Patton electronic Network Router 07MOS10xx GS User Manual

OnSite 1052 &1063 Series  
Metro-Optical Transport  
Access Nodes  
Getting Started Guide  
The compliance information in this document is incomplete and subject to change.  
IMPORTANT  
Sales Office: +1 (301) 975-1000  
Technical Support: +1 (301) 975-1007  
WWW: www.patton.com  
Part Number: 07MOS10xx-GS, Rev. A  
Revised: November 20, 2009  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Summary Table of Contents  
1
2
3
4
5
Product Overview.......................................................................................................................................... 14  
Application Overview.................................................................................................................................... 18  
Installation Overview .................................................................................................................................... 23  
System Management Access........................................................................................................................... 39  
Contacting Patton for assistance ................................................................................................................... 53  
A Compliance information .............................................................................................................................. 56  
B Specifications ................................................................................................................................................ 59  
C Terms and Acronyms .................................................................................................................................... 64  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Table of Contents  
Summary Table of Contents ........................................................................................................................... 3  
Table of Contents ........................................................................................................................................... 4  
List of Figures ................................................................................................................................................. 7  
List of Tables .................................................................................................................................................. 8  
About this guide ............................................................................................................................................. 9  
Audience................................................................................................................................................................. 9  
Structure............................................................................................................................................................... 10  
Precautions ........................................................................................................................................................... 10  
Typographical conventions used in this document................................................................................................ 11  
General conventions .......................................................................................................................................11  
Mouse conventions .........................................................................................................................................11  
Safety when using electricity ................................................................................................................................. 12  
Power Cable ....................................................................................................................................................12  
Electrostatic Discharge Damage............................................................................................................................ 13  
Optical Safety ....................................................................................................................................................... 13  
Fiber-Optic Ports ............................................................................................................................................13  
Fiber-Optic Safety Precautions ........................................................................................................................13  
1
2
3
Product Overview.......................................................................................................................................... 14  
Introduction..........................................................................................................................................................15  
OnSite Platforms ............................................................................................................................................15  
Application Overview.................................................................................................................................... 18  
OS1052 Application..............................................................................................................................................19  
OS1063 Application..............................................................................................................................................21  
Installation Overview .................................................................................................................................... 23  
Introduction..........................................................................................................................................................24  
Unpacking and Inspection.....................................................................................................................................24  
Site Preparation .....................................................................................................................................................24  
Site Environment ..................................................................................................................................................25  
Planning Your Site.................................................................................................................................................25  
Site Requirements ...........................................................................................................................................25  
Operating Environment Requirements ......................................................................................................26  
Power Supply Requirements ......................................................................................................................27  
Distribution Rack Requirements ...............................................................................................................27  
Mechanical Recommendations for the Rack ....................................................................................................28  
Protective Grounding for the Rack and Chassis ..............................................................................................28  
Space Requirements for the Rack ....................................................................................................................28  
Securing the Rack ...........................................................................................................................................28  
Tools and Equipment for Installation and Maintenance........................................................................................29  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
OnSite System Installation ....................................................................................................................................29  
Mounting the Chassis to an EIA/TIA 19-Inch Rack .......................................................................................29  
Mounting the Chassis to an ETSI Rack ..........................................................................................................30  
Mounting the Chassis on the Wall ..................................................................................................................32  
Installing the Chassis Ground Connection ......................................................................................................33  
Connecting Power to the OS-10 System .........................................................................................................33  
Connecting AC Power to the OS-10 System .............................................................................................34  
Powering On the OS-10 System with AC Power ......................................................................................35  
Connecting DC Power to the OS-10 System ............................................................................................35  
Wiring Procedure for DC Input Power .....................................................................................................35  
Checking the OS-10 System Installation .........................................................................................................38  
4
System Management Access........................................................................................................................... 39  
Introduction..........................................................................................................................................................40  
General Overview..................................................................................................................................................40  
Ethernet LAN Management Port...........................................................................................................................41  
Serial Management Port ........................................................................................................................................42  
Gaining Access to the System ................................................................................................................................43  
Access through the Serial Port .........................................................................................................................43  
Access through the Ethernet LAN Management Port ......................................................................................44  
Web-Based Management Interface ........................................................................................................................45  
Launching the GUI Application .....................................................................................................................45  
Autonomous Alarm Messages................................................................................................................................47  
Engineering Orderwire (EOW) .............................................................................................................................49  
5
Contacting Patton for assistance ................................................................................................................... 53  
Introduction..........................................................................................................................................................54  
