Summit Gas Grill 42369 User Manual

®
SUMMIT  
PLATINUM D4 , D6  
BUILT-IN LP GAS GRILL INSTALLATION GUIDE  
THIS GAS APPLIANCE IS DESIGNED  
FOR OUTDOOR USE ONLY.  
42369  
LOCATING YOUR GRILL  
When determining a suitable location for your Summit® gas grill installation, give attention to concerns such as exposure to wind, proximity to traffic paths, and  
keeping any gas supply lines as short as possible. Never locate the Summit® gas grill in a garage, breezeway, shed, under an unprotected overhang, or other  
enclosed area. Locate the grill and structure so there is enough room to safely evacuate the area in case of a fire.  
CLEARANCE FROM SURFACES OR STRUCTURES  
24 inches (61 cm) Any Surface  
ƽWARNING: Clearance from any surface or structure is  
24 inches (609.6 mm) from the back and sides of the grill.  
Refer to “Typical Gas Supply Installation” before starting  
installation.  
27 inches (685.8 mm) min. for  
ƽWARNING: The structure, “island”, countertops, and  
adjacent work areas for the built-in grill installation must be  
lid clearance  
built from noncombustible materials only.  
Grill Frame  
NOTE: If you have questions on what materials are considered noncombustible,  
contact your local building materials supplier or fire department.  
Note: For a countertop treatment: Recommended 3/4 inch  
(19.1 cm) overhang. Notch front edge for frame to fully  
slide in.  
ƽ WARNING: All countertop finished surfaces must be  
constructed of a noncombustible material.  
BUILT-IN STRUCTURE CUTOUT DIMENSIONS  
ALL DIMENSIONS ARE TO FINISHED SURFACES.  
Built-In Cutout Dimensions  
3
D4  
D6  
Tolerances  
1
1
2
3
30 1  
34 1  
/
˝
˝
38 1  
34 1  
/
˝
˝
+
+
+
/
/
/
4” - 1  
4” - 1  
4” - 1  
/
/
/
˝
4
˝
4
˝
4
4
4
2
1
1
/
/
4
4
21˝  
21˝  
1
42369 US 11/22/05  
LP  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3
PARTS LIST  
D4  
Left Door - 1  
Lid - 1  
Cookbox - 1  
Right Door - 1  
Warming Rack - 1  
OR  
Warm-Up Rack - 1  
D6  
Lid - 1  
Right Enclosure Panel - 1  
Cookbox - 1  
Front Frame Rail - 1  
Rear Frame Rail - 1  
Left Enclosure Panel - 1  
Front Vent Panel - 1  
Rear Panel  
Assembly - 1  
Rear Vent - 1  
Bottom Shelf - 1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4
PARTS LIST  
®
Flavorizer Bars - 2 Sets  
Wrench - 1  
x10 Sheet Metal Screws - 3  
Stainless Steel  
Cooking Grates  
Plastic Anchors - 3  
1/2 inch Bolts  
(1/4 x 20 x 1/2 inch Bolt) - 8  
- 2  
- 3  
4B  
6B  
#10-32 x 1/4 inch Steel Screws - 5  
Nylon Washer - 8  
Bottom Tray - 1  
Catch-Pan Holder - 1  
Handle - 2  
Handle Hardware - 4  
Rotisserie - 1  
Catch-Pan - 1  
Disposable Drip Pans - 2  
Rotisserie Motor - 1  
Rotisserie Bracket - 1  
Hinge Pin- 2  
Hair Pin Cotter- 2  
Corrugated gas line - 1  
Keps Nuts (1/4 x 20 Blk Zinc) - 2  
Rotisserie Bracket Hardware- 2  
Right Front Vent Clip - 1  
Left Front Vent Clip - 1  
Smoker - 1  
7/16 inch Wrench - 1  
Download from Www.Somanuals.com. All Manuals Search And Download.  
5
EXPLODED VIEW - PLATINUM D4  
®
7740501 - Summit Platinum D4 LP Built-In 092005  
1
2
3
38  
39  
4
40  
5
6
7
41  
42  
43  
44  
45  
46  
47  
48  
49  
50  
51  
52  
53  
54  
55  
56  
8
9
10  
11  
12  
13  
14  
15  
16  
17  
18  
19  
20  
21  
22  
23  
24  
25  
57  
58  
59  
60  
26  
27  
61  
62  
63  
64  
65  
66  
67  
28  
29  
30  
68  
31  
32  
69  
70  
33  
34  
35  
71  
72  
73  
74  
36  
37  
75  
76  
Download from Www.Somanuals.com. All Manuals Search And Download.  
6
EXPLODED VIEW - PLATINUM D6  
®
7790501 - Summit Platinum D6 LP Built-In 092005  
1
2
3
42  
43  
4
5
6
7
44  
45  
46  
47  
48  
49  
50  
51  
52  
8
9
10  
11  
12  
13  
53  
54  
55  
14  
15  
16  
17  
18  
19  
20  
21  
22  
23  
24  
25  
26  
27  
28  
29  
56  
57  
58  
59  
60  
61  
62  
63  
30  
64  
65  
66  
67  
68  
31  
69  
70  
32  
33  
71  
34  
35  
36  
72  
73  
74  
37  
38  
75  
76  
39  
40  
41  
77  
78  
Download from Www.Somanuals.com. All Manuals Search And Download.  
7
EXPLODED VIEW LIST - PLATINUM D4  
1.  
2.  
3.  
4.  
5.  
6.  
7.  
8.  
Hinge Pin  
26.  
27.  
28.  
29.  
30.  
31.  
32.  
33.  
34.  
35.  
36.  
37.  
38.  
39.  
40.  
41.  
42.  
43.  
44.  
45.  
46.  
47.  
48.  
49.  
50.  
51.  
Control Panel  
Front Panel  
Vent Cover Assembly  
Front Frame Rail  
Left Rear Panel  
Left Panel  
Handle Assembly  
Bottom Shelf  
52.  
53.  
54.  
55.  
56.  
57.  
58.  
59.  
60.  
61.  
62.  
63.  
64.  
65.  
66.  
67.  
68.  
69.  
70.  
71.  
72.  
73.  
74.  
75.  
76.  
Rotisserie Fork Screw  
Rotisserie Fork  
Rotisserie Shaft  
Cookbox Assembly  
Electrode Assembly (16 1/4 inch wire)  
Right Burner Tube  
Heat Shield  
Battery Shield Assembly  
Main Gas Line  
Thermometer Hardware  
Thermometer Bezel  
Warm-Up Basket  
Smoker Assembly  
Flavorizer Bar Assembly w/ Smoker  
Smoker Box Chip Grate  
Rotisserie Motor  
Motor Bracket  
Motor Bracket Screw  
1/4 - 20 inch Keps Nut  
Smoker Electrode Assembly  
(10 1/2 inch wire)  
Electrode Assembly (8 3/4 inch wire)  
Crossover Tube  
Smoker Burner Tube  
Left Burner Tube  
10 - 24 x 1/2 inch Black Screw  
Manifold  
Negative Ignition Switch Wire  
Positive Ignition Switch Wire  
Four Output Ignition Module Assembly  
Ignition Switch Button Assembly  
10 - 24 x 1/2 inch Black Screw  
Small Control Knob  
®
9.  
Toe Kick Vent  
10.  
11.  
12.  
Left Vent Bracket  
Left Door Assembly  
Right Door Assembly  
Hair Pin Cotter  
Bottom Tray  
Summit Catch Pan Holder  
Summit Catch Pan  
Summit Drip Pan  
Rear Frame Rail  
Rear Vent Hardware  
Rear Panel Hardware  
Right Rear Panel  
Right Panel  
10 -16 x 3/4 Screw w/ Washer  
Plastic Plug  
Door Stop  
Door Bushing  
Door Plug  
13.  
14.  
15.  
16.  
17.  
18.  
19.  
20.  
21.  
22.  
23.  
24.  
25.  
Lid Assembly  
®
1/4 - 20 x 1 1/4 inch Bolt  
IR Rain Cover Hardware  
12 inch Cook Grate  
IR Rain Cover  
10 - 24 x 1/2 inch Stainless Steel Screw  
Right Flavorizer® Bar Assembly  
IR Burner  
IR Cover Box  
Warming Rack  
Thermocouple  
IR Gas Line  
1/4 - 20 x 1/2 inch Black Bolt  
Right Vent Bracket  
Control Knob  
IR Electrode Wire  
EXPLODED VIEW LIST - PLATINUM D6  
1.  
2.  
3.  
4.  
5.  
6.  
7.  
8.  
Hinge Pin  
27.  
28.  
29.  
30.  
31.  
32.  
33.  
34.  
35.  
36.  
37.  
38.  
39.  
40.  
41.  
42.  
43.  
44.  
45.  
46.  
47.  
48.  
49.  
50.  
51.  
52.  
53.  
Small Control Knob  
Control Knob  
Control Panel  
54.  
55.  
56.  
57.  
58.  
59.  
60.  
61.  
62.  
63.  
64.  
65.  
66.  
67.  
68.  
69.  
70.  
71.  
72.  
73.  
74.  
75.  
76.  
77.  
78.  
Thermocouple  
IR Gas Line  
Rotisserie Shaft  
IR Electrode Wire  
Cookbox Assembly  
Electrode Assembly (16 1/4 inch wire)  
Electrode Assembly (25 1/2 inch wire)  
Heat Shield  
Main Gas Line  
Battery Shield Assembly  
Bottom Tray  
Summit Catch Pan Holder  
Summit Catch Pan  
Summit Drip Pan  
Thermometer Hardware  
Thermometer Bezel  
Warm-Up Basket  
Front Panel  
8 inch Cooking Grate  
Smoker Assembly  
Smoker Box Chip Grate  
Flavorizer Bar Assembly w/ Smoker  
Rotisserie Fork  
Rotisserie Motor  
Motor Bracket  
Motor Bracket Screw  
1/4 - 20 inch Keps Nut  
Smoker Electrode Assembly  
(10 1/2 inch wire)  
Electrode Assembly (8 3/4 inch wire)  
Crossover Tube  
Smoker Burner Tube  
Left Burner Tube  
Right Burner Tube  
10 - 24 x 1/2 inch Black Screw  
Manifold  
Negative Ignition Switch Wire  
Positive Ignition Switch Wire  
Six Output Ignition Module Assembly  
Ignition Switch Button Assembly  
10 - 24 x 1/2 inch Black Screw  
Vent Cover Assembly  
Front Frame Rail  
Left Rear Panel  
Left Panel  
Door Stop  
Handle Assembly  
Bottom Shelf  
Left Vent Bracket  
Toe Kick Vent  
Left Door Assembly  
Right Door Assembly  
Hair Pin Cotter  
®
9.  
10.  
11.  
12.  
13.  
14.  
Rear Frame Rail  
15.  
16.  
17.  
18.  
19.  
20.  
21.  
22.  
23.  
24.  
25.  
26.  
Rear Vent Hardware  
Rear Panel Hardware  
Right Rear Panel  
Right Panel  
10 -16 x 3/4 Screw w/ Washer  
Plastic Plug  
Door Bushing  
Door Plug  
1/4 - 20 x 1/2 inch Black Bolt  
Right Vent Bracket  
®
Lid Assembly  
1/4 - 20 x 1 1/4 inch Bolt  
12 inch Cook Grate  
IR Rain Cover Hardware  
®
Right Flavorizer Bar Assembly  
IR Rain Cover  
10 - 24 x 1/2 inch Stainless Steel Screw  
Warming Rack  
Rotisserie Fork Screw  
IR Burner  
IR Cover Box  
Download from Www.Somanuals.com. All Manuals Search And Download.  
8
ASSEMBLY  
2
1
1
2
1
Arrow stickers on  
Frame Rail (1) and  
Left Side Panel (2)  
should point toward  
each other (shown  
above). Door Stop  
Bracket (3) should  
be positioned as  
shown (left).  
3
2
ƽ ATTENTION!  
Do not fully tighten screws.  
Clips should slide freely when  
installed.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
9
ASSEMBLY  
3
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
10  
ASSEMBLY  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
11  
ASSEMBLY  
®
ƽ CAUTION: Use two people to lift and install the Summit Built-In frame assembly.  
a.) Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the finished surface of the  
structure.  
b.) Adjust the Front Vent to rest squarely on ground.  
c.) Apply a bead of silicone sealant (1) around the perimeter and front edges of the grill that are in contact with the “island”  
structure. This will prevent moisture seepage. The sealant you use must have a temperature rating above 120°F (48.8° C).  
6
Any Surface  
24 inches (610mm)  
Note: For a countertop treatment  
Recommended 3/4 inch (19.1 mm)  
overhang. Notch front edge for  
frame to fully slide in.  
a.  
Frame  
c.  
Any Surface  
(1)  
24 inches (610mm)  
Frame  
b.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
12  
ASSEMBLY  
7
D4  
D6  
(3)  
(1)  
(2)  
Download from Www.Somanuals.com. All Manuals Search And Download.  
13  
ASSEMBLY  
8
D6  
D4  
(1)  
(2)  
Download from Www.Somanuals.com. All Manuals Search And Download.  
14  
ASSEMBLY  
D6  
D4  
9
a
b
c
Match Holder  
Download from Www.Somanuals.com. All Manuals Search And Download.  
15  
ASSEMBLY  
10  
1/4" Drill Bit  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
16  
ASSEMBLY  
12  
13  
14  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
17  
GAS SUPPLY  
BUILT-IN GAS LINE LOCATIONS  
TYPICAL BULK PROPANE GAS SUPPLY INSTALLATION  
Note: Leave an access in the “island” structure for gas supply and regulator  
We recommend that this installation be done by a LICENSED professional.  
General Specifications for Piping  
®
service that is not inside the grill structure. Weber has a gas line and  
regulator access door (part # 36311) available from your dealer or call  
Customer Service at 1-800-446-1071.  
Note - Contact your local municipality for building codes regulating outdoor  
gas grill installations. In absence of Local Codes, you must conform to the  
Note: Area should be kept clear of sharp, jagged, or extremely abrasive  
surfaces to avoid possible damage to gas supply lines. Exercise caution when  
pulling gas lines through built-in structure.  
latest edition of the National Fuel Gas Code ANSI Z223.1/NFPA 54.  
This grill is designed to operate at 10.5 inches of water column pressure.  
An LP in line regulator may be necessary for this pressure.  
ƽ Caution: If young children are in the area, a  
locking valve should be considered.  
Pipe compound should be used which is resistant to the action of liquid  
propane gas when gas connections are made.  
The gas connections must be firmly attached to rigid, permanent  
construction.  
Plan View Left Side  
Note: The information provided in this manual is general for typical  
installations. We cannot cover all possible installation ideas. We recommend,  
prior to installation, that you contact your municipality for local building codes  
and your local fire department for installation verification.  
3
3
/ "  
3
4
A (3 / ")  
4
Gas Inlet  
1
6
/ "  
4
1
B (6 / ")  
4
C
Gas Inlet  
If you have any questions, contact Customer Service at 1-800-446-1071.  
Side view  
Built-In Gas Line Dimensions  
D4  
D6  
Tolerances  
1
A
B
C
3 3  
6 1  
2 1  
/
/
/
"
"
"
3 3/4""  
+
+
+
/
/
/
8" - 1  
8" - 1  
8" - 1  
/
/
/
"
8
"
8
"
8
4
4
2
1
1
6 1  
2 1  
/
"
"
4
2
/
Table  
10-1  
Maximum Capacity of Pipe in Cubic Feet of Gas per Hour for Gas Pressures of 0.5 psi or Less and a Pressure Drop of 0.3 Inch  
Water Column. (Based on a 0.60 Specific Gravity Gas)  
Nominal  
Iron Pipe  
Size  
Internal  
Diameter  
(Inches)  
Length of Pipe (Feet)  
10  
20  
30  
40  
50  
60  
70  
80  
90  
100  
125  
150  
175  
200  
(Inches)  
1/4  
3/8  
1/2  
3/4  
1
.364  
.493  
32  
22  
49  
18  
40  
15  
34  
14  
30  
12  
27  
11  
25  
11  
23  
10  
22  
9
8
8
7
6
72  
21  
18  
17  
15  
14  
.622  
132  
92  
73  
63  
56  
50  
46  
43  
40  
38  
34  
31  
28  
26  
.824  
278  
190  
350  
730  
1100  
2100  
3300  
5900  
152  
285  
590  
890  
1650  
2700  
4700  
9700  
130  
245  
500  
760  
1450  
2300  
4100  
8300  
115  
215  
440  
670  
1270  
2000  
3600  
7400  
105  
195  
400  
610  
1150  
1850  
3250  
6800  
96  
90  
84  
79  
72  
64  
59  
55  
1.049  
1.380  
1.160  
2.067  
2.469  
3.068  
4.026  
520  
180  
370  
560  
1050  
1700  
3000  
6200  
170  
350  
530  
990  
1600  
2800  
5800  
160  
320  
490  
930  
1500  
2600  
5400  
150  
305  
460  
870  
1400  
2500  
5100  
130  
275  
410  
780  
1250  
2200  
4500  
120  
250  
380  
710  
1130  
2000  
4100  
110  
225  
350  
650  
1050  
1850  
3800  
100  
210  
320  
610  
980  
1700  
3500  
1 1/4  
1/12  
2
1050  
1600  
3050  
4800  
8500  
2 1/2  
3
4
17500 12000  
© 1997 National Fire Protection Association, Inc,. and International Approval Services - U.S., Inc. All Rights Reserved.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
18  
GAS SUPPLY  
GAS LINE PIPING  
TYPICAL 20 LP PROPANE GAS SUPPLY INSTALLATION  
Refer to the piping chart at the bottom of previous page.  
The corrugated gas line from the manifold is 58 inches long. Do not  
extend the gas line.  
We have provided the means to make an SAE 45° flare connection. Do  
not use pipe sealant on this connection.  
If the length of line required does not exceed 50 feet, use a 5/8” O.D.  
tube. One size larger should be used for lengths greater than 50 feet.  
Refer to piping chart.  
®
We strongly recommend that you use the Summit Built-In  
Tank Cabinet (#21280) for installations using a 20 lb LP cylinder, mounted  
remotely in an “island” structure.  
The Summit Built-In Tank Cabinet is a CSA listed accessory for installing a  
remote mounted 20 lb LP cylinder, in an “island” structure. Summit Built-In  
Tank Cabinet has a hose and regulator assembly and gas connections, for  
®
®
®
connecting a remote mounted LP cylinder to the Summit Built-In gas grill. The  
hose and regulator is listed as a required part of the CSA listed Summit Built-  
®
Gas piping may be copper tubing, type K or L; polyethylene plastic tube,  
with a minimum wall thickness of .062 inch; or standard weight (schedule  
40) steel or wrought iron pipe.  
Copper tubing must be tin-lined if the gas contains more than 0.3 grams  
of hydrogen sulfide per 100 cubic feet of gas.  
Plastic tubing is suitable only for outdoor, underground use.  
Gas piping in contact with earth, or any other material which may corrode  
the piping, must be protected against corrosion in an approved manner.  
Underground piping must have a minimum of 18” cover.  
In gas grill.  
®
The Summit Built-In Tank Cabinet also meets the requirements for venting,  
tank retention and separation of the LP cylinder from a heat source as outlined  
in the ANSI Standard for Outdoor Cooking Gas Appliances, Z21.58/CSA 1.6  
for LP enclosures.  
The Summit Built-In Tank Cabinet has its own installation guide.  
If you do not use the Summit Built-In Tank Cabinet, you need to hire  
a licensed contractor or licensed plumber and they need to follow the  
requirements described in the ANSI Standard for Outdoor Cooking Gas  
Appliances, Z21.58/CSA 1.6 for LP enclosures.  
®
®
The requirements described in the Standard for Outdoor Cooking Gas  
Appliances, Z21.58/CSA 1.6. are as follows;  
A remote enclosure for an LP gas cylinder shall be ventilated by openings at  
both the upper and lower levels of the cylinder. This shall be accomplished by  
one of the following:  
TEST CONNECTIONS  
All connections and joints must be thoroughly tested for leaks in accordance  
with local codes and all listed procedures in the latest edition of the National  
Fuel Gas Code ANSI Z223.1/NFPA 54.  
a). One side of the remote LP cylinder enclosure shall be completely open;  
or  
ƽ DANGER  
b). If the remote LP cylinder enclosure is designed to have four sides, a top  
and a bottom, ventilation is required for the remote LP cylinder enclosure;  
Do not use an open flame to check for gas leaks. Be  
sure there are no sparks or open flames in the area  
while you check for gas leaks. This will result in a fire  
or explosion which can cause serious bodily injury or  
death, and damage to property.  
1). There should be at least two ventilation openings, (a hole or group  
of holes, for the purpose of ventilation) in the sidewalls of the island  
structure. The openings should be located within 5 inches (127mm) of  
the top of the enclosure. The ventilation openings should be equally  
sized and spaced at a minimum of 90 degrees, and be unobstructed.  
The openings shall have a total free open area of not less than 20  
square inches. (This relates to 1 square inch of ventilation area, per  
pound of stored fuel capacity).  
2). Ventilation openings (a hole or group of holes, for the purpose of  
ventilation) should be provided at floor level. The ventilation openings  
should have a total free area of not less than 10 square inches. (This  
relates to 1/2 square inch of ventilation area, per pound of stored  
fuel capacity). There should be at least two ventilation openings  
if the ventilation openings at floor level are in the sidewall. The  
ventilation openings should be within 5 inches (127mm) of the floor.  
The ventilation openings should be of equal size and be spaced at a  
minimum of 90 degrees, and should be unobstructed.  
3). The minimum size of the ventilation hole (s) should not be less than  
1/4 inch.  
4). The ventilation openings in the sidewalls should not allow venting into  
the empty or “hollow” area of the “island”. If a gas leak should occur  
or the LP cylinder should vent in the LP cylinder enclosure, the gas  
should not be allowed to vent or migrate into the empty or “hollow”  
area of the “island”. Ventilation openings in the sidewalls of the  
enclosure should only communicate with the outside of the “island”  
structure, so that the gas can dissipate outside of the “island” structure.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
19  
GAS SUPPLY  
c). If the remote LP cylinder enclosure has four sides, a top and a bottom,  
ƽDANGER  
and is intended for installation in a built-in “island” enclosure;  
1). At least one ventilation opening (a hole or group of holes, for the  
purpose of ventilation) needs to be on one side of the enclosure  
that communicates with the outside of the “island” structure. If a gas  
leak should occur or the LP cylinder should vent in the LP cylinder  
enclosure, the gas should not be allowed to vent or migrate into the  
empty or “hollow” area of the “island”. Ventilation openings should  
only communicate with the outside of the “island” structure, so that  
the gas can dissipate outside of the “island” structure. The ventilation  
opening should be located within 5 inches (127mm) of the top of the  
enclosure, and should have a total free area of 20 square inches. (This  
relates to 1 square inch of ventilation area, per pound of stored fuel).  
2). At least one ventilation opening (a hole or group of holes, for the  
purpose of ventilation) needs to be on one side of the enclosure that  
communicates with the outside of the “island” structure, at the bottom.  
If a gas leak should occur or the LP cylinder should vent in the LP  
cylinder enclosure, the gas should not be allowed to vent or migrate  
into the empty or “hollow” area of the “island”. Ventilation openings  
should only communicate with the outside of the “island” structure,  
so that the gas can dissipate outside of the “island” structure. The  
ventilation opening should be located within 5 inches (127mm) of  
the bottom of the enclosure, and should have a total free area of 10  
square inches. (This relates to 1/4 square inch of ventilation area, per  
pound of stored fuel).  
Use of any other hose and regulator assembly could be  
dangerous, and may not provide adequate gas supply  
®
to the Summit Built-In gas grill, and could result in a  
fire or an explosion causing serious bodily injury or  
death, and damage to property.  
ƽDANGER  
®
Failure to use the Summit Built-In Tank Cabinet for a  
20 lb cylinder or failure to build a LP cylinder enclosure  
for a 20 lb cylinder following the requirements for  
ventilation, cylinder retention and separation of the LP  
cylinder from a heat source, listed in the ANSI Standard  
for Outdoor Cooking Gas Appliances, ANSI Z21.58 CSA  
1.6, could be dangerous, and could result in a fire or an  
explosion causing serious bodily injury or death and  
damage to property.  
If you do not follow the DANGER statements exactly, the Warranty on the  
Summit Built-In gas grill will be voided.  
3). The minimum size of the ventilation hole (s) should not be less than  
1/4 inch.  
®
d). The remote LP cylinder enclosure should be constructed with non-  
combustible materials. The remote LP cylinder enclosure should isolate  
the LP cylinder from the burner compartment, so that it provides shielding  
from radiation, be a flame barrier and provide protection from foreign  
material such as hot drippings.  
e). There should be a minimum of 2 inches (50.8mm) between the ground  
and the floor of the remote LP cylinder enclosure.  
f). The LP cylinder valve should be readily accessible for hand operation.  
A door on the remote LP cylinder enclosure to gain access to the LP  
cylinder valve is acceptable, provided it is non-locking and can be  
opened without the use of tools.  
If your licensed contractor or licensed plumber builds an LP cylinder enclosure  
following the guidelines in the ANSI Standard for Outdoor Cooking Gas  
Appliances,  
Z21.58 CSA 1.6, you need to order kit number (#21287), which will contain the  
hose and regulator assembly, mounting bracket for the regulator, connection  
fittings and LP tank bracket for retaining the LP cylinder that must be used  
®
with the Summit Built-In gas grill. The hose and regulator in the kit (#21287) is  
®
listed as part of the CSA listed Summit Built-In gas grill.  
ƽ ATTENTION: This product has been safety tested and  
is only certified for use in a specific country. Refer to  
country designation located on outer carton.  
These parts may be gas carrying or gas burning components. Please  
contact Weber-Stephen Products Co., Customer Service Department for  
genuine Weber-Stephen Products Co. replacement part(s) information.  
ƽ WARNING: Do not attempt to make any repair to  
gas carrying or gas burning components without  
contacting Weber-Stephen Products Co., Customer  
Service Department. Your actions, if you fail to follow  
this product Warning, may cause a fire or an explosion  
resulting in serious personal injury or death and  
damage to property.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
20  
GAS SUPPLY  
VENTILATION  
CONNECT GAS SUPPLY  
A 58 inch corrugated gas line is supplied with the grill. This line needs to  
pass through the gas inlet opening to the main gas supply.  
ƽWARNING: Air holes must be provided in the structure  
at the top and bottom to provide ventilation in the event of  
a gas leak.  
1) Connect the corrugated gas line to the manifold located on the right  
hand side of grill under the control panel. Use the 1/2” flared gasket (1)  
to ensure proper seal.  
Air holes can be located in a low visibility area and should be protected by  
screening material to prevent rodents and insects from entering the structure.  
Air holes will also help dry moisture.  
®
Note: 1/2” flared gaskets are included in the Summit Built-In tank  
cabinet (#21280) or the hose and regulator connection from kit # 21287.  
®
Summit Built-In cabinet vents are available from your dealer or call Customer  
Service at 1-800-446-1071.  
Note: Leave an access in the “island” structure for gas supply and regulator  
service not inside the grill structure. Weber has a gas line and regulator  
access door (part # 36311) available from your dealer or call Customer  
Service at 1-800-446-1071.  
®
Note: These drawings are only a reference.  
Cross ventilation must be incorporated in the supporting structure. We  
recommend a minimum of 100 square inches of venting per side.  
Vents should be on two sides of the structure.  
OR  
Right Side  
Left Side  
(1)  
top view  
The corrugated line passes through the “Island Structure” cavity to the  
®
regulator connection inside the Summit Built-In tank cabinet (#21280) or the  
Front View  
hose and regulator connection from kit # 21287. (Shown below)  
The above drawings are for reference only.  
Location of the vents should be from the center, outward.  
Locate the vents at both the bottom of the structure and at the top of the  
structure.  
The bottom vents should be as close to ground level as possible. Make  
sure the vent area is not blocked by interior supports of the structure.  
We recommend vents with screens.  
Access doors to the structure are not considered vents.  
Clean the vents periodically.  
ƽ DANGER: Failure to follow recommended minimum  
venting instructions can cause gas to collect in the  
structure in the event of a gas leak. This may result in a  
fire or an explosion which can cause serious bodily injury  
or death, and damage to property.  
Typical tank cabinet  
or tank enclosure location  
WEBER-STEPHEN PRODUCTS CO.  
®
©2006 The following trademarks are registered in the name of Weber-Stephen Products Co., an Illinois corporation, located at 200 East Daniels Road, Palatine, Illinois 60067 U.S.A.  
®
®
®
Australia; Smokey Joe, Weber, Kettle Silhouette , Genesis, Austria; Kettle Silhouette , Smokey Joe, Weber, Benelux; Kettle Silhouette , Smokey Joe, Weber, Compact Grill Configura-  
®
®
®
tion, Botswana; Weber, Canada; Smokey Joe, Genesis, China; Kettle Silhouette , Denmark; Kettle Silhouette , Smokey Joe, Weber, Finland; Smokey Joe, France; Kettle Silhouette ,  
®
Smokey Joe, Weber, One-Touch, Germany; Smokey Joe, Weber, One-Touch, Greece; Smokey Joe, Ireland; Kettle Silhouette , Smokey Joe, Italy; Smokey Joe, Weber, Japan; Smokey  
Joe, Weber, Korea; Smokey Joe, Weber, New Zealand; Weber, Smokey Joe, Nigeria; Weber, Norway; Smokey Joe, Weber, Portugal; Weber, South Africa: Smokey Joe, Weber, Kettle  
®
®
Configuration, Spain; Smokey Joe, Weber, Sweden; Kettle Silhouette , Smokey Joe, Switzerland; Kettle Silhouette , Smokey Joe, Weber, United Kingdom; Smokey Joe, Weber, Weber  
®
One-Touch, U.S.A..; Kettle Configuration, Kettle Silhouette , Smokey Joe, Weber, One-Touch, Firespice, Go-Anywhere, U.S.A.;Kettle Configuration, Kettle Silhouette, Genesis, Fla-  
vorizer, Crossover, Flamgo, Performer, Rapidfire, Tuck ‘N Carry, Jumbo Joe, Bar-B-Kettle, Master-Touch, Spirit, Grill Out, Summit, Platinum, 1-800-Grill-Out, Ranch, Matchless Flame,  
®
Zimbabwe; Weber, Kettle Configuration, Kettle Silhouette .  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Sharp Stereo System CD BA2100 User Manual
Sonance Speaker 33 2931 User Manual
Sony Computer Drive MSAC US5 User Manual
Sony Speaker XSL101P5W User Manual
Sony VCR KV 13VM42 User Manual
Sprint Nextel Cell Phone EPL 7500 User Manual
StarTechcom Computer Accessories PEXSAT34RH User Manual
Sunrise Medical Wheelchair V 521 User Manual
SUPER MICRO Computer Computer Hardware X7DVL 3 User Manual
Swann Security Camera SW244 SK4 User Manual