DVM2 and set the output load to the full rated  
load current.  
4) Adjust channel 2 on the oscilloscope to be AC coupled at 4µS/Div and at 10mV/Div using  
the 20 MHz bandwidth-limit option on the scope.  
5) The output ripple of the DC/DC converter is measured at full load operating power.  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
8.2.4 Output Voltage Set-point Programming  
(1) Output Voltage Set-Point Adjustment by external resistor  
Output Voltage Set-point Programming can be carried out by using the external program  
resistor connect between TRIM pin to ground to set output voltage set-point from 0.75Vdc to  
5Vdc, the location can refer to the Evaluation Board Schematic (please refer to the data sheet  
for more the detailed specification). These test functions are divided into two types,  
Rset of DNM04S and DNL04S series can be calculated by using the following equation:  
21070  
Rset  
=
5110  
Vo 0.7525  
For example, to program the output voltage of the DNL04 module to 1.8Vdc, below is the  
calculation of Rtrim:  
21070  
Rset =  
5110 = 15004  
1.8 0.7525  
The table 1 provides the Rset value required for some standard output and the location on the  
Evaluation board is R33.  
Table 1.  
Vo,set  
0.7525  
1.2  
1.5  
1.8  
Recommend Value, R//R  
Open  
Rset (k) R33  
Open  
41.973  
23.077  
15.004  
6.947  
44.2k//825k  
23.7k//825k  
15.4k//590k  
7.15k//243k  
3.16k//Open  
2.5  
3.3  
3.160  
Rset of the DNM12S and DNL12S series can be calculated by using the following equation:  
10500  
Rset =  
1000  
Vo 0.7525  
For example, to program the output voltage of the DNL12 module to 3.3Vdc, below is the  
calculation of Rset:  
10500  
Rset =  
1000 = 3122  
3.30.7525  
The table 2 provides the Rset value required for some standard output. The location on the  
Evaluation board is R33.  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
Table 2.  
Vo,set  
0.7525  
1.2  
1.5  
1.8  
2.5  
3.3  
5.0  
Recommend Value, R//R  
Open  
Rset (k) R33  
Open  
22.464  
13.047  
9.024  
5.009  
3.122  
23.7k//432k  
14.0k//191k  
9.53k//169k  
5.23k//118k  
3.16k//261k  
1.5k//78.7k  
1.472  
Test  
1. Put the resistor to program the desired output voltage set point by follow Table 1 and Table  
2 for the standard output.  
2. Set the input voltage to the desired operating level while monitoring DVM2.  
3. Turn on the fan.  
4. Set the enable switch SW2 to the “ON” position to enable the converter.  
5. Adjust the output load across the converter’s operating load range.  
6. Note the output voltage over the full range of the operating load range (please refer to the  
data sheet for the detailed specification).  
(2) Output Voltage Set-Point Adjustment by external voltage source  
For DNM and DNL series, trim to Vo,set using an external voltage source, connect it  
between the TRIM pin and GND pin. Please refer to the Table 3 and Table 4 as below for  
the appropriate Vout. The value of Vtrim is specified as follows:  
For DNM04xx and DNL04xx series  
Vtrim = 0.7 0.1698×  
(
Vout 0.7525  
)
For example, to program the output voltage of a DNL04 module to 3.3 Vdc, Vtrim is  
calculated as follows:  
Vtrim = 0.7 0.1698×  
(
3.3 0.7525 = 0.267V  
)
Table 3. : Vo,set adjustment range using external voltage source.  
Normal  
Output Set  
Voltage  
(Vdc)  
Product Part  
Vrim (V)  
0.7525  
1.2  
Open  
0.6240  
0.5730  
0.5220  
0.4030  
0.2670  
DNM04S0A0R10P A/B/C  
DNM04S0A0R10N A/B/C  
DNL04S0A0R16P A/B/C  
DNL04S0A0R16N A/B/C  
1.5  
1.8  
2.5  
3.3  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
For DNM12xx and DNL12xx series  
Vtrim = 0.7 0.0667× Vout 0.7525  
(
)
V
For example, to program the output voltage of a DNL12 module to 3.3 Vdc, Vtrim is  
calculated as follows:  
Vtrim = 0.7 0.0667×  
(
3.3 0.7525 = 0.53 V  
)
Table 4. : Vo,set adjustment range using external voltage source.  