Contact information..............................................................................................................................................54  
Warranty Service and Returned Merchandise Authorizations (RMAs)...................................................................54  
Warranty coverage ..........................................................................................................................................54  
Out-of-warranty service .............................................................................................................................54  
Returns for credit ......................................................................................................................................54  
Return for credit policy .............................................................................................................................55  
RMA numbers ................................................................................................................................................55  
Shipping instructions ................................................................................................................................55  
A Compliance information .............................................................................................................................. 56  
Compliance...........................................................................................................................................................57  
EMC ...............................................................................................................................................................57  
Safety ..............................................................................................................................................................57  
Radio and TV Interference....................................................................................................................................57  
FCC Part 68 (ACTA) Statement ...........................................................................................................................57  
Declaration of Conformity ....................................................................................................................................58  
Authorized European Representative .....................................................................................................................58  
B Specifications ................................................................................................................................................ 59  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
OnSite Series Getting Started Guide  
Model OS1052......................................................................................................................................................60  
Trunk Interfaces .............................................................................................................................................60  
Client Interfaces ..............................................................................................................................................60  
Expansion Modules .........................................................................................................................................60  
Configuration & Port Capacity for 2 Expansion Slots .....................................................................................60  
Protection .......................................................................................................................................................60  
Bandwidth Connectivity and Provisioning ......................................................................................................60  
Timing & Synchronization .............................................................................................................................60  
System Access .................................................................................................................................................60  
Operations ......................................................................................................................................................61  
Management ...................................................................................................................................................61  
Packet Intelligence ..........................................................................................................................................61  
Dimensions .....................................................................................................................................................61  
Weight ............................................................................................................................................................61  
Cooling ...........................................................................................................................................................61  
Mounting .......................................................................................................................................................61  
Power ..............................................................................................................................................................61  
Environment ...................................................................................................................................................61  
Model OS1063......................................................................................................................................................62  
Trunk Interfaces .............................................................................................................................................62  
Client Interfaces ..............................................................................................................................................62  
Expansion Modules .........................................................................................................................................62  
Configuration & Port Capacity for 2 Expansion Slots .....................................................................................62  
Protection .......................................................................................................................................................62  
Bandwidth Connectivity and Provisioning ......................................................................................................62  
Timing & Synchronization .............................................................................................................................62  
System Access .................................................................................................................................................62  
Operations ......................................................................................................................................................63  
Management ...................................................................................................................................................63  
Packet Intelligence ..........................................................................................................................................63  
Dimensions .....................................................................................................................................................63  
Weight ............................................................................................................................................................63  
Cooling ...........................................................................................................................................................63  
Mounting .......................................................................................................................................................63  
Power ..............................................................................................................................................................63  
Environment ...................................................................................................................................................63  
C Terms and Acronyms .................................................................................................................................... 64  
Abbreviations.........................................................................................................................................................65  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
List of Tables  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
About this guide  
This guide describes how to install a Patton OnSite Series Model 1052 and1063 Metro-Optical Transport  
Access Node. For detailed configuration and management instructions, refer to the OnSite 1052 & 1063 Series  
ton.com.  
Installation, maintenance, and removal of a chassis or its components must be done by qualified service per-  
sonnel only. Qualified service personnel have had appropriate technical training and experience that is neces-  
sary to be aware of the hazards to which they are exposed when performing a task and of measures to minimize  
the danger to themselves and other people.  
You should consider the following before unpacking your equipment:  
Install the equipment in a secured, enclosed, and restricted access area, ensuring that only qualified service  
personnel have access to the equipment.  
Install the equipment only in a temperature and humidity-controlled indoor area that is free of airborne  
materials that can conduct electricity.  
When you handle equipment that has expansion modules, put on the electrostatic discharge (ESD) wrist  
strap to reduce the risk of electronic damage to the equipment.  
Note Leave the ESD strap permanently attached to the chassis or rack so  
that it is always available when you need to handle ESD-sensitive  
components.  
Read the following safety information thoroughly before installing your OS-  
10 system. Failure to follow this safety information can lead to personal  
injury or damage to the equipment.  
WARNING  
Audience  
This guide is intended for the following users:  
Operators  
Installers  
Maintenance technicians  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
Structure  
This guide contains the following chapters and appendices:  
Chapter 1 describes the OnSite Series Metro-Optical Transport Access Nodes  
Chapter 2 describes typical applications for the OS-10 series  
Chapter 3 describes instructions for installing the OS-10  
Chapter 4 describes how to access the OS-10 for configuration and management  
Chapter 5 contains information on contacting Patton technical support for assistance  
Appendix A lists compliance information  
Appendix B contains specifications for the OS-10 series  
Appendix C contains a reference for terms and acronyms found in this guide  
For best results, read the contents of this guide before you install the OS-10 platforms.  
Precautions  
Notes and cautions, which have the following meanings, are used throughout this guide to help you become  
aware of potential problems. Warnings relate to personal injury issues, and Cautions refer to potential property  
damage.  
Note Calls attention to important information.  
The shock hazard symbol and WARNING heading indicate a potential electric  
shock hazard. Strictly follow the warning instructions to avoid injury caused  
by electric shock.  
WARNING  
The alert symbol and WARNING heading indicate a potential safety hazard.  
Strictly follow the warning instructions to avoid personal injury.  
WARNING  
The shock hazard symbol and CAUTION heading indicate a  
potential electric shock hazard. Strictly follow the instructions to  
avoid property damage caused by electric shock.  
CAUTION  
The alert symbol and CAUTION heading indicate a potential haz-  
ard. Strictly follow the instructions to avoid property damage.  
CAUTION  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
Typographical conventions used in this document  
This section describes the typographical conventions and terms used in this guide.  
General conventions  
The procedures described in this manual use the following text conventions:  
Table 1. General conventions  
Convention  
Meaning  
Indicates a cross-reference hyperlink that points to a figure, graphic,  
table, or section heading. Clicking on the hyperlink jumps you to the ref-  
erence. When you have finished reviewing the reference, click on the  
Go to Previous View button in the Adobe® Acrobat® Reader tool-  
bar to return to your starting point.  
Garamond blue type  
Futura bold type  
Italicized Futura type  
Futura type  
Indicates the names of menu bar options.  
Indicates the names of options on pull-down menus.  
Indicates the names of fields or windows.  
Garamond bold type  
Indicates the names of command buttons that execute an action.  
Angle brackets indicate function and keyboard keys, such as <Shift>,  
<Ctrl>, <C>, and so on.  
< >  
Are you ready?  
% dir *.*  
All system messages and prompts appear in the Courierfont as the  
system would display them.  
Bold Courier font indicates where the operator must type a response or  
command  
Mouse conventions  
The following conventions are used when describing mouse actions:  
Table 2. Mouse conventions  
Convention  
Meaning  
Left mouse button  
This button refers to the primary or leftmost mouse button (unless you have  
changed the default configuration).  
Right mouse button This button refers the secondary or rightmost mouse button (unless you have  
changed the default configuration).  
Point  
This word means to move the mouse in such a way that the tip of the pointing  
arrow on the screen ends up resting at the desired location.  
Click  
Means to quickly press and release the left or right mouse button (as instructed in  
the procedure). Make sure you do not move the mouse pointer while clicking a  
mouse button.  
Double-click  
Drag  
Means to press and release the same mouse button two times quickly  
This word means to point the arrow and then hold down the left or right mouse but-  
ton (as instructed in the procedure) as you move the mouse to a new location.  
When you have moved the mouse pointer to the desired location, you can release  
the mouse button.  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
OnSite Series Getting Started Guide  
Safety when using electricity  
Read the installation instructions before connecting your OS-10 system to the  
power source.  
WARNING  
Follow these guidelines when working on equipment powered by electricity:  
Locate the emergency power-off switch in the room in which you are working. Then, if an electrical acci-  
dent occurs, you can quickly turn off the power.  
Never assume that power is disconnected from a circuit. Disconnect all power before installing or removing  
a chassis or working near power supplies.  
Ground the unit. Do not connect the power supply unit to an AC outlet without a ground connection.  
Connect the unit to a grounded AC outlet to comply with the appropriate regional safety standards.  
Place the unit near the socket outlet to be easily accessible.  
Look carefully for possible hazards in your work area, such as moist floors, ungrounded power extension  
cables, frayed power cords, and missing safety grounds.  
Do not work alone if hazardous conditions exist.  
In addition, following these guidelines when working on any equipment that is disconnected from a power  
source but still connected to telephone wiring or other network cabling:  
Never install telephone wiring during a lightning storm.  
Never touch uninsulated telephone wires or terminals unless the telephone line is disconnected at the net-  
work interface.  
Use caution when installing or modifying telephone lines.  
Power Cable  
If your system comes with the AC power option, use an AC power cable appropriate for your country.  
Check your local electrical codes and regulatory agencies for power cable requirements.  
12  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
Electrostatic Discharge Damage  
Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry. It can occur if electronic  
printed circuit cards are improperly handled and can cause complete or intermittent failures. Always follow  
these ESD prevention procedures when removing and replacing expansion modules:  
Ensure that the system chassis is electrically connected to earth ground.  
Wear an ESD-preventive wrist strap, ensuring that it makes good skin contact. Connect the clip to an  
unpainted surface of the chassis frame or to the rack to channel unwanted ESD voltages safely to ground.  
To guard against ESD damage and shocks, the wrist strap and cord must operate effectively.  
If no wrist strap is available, ground yourself by touching an unpainted metal part of the chassis or rack.  
To prevent equipment damage because of ESD, periodically  
check the resistance value of the antistatic strap. It should be  
between 1 and 10 MΩ (Mohm).  
CAUTION  
Optical Safety  
Use fiber-optic ports only for telecommunications applications that require  
optical fiber. Use the ports only with the appropriate connector. When not in  
use, replace the dust covers. Using these interfaces in ways other than those  
WARNING  
described in this guide can cause property damage or personal injury.  
Fiber-Optic Ports  
To protect your eyes, never look at the transmit LED or laser through a magnifying device while it is powered  
on. Never look directly at a fiber port on the chassis or at the ends of fiber cable when they are powered on.  
Note The OS-10 system uses a CLASS 1 laser device.  
Fiber-Optic Safety Precautions  
Follow these safety precautions when working with fiber-optic cables:  
Do not eat, drink or smoke in the work area. If fiber particles are ingested they could cause internal hemor-  
rhaging.  
Wear safety glasses with side shields to avoid getting fiber-optic splinters in your eyes.  
Do not look into the end of a fiber cable until you are sure that there is no light source at the other end. Use  
a fiber-optic power meter to ensure that the fiber is dark (that is, no power is being carried).  
Ensure that the work area is well ventilated.  
Do not touch your eyes while working with fiber-optic cables.  
Wear disposable aprons to minimize fiber particles on your clothing.  
Dispose of all cut fiber-optic pieces properly.  
Thoroughly clean the work area when the installation is complete.  
13  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
Chapter 1 Product Overview  
Chapter contents  
Introduction..........................................................................................................................................................15  
OnSite Platforms ............................................................................................................................................15  
14  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
1 • Product Overview  
Introduction  
The OnSite Series is family of ultra-compact, micro multi-service provisioning platforms (µMSPPs). The sup-  
ports flexible and economic delivery of time division multiplexing (TDM) and Ethernet-based packet data ser-  
vices over synchronous digital hierarchy (SDH) transport networks.  
The OS-10 system has two STM-1 ports for connection to the SDH network. The ports operate at 155.520  
Mbit/s and can be configured to operate as dual unprotected ports or as a protected pair using Linear 1+1 MSP.  
The STM-1 ports can also be configured in add-drop multiplexer (ADM) mode for operation in a ring net-  
work using SNCP path protection switching.  
The OS-10 supports clear-channel mapping of E1/T1 and DS3/E3 signals into SDH payloads, and uses next-  
generation SDH features, such as generic framing procedure (GFP), virtual concatenation (VCAT), link capac-  
itiy adjustment scheme (LCAS) and advanced packet intelligence functions for efficient transport of Ethernet-  
based data services.  
The OS-10 has one Ethernet LAN management port and one RS-232 serial port for access to the system man-  
agement functions. Remote access to OS-10 systems is possible through the use of an inband management  
channel that uses either a dedicated E1 link over a VC-12 or the SDH data communications channel (DCC).  
The OS-10 chassis can be mounted into a standard 19-inch EIA/TIA or a 300-mm ETSI rack. The chassis also  
supports a wall-mounting option and can also be operated in a stand-alone desktop configuration.  
The system uses natural convection cooling (that is, it contains no fans) and supports AC or DC power  
options.  
All cabling, other than AC power, is accessible from the front panel of the chassis. The system also provides  
activity and status LEDs for all client-signal and SDH network interfaces. The system weighs approximately 5  
kg (11 lbs) and has the following dimensions: 44.45 x 438.2 x 293 mm (height x weight x depth).  
You can manage and access the OS-10 system through a simple Web-based graphical user interface (GUI)  
called the OnSight Device Manager (DM) or a scalable network management system (NMS).  
OnSite Platforms  
The OS-10 Series has two modular platforms: the OS1052 and OS1063. Table 2 provides a summary of the  
base system configuration for each platform.  
Figure 1. OnSite Model 1052  
Introduction  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
1 • Product Overview  
Figure 2. OnSite Model 1063  
Table 3. Base System Configuration for OnSite Platforms  
Type  
Model OS1052  
Model OS1063  
SDH Trunks  
2 STM-1  
2 STM-1  
Client Signals  
8 E1 or 8 T1  
2 Ethernet  
Serial RS-232  
LAN  
21 E1 or 21 T1  
Serial RS-232  
LAN  
2
Management  
Expansion Slots  
2
The OS1052 and OS1063 systems have two expansion slots. The expansion slots support the insertion of the  
following modules for flexible configuration changes and capacity upgrades:  
21-port E1  
3-port DS3/E3  
2-port STM-1 optical and electrical  
8-port Ethernet 10/100BASE-TX  
Figure 3 on page 17 shows the front and back panels of the OS1052 base system without the expansion mod-  
ules installed. The OS1052 has eight built-in E1 and two built-in Ethernet 10/100BASE-TX interfaces. As a  
factory-installed option, the OS1052 is also available with eight T1 ports. The OS1052 uses a future bus con-  
nector for access to the 8 E1 or T1 ports on the base system.  
Introduction  
16  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
1 • Product Overview  
Figure 3. OS1052 Base System  
Figure 2 shows the front panel of the OS1063 system. The OS1063 uses a future bus connector for access to  
the 21 E1 or T1 ports on the base system. When the system is equipped with two 21-port high-density E1  
(HD-E1) expansion modules, the OS1063 provides access for up to 63 E1 ports. (See chapter 12 for a descrip-  
tion of the future bus connector and the features of the high-density E1 expansion module.) As a factory-  
installed option, the OS1063 is available with two STM-1 electrical interface (STM-1e) ports on the base sys-  
tem.  
Figure 4. OS1063 Base System  
Introduction  
17  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Chapter 2 Application Overview  
Chapter contents  
OS1052 Application..............................................................................................................................................19  
OS1063 Application..............................................................................................................................................21  
18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
2 • Application Overview  
OS1052 Application  
The advanced modular design of the Patton OnSite OS1052 provides unequaled flexibility in its class in terms  
of service offerings, capacity and functional upgrades.  
Figure 5. Typical OS1052 application  
OS1052 Application  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
2 • Application Overview  
The base OS1052 system is configured with:  
2 STM-1  
8 E1/T1  
2 Ethernet  
10/100Base-TX  
Two expansion module slots allow increasing system capacity beyond the initial base configuration. Additional  
ports and features only require simple insertion of one of the many available types of TDM and packet data  
modules.  
In only one RU, the OS1052 supports expansion up to:  
50 E1 ports  
18 Ethernet 10/100 ports  
The OS1052 incorporates next-generation SDH features such as virtual concatenation (VCAT), link capacity  
adjustment scheme (LCAS) and generic framing procedure (GFP) for efficient packet data transport. The plat-  
form also incorporates Layer 2 features such as VLAN tagging, rate limiting and statistical multiplexing with  
multi-level QoS control. The OS1052 is easily configured and managed through a simple Web-based GUI  
interface or the scalable Patton OnSight NMS.  
Figure 6. OS1052 Map + Modules  
OS1052 Application  
20  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
2 • Application Overview  
OS1063 Application  
The advanced modular design of the Patton OnSite OS1063 provides unequaled flexibility in its class in terms  
of service offerings, capacity and functional upgrades.  
Figure 7. Typical OS1063 application  
OS1063 Application  
21  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
2 • Application Overview  
The base OS1063 system is configured with:  
2 STM-1  
21 E1/T1  
Two expansion module slots allow increasing system capacity beyond the initial base configuration. Additional  
ports and features only require simple insertion of one of the many available types of TDM and packet data  
modules.  
In only one RU, the OS1063 supports expansion up to:  
63 E1 ports  
16 Ethernet 10/100 ports  
The OS1063 incorporates next-generation SDH features such as virtual concatenation (VCAT), link capacity  
adjustment scheme (LCAS) and generic framing procedure (GFP) for efficient packet data transport. The plat-  
form also incorporates Layer 2 features such as VLAN tagging, rate limiting and statistical multiplexing with  
multi-level QoS control. The OS1063 is easily configured and managed through a simple Web-based GUI  
interface or the scalable Patton OnSight NMS.  
Figure 8. OS1063 Map + Modules  
OS1063 Application  
22  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Chapter 3 Installation Overview  
Chapter contents  
Introduction..........................................................................................................................................................24  
Unpacking and Inspection.....................................................................................................................................24  
Site Preparation .....................................................................................................................................................24  
Site Environment ..................................................................................................................................................25  
Planning Your Site.................................................................................................................................................25  
Site Requirements ...........................................................................................................................................25  
Operating Environment Requirements ......................................................................................................26  
Power Supply Requirements ......................................................................................................................27  
Distribution Rack Requirements ...............................................................................................................27  
Mechanical Recommendations for the Rack ....................................................................................................28  
Protective Grounding for the Rack and Chassis ..............................................................................................28  
Space Requirements for the Rack ....................................................................................................................28  
Securing the Rack ...........................................................................................................................................28  
Tools and Equipment for Installation and Maintenance........................................................................................29  
OnSite System Installation ....................................................................................................................................29  
Mounting the Chassis to an EIA/TIA 19-Inch Rack .......................................................................................29  
Mounting the Chassis to an ETSI Rack ..........................................................................................................30  
Mounting the Chassis on the Wall ..................................................................................................................32  
Installing the Chassis Ground Connection ......................................................................................................33  
Connecting Power to the OS-10 System .........................................................................................................33  
Connecting AC Power to the OS-10 System .............................................................................................34  
Powering On the OS-10 System with AC Power ......................................................................................35  
Connecting DC Power to the OS-10 System ............................................................................................35  
Wiring Procedure for DC Input Power .....................................................................................................35  
Checking the OS-10 System Installation .........................................................................................................38  
23  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
Introduction  
This chapter provides the procedures for installing the OnSite OS-10 system.  
Unpacking and Inspection  
Do not unpack the OS-10 system until you are ready to install it. If the final installation site will not be ready  
for some time, keep the chassis in its shipping container to prevent accidental damage. When you are ready to  
install the unit, proceed with unpacking it.  
Note Do not discard the shipping cartons when you unpack the OS-10 sys-  
tem. Flatten and store them. You will need the containers if you need  
to move or ship the system. Repacking instructions will be provided  
in your return material authorization (RMA) paperwork.  
To check the contents of the shipping cartons, follow these steps:  
1. Check the contents of the shipping container and accessories box or bag against the content list and the  
packing slip which were included with your unit.  
2. Verify that you received all listed equipment, including the following:  
– OS-10 Series documentation (if ordered)  
– Optional equipment that you ordered, such as network interface cables, or special connectors  
3. Inspect all items for shipping damage.  
Note If anything appears to be damaged or you encounter problems install-  
ing or configuring your OS-10 Series chassis, contact customer ser-  
vice.  
4. Check the expansion modules that may be located in each slot. Ensure that the configuration matches the  
packing list and that all specified interfaces are included.  
Site Preparation  
This section describes the requirements your site must meet for safe installation and operation of your OnSite  
OS-10 Series equipment. Ensure that the site is properly prepared before beginning installation.  
The requirements described in this chapter are intended for the personnel responsible for installing and man-  
aging the network hardware. A working knowledge of telecommunications and local area network (LAN)  
operations and a familiarity with communications protocols that are used on interconnected networks are  
assumed. Installation, maintenance, and removal of a chassis, or its components must be done by qualified ser-  
vice personnel only. Qualified personnel have had appropriate technical training and experience that is neces-  
sary to be aware of the hazards to which they are exposed when performing a task and of measures to minimize  
the danger to themselves and other people. By carefully planning your site, you can maximize the performance  
of your existing network and ensure that it is ready to migrate to future service and capacity upgrades.  
Introduction  
24  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
3 • Installation Overview  
Site Environment  
The OS-10 system can be mounted in a rack or on a wall. The location of the chassis and layout of your equip-  
ment rack or wiring room are extremely important for proper system operation. Equipment that is too close  
together, ventilation that is inadequate, and panels that are inaccessible can make system maintenance difficult  
or cause system malfunctions and possible shutdowns.  
The following precautions help you plan an acceptable operating environment for your OS-10 system and  
avoid environmentally caused equipment failures:  
Ensure that the room in which you operate your system has adequate air circulation. Electrical equipment  
generates heat. Ambient air temperature might not be able to cool equipment to acceptable operating tem-  
peratures without adequate circulation.  
Always follow the proper ESD-prevention procedures described in §3.2 (Electrostatic Discharge Damage)  
to avoid damage to equipment. Damage from static discharge can cause immediate or intermittent equip-  
ment failure.  
Ensure that the chassis cover and all expansion slot covers are secure. The chassis is designed to allow cool-  
ing air to flow effectively inside it. An open chassis allows air leaks, which might interrupt the flow of cool-  
ing air from internal components.  
When planning your site layout and equipment location, remember the following precautions to help avoid  
equipment failures and reduce the possibility of environmentally caused equipment problems.  
Maximum recommended operating temperature – The maximum recommended operating temperature for  
the OS-10 is 50°C (122°F). Determine a suitable operating environment based on this recommendation.  
Elevated operating ambient temperature – If the unit is installed in a closed or multiunit rack assembly, the  
operating temperature of the rack environment may be greater than the ambient temperature of the room.  
Keep this in mind when you install the unit.  
Reduced airflow – Install the OS-10 system chassis in the rack so that the amount of airflow required for safe  
operation of the equipment is not compromised.  
Mechanical load – Mount the OS-10 system chassis in the rack to avoid a potentially hazardous condition due  
to uneven mechanical loading.  
Circuit overload – When you connect the OS-10 system chassis to the supply circuit, consider the effect that  
overloading of the circuits might have on over-current protection and supply wiring.  
Reliable Ground – Maintain reliable grounding for the OS-10 system and all rack-mounted equipment, giving  
particular attention to supply circuits.  
Planning Your Site  
Site Requirements  
To install your OS-10 equipment successfully, you should plan your site carefully. The site planning process  
has three major areas for consideration to ensure that your physical installation meets the requirements for a  
safe and successful installation:  
Environmental, safety, and thermal requirements for the OS-10 system  
Power and local building and electrical code requirements  
Site Environment  
25  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
3 • Installation Overview  
Distribution rack requirements  
The following sections provide further details for each area.  
Operating Environment Requirements  
You need to verify that your site meets all environmental and safety requirements. During the early planning  
stages of installing or modifying your network, it is important that you develop a thorough understanding of  
the regulations that pertain to your location and industry.  
Temperature – The OS-10 system generates a specified amount of heat as indicated on the data sheet. It is  
essential that you provide a temperature-controlled environment for both proper performance and safety.  
Install the equipment only in a temperature- and humidity-controlled indoor area that is free of airborne mate-  
rials that can conduct electricity.  
The following are some general thermal recommendations for your wiring closet or equipment room:  
Ensure that the ventilation in the area is adequate to maintain a temperature below 50°C (122°F).  
Install a reliable air conditioning and ventilation system.  
Keep the ventilation in the wiring closet running during nonbusiness hours; otherwise, the equipment can  
overheat.  
Maintain the following ambient operating temperature: 0° to 50° C (32° to 122°F)  
Maintain the following storage temperature: –40° to 70°C (–40° to 158°F)  
Airflow requirements – To ensure proper airflow through the OS-10 equipment, follow these recommenda-  
tions when you are installing your chassis:  
Leave 7.62 cm (3 inches) of minimum clearance on both the left and right sides of the chassis.  
Leave a half-rack unit (RU) of minimum clearance above and below the chassis for properairflow.  
Note The OS-10 is a convection-cooled system, and adherence to these  
clearance requirements is required for proper operation of the system.  
Humidity – Keep the operating humidity between 5 and 95 percent relative humidity (noncondensing).  
Table 4 summarizes the acceptable operational conditions for the OS-10 system.  
Table 4. Environmental Conditions for Operating the OS-10 System  
Environment  
Minimum  
Maximum  
Temperature  
Humidity  
Altitude  
Ambient operating  
Short-term (96 hours)  
Short-term (96 hours)  
Short-term (96 hours)  
Ambient operating  
5°C  
0°C  
5%  
5%  
–60 m  
+40°C  
+50°C  
80%  
95%  
1800 m  
Planning Your Site  
26  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
Power Supply Requirements  
To operate your OS-10 equipment safely, follow these requirements:  
Ensure that your power supply meets the site power requirements of the equipment to be installed.  
Check the power at your site to ensure that you are receiving “clean” power (free of spikes and noise). Install  
a power conditioner, if necessary.  
Ensure that DC connections are made by an on-site electrician.  
When connecting power to installed equipment, avoid connecting through an extension cord or apower  
strip.  
Table 5 summarizes the power requirements for the OS-10 system chassis.  
Table 5. Power Requirements for the OS-10 System  
Nominal Input  
Voltage  
Nominal Input  
Current  
Power Source  
Tolerance Limits  
AC  
DC  
110 or 220 VAC 1.0 A at 50 to 60 Hz  
–48 VDC 2.0 A  
100 to 245 VAC  
–36 to –72 VDC  
Note If you system is shipped with the AC power option, use an AC power  
cable appropriate for your country. Check your local electrical codes  
and regulatory agencies for power cable requirements.  
Note The system uses a universal AC power supply with an autoselection  
function for operation with either 110 V (60 Hz) or 220 V (50 Hz).  
Distribution Rack Requirements  
The OS-10 can be installed in either a 19-inch EIA/TIA or ETSI 300-mm rack.  
Note The 19-inch EIA/TIA rack should comply with the specification in  
EIA-310-D.  
Note The ETSI 300-mm rack should comply with the specification in  
ETSI EN 300 119-3 V2.1.0 (2004-05).  
Planning Your Site  
27  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
3 • Installation Overview  
Mechanical Recommendations for the Rack  
The following information will help you plan your equipment rack configuration:  
Use a rack made of steel or aluminum.  
Install equipment in the lower half of the rack first to avoid making the rack top heavy.  
The rack should be able to support the full weight of the final installed chassis.  
Enclosed racks must have adequate ventilation. Ensure that the rack is not overly congested because each  
unit generates heat. An enclosed rack should have louvered sides and a fan to provide cooling air.  
When mounting a chassis in an open rack, ensure that the rack frame does not block the cooling holes. If  
the chassis is installed on slides, check the position of the chassis when it is seated all the way into the rack.  
In an enclosed rack with a ventilation fan in the top, excessive heat generated by equipment near the bot-  
tom of the rack can be drawn upward and into the intake ports of the equipment above it in the rack. In  
addition, ensure that you provide adequate ventilation for equipment at the bottom of the rack.  
Baffles can help isolate exhaust air from intake air, which also helps draw cooling air through the chassis.  
The best placement of the baffles depends on the airflow patterns in the rack, which can be found by exper-  
imenting with different arrangements.  
Protective Grounding for the Rack and Chassis  
Use a rack grounding kit and a ground conductor that is carried back to earth or another suitable building  
ground. The OS-10 chassis is designed with mounting brackets that provide solid metal-to-metal connection  
to the rack. If you do not use equipment racks, you can attach a wiring terminal directly to the chassis at the  
position indicated for appropriate grounding. Figure 9 shows the location of the grounding terminal location  
for the OS-10 chassis.  
Figure 9. Grounding Terminal Location for the OS-10 System Chassis  
Note Because building codes vary worldwide, OnSite Systems strongly rec-  
ommends that you consult an electrical contractor to ensure that  
proper equipment grounding is in place for your specific installation.  
Space Requirements for the Rack  
Provide enough space in front of and behind the OS-10 system chassis so that you can service it easily. Typi-  
cally, allow a minimum of 122 cm (48 inches) in front of the rack and 61 cm (24 inches) behind the rack.  
Securing the Rack  
The rack should be attached to the equipment room floor with 9.5-mm (3/8-inch) lag screws or equivalent  
hardware. The floor under the rack should be level within 5 mm (3/16 inch). Use a floor-leveling cement com-  
pound if necessary or bolt the racks to the floor.  
Planning Your Site  
28  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
OnSite Series Getting Started Guide  
3 • Installation Overview  
Tools and Equipment for Installation and Maintenance  
You need the following tools and equipment to install or upgrade the OS-10 system and its components:  
ESD-preventive cord and wrist strap (when working with modular components or expansion cards)  
Number 1 or number 2 Phillips screwdriver  
Mounting brackets (provided); two are required for rack mounting or for wall mounting  
8 screws (provided) to secure the L mounting brackets to the OS-10 system chassis (four screws for each  
bracket)  
A minimum of four 12-24 x 3/4-inch screws (not provided) to secure the OS-10 system chassis to the rack  
Suitable screws and wall anchors to install an OS-10 system on a wall  
Cable ties, if required, for organizing cables  
In addition, depending on the type of modules you plan to use, you might need the following equipment to  
connect the OS-10 system to an external network:  
Cables for connection to the fiber-optic and client signal ports (depending on configuration)  
Ethernet hub or PC with a network interface card for connection to Ethernet LAN ports  
Console terminal (an ASCII terminal or a PC running terminal emulation software) configured for 9,600  
baud, 8 data bits, no parity, and 1 stop bit  
OnSite System Installation  
Note Read the information in this section thoroughly and completely  
before you attempt to install or remove an OS-10 Series system chas-  
sis.  
Only trained and qualified personnel should be allowed to install, replace, or  
service this equipment.  
WARNING  
Mounting the Chassis to an EIA/TIA 19-Inch Rack  
To install the OS-10 system chassis in an EIA/TIA 19-inch rack, see Figure 10 and follow these steps:  
1. Install the two L mounting brackets in the orientation shown in Figure 10. Insert and fully tighten the  
screws to secure the brackets to the chassis (four screws for each bracket).  
Note For this rack configuration, the L mounting bracket holes are flush  
with the front panel of the OS-10 system, as shown in Figure 4.  
2. Position the chassis in the rack and align the mounting holes in the L bracket with the mounting holes in  
the equipment rack.  
Note The mounting-hole pitch for the 19-inch rack has the following  
repetitive pattern: 5/8”- 5/8”-1/2”.  
Tools and Equipment for Installation and Maintenance  
29  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
3 • Installation Overview  
Note Take care to load the rack so that it is not top heavy.  
Note Do not cover vents that would restrict airflow. Leave a minimum of a  
half-rack space above and below the OS-10 system for adequate ven-  
tilation.  
3. Secure the chassis using four 12-24 x 3/4-inch screws (two screws for each side) through the elongated  
holes in the L bracket nearest to the chassis and to the threaded holes in the mounting post. Use a suitable  
screwdriver for this task.  
4. Tighten any loose captive installation screws on the expansion slot front panel covers.  
Figure 10. Mounting the OS-10 System Chassis in an EIA/TIA 19-Inch Rack  
Mounting the Chassis to an ETSI Rack  
To install the OS-10 system chassis in an ETSI 300-mm rack, see Figure 11 and follow these steps:  
1. Install the two L mounting brackets in the orientation shown in Figure 11. