Water Boiler — Series 3 & 4
Venting Supplement
Z-Vent II
Special gas vent system vent and combustion air supplement
Z-Flex®, Inc. Z-Vent II AL29-4C® Stainless Steel Special Gas Vent System may be used in new
installations of GV-3 through GV-6 boilers.
Hazard definitions
The following defined terms are used throughout these Instructions to bring attention to the
presence of hazards of various risk levels or to important information concerning the life of
the product.
Indicates presence of hazards that will cause severe personal injury, death
or substantial property damage.
Indicates presence of hazards that can cause severe personal injury, death
or substantial property damage.
Indicates presence of hazards that will or can cause minor personal injury
or property damage.
Indicates special instructions on installation, operation or maintenance that
are important but not related to personal injury or property damage.
To the installer:
This Venting Supplement must only be used by a qualified installer/service
technician. Read these Instructions completely before beginning the
installation.Failure to follow all instructions can cause severe personal injury,
death or substantial property damage.
To install a new vent system follow instructions in:
•
•
This Venting Supplement.
GV Boilers Vent/Air Intake Termination Assembly Instructions, if
using Weil-McLain Vent/Air Intake Termination Kit. — OR —
GV Water Boiler Series 3 & 4 Direct Vent Through-Roof or Through-
Unused-Chimney Venting Supplement, if using Weil-McLain
Through-Roof or Through-Unused-Chimney Termination Kit.
Z-Vent II manufacturer’s instructions supplied with vent material.
•
•
For installations above 5,500 feet use only direct vent (ducted combustion
air) when sidewall venting. All of the vertical (through-roof or through-
unused-chimney) methods in this Venting Supplement are acceptable and
can result in severe personal injury, death or substantial property damage
if ignored.
Part number 550-110-266/0601
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Vent termination
Venting method definitions
Direct vent — Uses outside combustion air with
combustion air connector piping sealed at all joints and
seams. Also known as “sealed combustion”.
Non-Direct vent — Uses inside combustion air with no
combustion air connector piping.
terminate more than 4 feet below or to side of all doors or windows.
8. Vent must terminate more than 1 foot above grade or anticipated snow
line. In addition, vent termination must be at least 7 feet above public
walkway and 3 feet above any forced air intake within 10 feet. Stay well
away from trees, shrubs, and decorative items. Site conditions may
dictate greater clearances. See Figure 1.
9. Vent must terminate at least 4 feet horizontally, and in no case above
or below, unless a 4 foot horizontal distance is maintained,from electric
meters, gas meters, regulators, relief valves, and other equipment.
10. Locate or guard vent to prevent condensate from damaging exterior
finishes.
11. Do not extend exposed vent pipe outside of building. Condensate could
freeze and block vent pipe.
12. Vent must terminate at least 6 feet away from adjacent walls.
13. Do not terminate vent closer than 5 feet below roof overhang.
14. Do not terminate vent above any door or window. Condensate can
freeze, causing ice formations.
15. Do not use existing chimney as raceway if another appliance or fireplace
is vented into or through chimney.
Properly locate vent termination
Follow instructions on this page
when determining vent location to
avoid possibility of severe personal
injury, death or substantial property
damage.
1. When using direct vent method — Refer to separate
instructions packed with Weil-McLain direct vent
termination kit and vent pipe manufacturer's
instructions for additional locations.
2. For location of non-direct vent vertical termination,
see vent pipe manufacturer's instructions.
3. Gases will form white plume in winter. Plume could
obstruct window view.
4. Prevailing winds could cause freezing of condensate
and water/ice buildup on building, plants or roof.
5. Locate or guard vent to prevent accidental contact
by people or pets.
6. Do not terminate vent in window well, stairwell,
alcove, courtyard, or other recessed areas.
16. Do not connect:
•
•
Any other appliance to vent pipe.
Multiple boilers to a common vent pipe.
17. Do not wrap or insulate vent pipe and fittings.
18. Canadian installations — See B149.1 or B149.2 Installation Code.
19.
A gas vent extending through an exterior wall shall not
terminate adjacent to the wall or below building
extensions such as eaves, parapets, balconies or decks.
Failure to comply could result in severe personal injury,
death or substantial property damage.
7. Non-Direct vent installations only — Vent must
Figure 1
Vent termination locations
Forced
air intake
3 feet
If within 10 feet
1 foot
7 feet
1 ft
26607
Snow
26608
Part number 550-110-266/0601
3
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation
Pre-installation planning
1. Follow national, state, local or provincial codes or
regulations when venting GV boiler.
2. Choose vent method from those shown on page 5.
3. Select vent run components from Table 2. Table 3
states maximum vent run lengths and number of
elbows. Do not exceed data in Table 3. See Figure 2
for slightly reduced boiler output.
4. If installing with direct vent method, use same maximum run length
and number of elbows from step 2.Vent and combustion air connector
piping configurations must match. Use suitable 3" material for
combustion air connector piping, such as:
•
•
•
Dryer vent
Galvanized steel
PVC (3" I.D.)
5. Refer to vent termination WARNING, item 19 on page 3.
Table 2
Parts list
Z-Flex®, Inc.
Description
Part Number (Note 1)
GV starter tee
SVEVST03
SVSTPX03
SVEEWC0345
GV termination coupling
45o elbow
90o elbow
SVEEWC0390
SVEPWC03.5
SVEPWC0301
SVEPWC0302
SVEPWC0303
SVEPWC0304
SVEPWC0305
SVSLBX03
6" pipe
1' pipe
2' pipe
3' pipe
4' pipe
5' pipe
Locking band
Weil-McLain Vent/Air Intake Termination Kit
382-200-430 (Note 2)
Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit
382-200-435 (Note 2)
Notes
1. Z-Flex®, Inc. part number. Parts available through Z-Flex®, Inc.
2. Weil-McLain part number. Parts available through Weil-McLain distributor.
Table 3
Figure 2
Boiler output
Vent and combustion air connector piping
lengths and number of elbows
100
GV-3
GV-4
GV-5
99
98
97
96
95
Maximum vent
Total number of elbows
length (feet)
0
2
3
4
5
6
7
8
GV-6
GV-3 thru GV-5 100 80 70 60 50 40 30 20
GV-6 80 60 50 40 30 20 10 --
0
20
40
60
80
100
Total equivalent length (feet) of vent
(from boiler to vent termination)
Part number 550-110-266/0601
4
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation
continued
For altitudes more than 5,500 feet above sea level — Do not use non-direct vent through sidewall methods as
shown in Figures 4 and 6 below. Can cause severe personal injury, death or substantial property damage if ignored.
Select vent method
Figure 3
GV direct vent through sidewall
Figure 4
GV non-direct vent through sidewall (using Weil-
(using Weil-McLain Vent/Air Intake Termination Kit)
McLain Vent/Air Intake Termination Kit) (See WARNING above.)
Slope vent pipe downward, toward
boiler, minimum ¼” per foot.
Vent pipe
Slope
Slope
Slope vent pipe
downward, toward
boiler, minimum ¼”
per foot.
Air pipe
Z-Vent II
vent starter tee
Z-Vent II
vent starter tee
26602
26601
Figure 5
GV direct vent (using Weil-McLain
Figure 6
GV non-direct vent
Figure 7
GV non-direct vent
Through-Roof or Through-Unused Chimney
Termination Kit)
through sidewall (using termina-
tion coupling) (See WARNING
above.)
through roof (See WARNING
above.)
Slope vent pipe
downward, toward
boiler, minimum
¼” per foot.
Slope vent
pipe
downward,
toward
boiler,
minimum
¼” per foot.
Z-Vent II
vent starter tee
Z-Vent II
vent starter tee
26604
26605b
Z-Vent II
vent starter tee
26603
Part number 550-110-266/0601
5
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation — assembly
Connect vent starter tee to boiler
Follow the instructions in the GV Boiler Manual to connect the vent starter tee to the boiler.
Construct vent and optional combustion air run
Follow vent pipe manufacturer's instructions for sealing the vent. Vent and
combustion air connector piping must be sealed gas-tight to prevent
possibility of flue gas spillage and carbon monoxide emissions, resulting in
severe personal injury or death.
1. Follow Z-Vent II manufacturer's instructions to construct vent run and for methods of
supporting vent runs.
•
•
•
•
Clean joints before sealing. See vent pipe manufacturer's instructions to clean joints.
Use their specified sealant (maximum 250 °F flue temperature). Do not use screws.
Do not mix types or manufacturers of vent materials.
Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"
clearance for noncombustible materials.
•
•
Install vent pipe with seams on top of vent runs.
If needed, male end of vent pipe may be cut to provide correct length. See vent pipe
manufacturer's instructions for use.
2. If installing with direct vent through sidewall method, use instructions provided with
Weil-McLain Vent/Air Intake Termination Kit. See Figure 3 on page 5.
Connect vent run to termination
Venting through sidewall
1. If using Weil-McLain Vent/Air Intake Termination Kit, see instructions provided in that
kit. Applies to direct (Figure 3, page 5) or non-direct vent (Figure 4, page 5) method.
2. If using non-direct method with termination coupling only, see Figures 8 and 9.
•
If passing through noncombustible wall, provide hole diameter large enough to insert
the slip connector through. Sleeve and spacers are not required.
3. Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"
clearance for noncombustible materials.
4. Refer to vent termination WARNING, item 19 on page 3.
Venting through existing chimney or roof
1. Direct vent method — follow instructions supplied in Weil-McLain Through-Roof or
Through-Unused-Chimney Termination Kit to assemble termination.
2. Non-Direct vent method (only through the roof, not through chimney):
•
•
Vent pipe must extend through roof flashing, jacket or thimble. See Figure 10.
Vent may pass through floor, inside wall or concealed space when installed according
to vent pipe manufacturer's instructions.
2. Maintain minimum one-inch clearance from combustible materials to vent pipe.
Part number 550-110-266/0601
6
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation — assembly
continued
Figure 8
Sidewall termination installation (non-direct venting)
¼" to ¾" between stop
on termination and
metal plate
Spacers (2)
(to support and
center vent in
sleeve)
Pipe section
Metal plate
4" galvanized sleeve
(through 4¹⁄₈" hole for
combustible wall)
Metal plate
Spacers (2)
(to support and
center vent in
sleeve)
Pipe section
Sealant
Sealant
26609
Termination coupling
Figure 9
Non-direct vent through sidewall
Figure 10 Non-direct vent through roof
Follow Z-Vent II manufacturer’s instructions for proper
installation of vent runs, including slope and support.
(using termination coupling) Follow Z-Vent II
manufacturer’s instructions for proper installation of
vent runs, including slope and support.
Z-Vent II
Z-Vent II
vent starter tee
26605b
vent starter tee
26604b
Part number 550-110-266/0601
7
Download from Www.Somanuals.com. All Manuals Search And Download.
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation — assembly
continued
Figure 11 Installation of condensate tubing
Finish the vent installation
Installing condensate tubing
1. See Figure 11 to install condensate tubing (provided
by others). Use condensate pump if floor drain is
higher than condensate drain on boiler.
Z-Vent II
vent starter tee
If required:
•
•
use a low-profile pump — OR —
set boiler on foundation (see GV Boiler
Manual) to allow gravity flow to discharge.
2. Size pump in gal/hr (boiler model):
•
•
•
•
0.78 (GV-3)
1.17 (GV-4)
1.56 (GV-5)
1.95 (GV-6)
5/8" O.D. tubing,
provided by
others
26606
Refer to pump manufacturer's instructions. Drain
to a non-freezing area.
If vent pipe or combustion air pipe must be reassembled
When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled and resealed
according to thisVenting Supplement, the direct vent termination kit instructions and the vent pipe manufacturer's
instructions.
Sealant recommended by vent pipe manufacturer must be used as indicated in their instructions.
Vent and combustion air connector piping must be sealed gas-tight to prevent possibility of
flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death.
Part number 550-110-266/0601
8
Download from Www.Somanuals.com. All Manuals Search And Download.
|