Normal  
Output Set  
Voltage  
(Vdc)  
Product Part  
Vrim (V)  
0.7525  
1.2  
Open  
0.670  
0.650  
0.630  
0.583  
0.530  
0.4167  
DNM12S0A0R10P A/B/C  
DNM12S0A0R10N A/B/C  
DNL12S0A0R16P A/B/C  
DNL12S0A0R16N A/B/C  
1.5  
1.8  
2.5  
3.3  
5.0  
8.2.5 Voltage Margining  
Output voltage margining can be carry out by connecting a resistor from the Trim pin to ground  
pin for trim up and connecting a resistor from Trim pin to Output pin for Trim down. The Rmargin-  
up is for trim up and Rmargin-down is for trim down. (Please refer to the data sheet and  
Evaluation Board Schematic for the detailed information).  
A software tool for voltage margining calculation is available to ask for. The values of Rmargin-  
up and Rmargin-down for a specific output voltage and margin percentage can then be figured  
out. Please consult your local Delta Field Application Engineer or sales persons for additional  
information.  
Test  
1) Put the resistor with desire of the voltage trim.  
2) Turn on the fan.  
3) Adjust the input voltage while monitoring DVM2 and with output load set to the desired  
operating point.  
4) Set the enable switch SW2 to the “ON” position to enable converter.  
5) Use SW3 (refer to Item 7.1_6) for Trim setup.  
6) Note the voltage by observing DVM3.  
7) Test the Load Regulation (refer to Item 8.2.2).  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
8.2.6 Voltage Tracking  
The DNM/DNL family was designed for applications that have output voltage tracking  
requirements during power-up and power-down. The devices have a TRACK pin to implement  
three types of tracking method: sequential, ratio-metric and simultaneous. TRACK simplifies  
the task of supply voltage tracking in a power system by enabling modules to track each  
other, or any external voltage, during power-up and power-down.  
By connecting multiple modules together, customers can get multiple modules to track their  
output voltages to the voltage applied on the TRACK pin.  
Detailed Description  
Sequential Implementation  
Sequential start-up is implemented by connecting the power good signal (PWRGD pin) of PS1  
to the TRACK pin of PS2 with a resistor–capacitor (RC) circuit. The power up and down that  
waveforms in Figures 4 and 5. In Figure 4, the 5V PS1 supply ramps up first. When supply  
reaches its final 5V steady state value, the open collector output of the PWRGD pin releases  
to the TRACK pin and the PS2 output voltage rises at the rate of the RC time constant. In  
Figure 5, the PWRGD pin pull low by PS1 ENABLE off or the PS1 output voltage is below 90%  
of the desired regulated voltage. The TRACK pin is pulled low and the PS2 power down.  
Figure 3 shows the circuit diagram of sequential start-up when VoPS2 tracks the PWRGD of  
PS1.  
PS1  
PS2  
Vin  
Vin  
VoPS2  
VoPS1  
PWRGD  
R
TRACK  
ENABLE  
ENABLE  
C
Figure 3. PS1 and PS2 track output voltage Sequential start-up  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PS1  
PS2  
PS1  
PS2  
Figure 4: Sequential Power up  
Figure 5: Sequential Power down  
Ratio-Metric Implementation  
Ratio–metric is implemented by the selection of the resistor values of the voltage divider on  
the TRACK pin. Resistors R1 and R2, in Figure 6 determine the tracking method that is  
implemented.  
To simplify the tracking design, R2 initial set value equal 20Kat internal circuit and only set  
one resistor R1 for different tracking method. Figure 6 shows the circuit diagram of Ratio-  
Metric start-up when VoPS2 tracks the VoPS1  
.
PS2  
PS1  
Vin  
Vin  
VoPS2  
VoPS1  
R1  
TRACK  
To Tracking  
circuit  
R2  
20K  
ENABLE  
ENABLE  
Figure 6. PS1 and PS2 track output voltage Ratio-Metric start-up  
12  
Download from Www.Somanuals.com. All Manuals Search And Download.  
For Ratio-Metric applications that need the PS1 and PS2 outputs arrive regulation set point at  
same time, use equation 1 to calculate R1, set V=Voset,PS1–Voset,PS2 and V will be  
negative. The waveforms of power up and down are showed in Figures 7 and 8.  
[(Voset,PS 2 + ∆V ) Vref ]  
R1 =  
*20K ------------------------------------------------------(1)  
Vref  
Note:  
1. Vref =0.4×Voset,PS2 , please refer to Table 5 for Vref set value.  
2. V is the maximum difference of voltage between PS1 and PS2 supply voltage.  
For example, the PS1 Voset,PS1=5V, the PS2 Voset,PS2=3.3V, R1 is calculated as follows:  
[(3.3+1.7) 1.32]  
R1 =  
*20K = 55.75K Ω  
1.32  
PS1  
PS1=5V  
PS2=3.3V  
+V=1.7V  
PS2  
Figure 7. Ratio–metric tracking Power up  
Figure 8. Ratio–metric tracking Power down  
For Ratio-Metric applications that need the PS2 supply voltage rises first at power up and falls  
second at power down, use equation 2 to calculate R1, set V0.4×Voset,PS2 and V will be  
negative. The waveforms of power up and down are showed in Figures 9 and 10.  
[(Voset, ps2 − ∆V ) Vref ]  
R1 =  
*20K -----------------------------------------------------------------(2)  
Vref  
Note:  
1. Vref =0.4×Voset,PS2 , please refer to Table 5 for Vref set value.  
2. V is defined as the voltage difference between VoPS1 and VoPS2 when VoPS2 reaches  
its rated voltage.  
13  
Download from Www.Somanuals.com. All Manuals Search And Download.  
For example, the PS1 Voset,PS1=5V, the PS2 Voset,PS2=3.3V, R1 is calculated as follows:  
[(3.3 1.3) 1.32]  
R1 =  
*20K = 10.303K Ω  
1.32  
PS1  
PS1=5V  
PS2  
PS2=3.3V  
-V=1.3V  
Figure 9. Ratio–metric tracking Power up  
Figure 10. Ratio–metric tracking Power down  
Simultaneous Implementation  
Similar to the ratio-metric implementation, simultaneous tracking is implemented using a voltage  
divider on the TRACK pin. The objective is to minimize the voltage difference between the power  
supply outputs during power up and down. The waveforms of power up and down are showed in  
Figures 13 and 14.  
For type A (DNXXX0A0XXXX A), the simultaneous tracking can be accomplished by connecting  
VoPS1 of PS1 to the TRACK pin of PS2. Figure 11 shows the circuit diagram of voltage Simultaneous  
start-up when VoPS2 tracks VoPS1 (only for type A).  
PS2  
PS1  
Vin  
Vin  
VoPS2  
VoPS1  
TRACK  
ENABLE  
ENABLE  
Figure 11. PS1 and PS2 track output voltage Simultaneous start-up for type A  
14  
Download from Www.Somanuals.com. All Manuals Search And Download.  
For type C (DNXXX0A0XXXX C), the simultaneous tracking can be accomplished by putting R1 equal  
to 30.1KΩ through VoPS1 to the TRACK pin of PS2. Figure 12 shows the circuit diagram of  
Simultaneous start-up when VoPS2 tracks the VoPS1 (only for type C).  
PS2  
PS1  
Vin  
Vin  
VoPS2  
VoPS1  
30.1K R1  
TRACK  
To Tracking  
circuit  
20K  
R2  
ENABLE  
ENABLE  
Figure 12. PS1 and PS2 track output voltage Simultaneous start-up for type C  
PS1  
PS1  
PS2  
PS2  
Figure 13. Simultaneous Power up  
Figure 14. Simultaneous Power down  
Table 5. : Vref definition  
Vref  
0.3  
Voset,ps2  
0.7525  
1.2  
0.48  
0.6  
1.5  
1.8  
0.72  
1.0  
2.5  
3.3  
1.32  
2.0  
5.0  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Notes on the use of Track function:  
1. For proper voltage tracking, first, The ENABLE On/Off pin of the PS2 module is left  
unconnected (or tied to GND for negative logic modules or tied to VIN for positive logic  
modules), so that the modules are ON by default and second applied input voltage to the  
PS1 and PS2. The TRACK pin is held at ground potential for duration of input voltage  
reaches its minimum input voltage (VIN,min) and then held for at least 10mS thereafter.  
This brief period gives the modules time to complete their internal soft-start initialization.  
2. The PS2 output will not follow the PS1 voltage until the PS2 has completed its soft-start  
time. After this time, PS2 is capable of both sinking and sourcing current when following  
the voltage at the TRACK pin.  
3. Notice that power down by removing the input voltage may not provide proper power  
tracking below under voltage lockout limit where the both integrated switches are off. So,  
using the ENABLE On/Off signal of PS1 for power down is the preferred option for power  
tracking.  
4. The TRACK pin absolute maximum voltage cannot over the Vin.  
5. For type A: When Tracking is unused, put R1 equal to 1KΩ and connect TRACK pin to  
+Vcc  
For type C: When Tracking is unused, put R1 equal to 30.1KΩ and connect TRACK pin to  
+Vcc  
Test  
1) Put R56 to take the place of R1 on the POL evaluation board by use the value from above  
equation for different tracking purpose.  
2) Use channel 1 and channel 2 measures the output voltage of PS1 and PS2.  
3) Prepare turn on, disable remote On/Off of the PS1, enable remote On/off of the PS2, and  
supply input voltage to PS1 and PS2.  
4) For the power on, enable switch on of PS1. In the meantime, to track power up by scope  
trigger function.  
5) For the power down, enable switch off of PS1 to track power down.  
6) Illustration of tacking features can be found in the section of Detailed Description.  
8.3 Dynamic Characteristics  
8.3.1 Output Voltage Deviation  
Output Voltage Deviation is defined as the response of the converter to a sudden step change  
in the output load current. The output voltage deviation is characterized by two parameters:  
Maximum Output Voltage Deviation and Response Time (please refer to the data sheet for the  
detailed specification). The value of dynamic resistance for a defined step current is defined  
as:  
Vout  
Rdynamic  
=
0.5* Imax  
16  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Test  
1) Turn on the fan.  
2) Adjust the input voltage to the desired operating point.  
3) Set the electronic or resistive load at 50% of maximum load.  
4) Change channel 1 to scope probe and measure across the Rdynamic  
.
5) Set the switch SW2 to the converter ON.  
6) Set channel 2 on the oscilloscope to be AC coupled and to 50mV/Div and for 5mS/Div. Set  
the trigger to auto and adjust the trigger point at a negative going pulse for step load  
change from 50% to 100% of Io or adjust the trigger point at positive going pulse for step  
load change from 100% to 50% (Please refer to data sheet for the detailed information.)  
7) Measure the Peak-to-Peak deviation and capture the waveform as required.  
8.3.2 Turn-On Response Time.  
Turn-On Response Time is defined as the time it takes for the output to rise to within 90% of  
its final value from the time when the converter is enabled. The rise time is deliberately made  
slower to reduce the inrush current and to eliminate any overshoot in the output voltage.  
These test functions have two categories.  
1.) Turn on the module by using the External switch to control input voltage.  
2.) Turn on module by using the Enable on/off.  
Note: There is some difference in the performance of each mode - please refer to the data  
sheet for the detailed information.  
Test (Turn on the module by using the external switch)  
1) Turn on the fan.  
2) Turn on the input power supply and set it to the desired operating point.  
3) Set channel 1 on the oscilloscope to be DC coupled and to the appropriate range for the  
input voltage.  
4) Connect a coaxial cable from channel 1 to BNC1 on the Evaluation Board.  
5) Set channel 2 on the oscilloscope to be DC coupled and to the appropriate range for the  
output voltage.  
6) Connect a coaxial cable from channel 2 to BNC2 on the Evaluation Board.  
7) Set the Time base to 2mS/Div  
8) Set the Trigger for a one-time event and set the Trigger level at approximately 2V (rising)  
or suitable trigger point (referring to data sheet) on channel 2.  
9) Enable the external on/off switch to supply power and use the cursor V Bars to measure  
the delay time and then record the waveform on the oscilloscope.  
Test (Turn on the module by using the Enable on/off)  
1. Turn on the fan.  
2. Turn on the input power supply and set it to the desired operating point.  
3. Set channel 1 on the oscilloscope to be DC coupled and to 1V/division. (Please also refer  
to data sheet for the detailed information).  
17  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. Connect a scope probe from channel 1 between the on/off control pin and reference  
ground (SGND) on the Evaluation Board.  
5. Set channel 2 on the oscilloscope to be DC coupled and within appropriate range for the  
output voltage.  
6. Connect a coaxial cable from channel 2 to BNC2 on the Evaluation Board.  
7. Set the Time base to 2mS/Div  
8. Set the Trigger for a one-time event and set the Trigger level at approximately 2V (rising)  
or suitable trigger point (refer to data sheet) on channel 2.  
9. Enable the on/off switch to turn on and use the cursor V Bars to measure the delay time  
and then record the waveform on the oscilloscope.  
8.4. Thermal Characteristic  
8.4.1 Efficiency  
Efficiency is the ratio of total output power to the input power. It is typically measured at full  
load and nominal input voltage.  
Test  
1) Turn on the fan.  
2) Set the enable switch SW2 to the converter ON.  
3) Adjust the input voltage to the desired operating point.  
4) Set the electronic or resistive Load to the desired operating point.  
5) Read and note the output voltage (DVM3) and input voltage (DVM2).  
6) Read and note the input and output currents from the DVM1 and the electronic load.  
7) Use the following formulas to calculate the efficiency:  
Efficiency= (Pout/Pin) × 100(%)  
Pin = Iin × Vin  
Pout = Iout × Vout  
The following graph shows the efficiency curves of the DNM04S0A0R10P A module when  
measuring at different operating points.  
EFFICIENCY  
100  
95  
90  
4.5V  
85  
5V  
5.5V  
80  
75  
70  
1
2
3
4
5
6
7
8
9
10  
LOAD (A)  
18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appendix A- Evaluation Board Schematic  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appendix B - Evaluation Board Layout (Top View)  
Appendix C - Evaluation Board Layout (Bottom View)  
CONTACT DATA: www.deltaww.com  
USA:  
Europe:  
Asia:  
Telephone:  
Telephone:  
Telephone: +886 3 4526107 x6220  
Fax: +886 3 4513485  
East Coast: (888) 335 8201  
West Coast: (888) 335 8208  
Fax: (978) 656 3964  
France: +33 1 6485 1212  
Germany: +49 89 370 62 897  
UK: +44 777 195 6299  
Fax: +33 1 6485 1212  
Warranty  
Delta offers a two (2) year limited warranty. Complete warranty information is listed on our web site or is available upon request  
from Delta.  
Information furnished by Delta is believed to be accurate and reliable. However, no responsibility is assumed by Delta for its use,  
nor for any infringements of patents or other rights of third parties, which may result from its use. No license is granted by  
implication or otherwise under any patent or patent rights of Delta. Delta reserves the right to revise these specifications at any  
time, without notice.  
20  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Contec Universal Remote A189C User Manual
Cornelius Beverage Dispenser ENDURO 175 User Manual
Cres Cor Convection Oven CO 151 F 1818B User Manual
Crosley Clothes Dryer 134856200 User Manual
Cub Cadet Lawn Mower Fabricated Deck InDirect Injection Diesel User Manual
Dualit Coffeemaker GB A User Manual
Edelbrock Automobile Parts 1565 User Manual
Fujitsu Automobile Accessories V5505 User Manual
FUNAI VCR SE447SG User Manual
Genesis ICE Speaker Genesis 61e User Manual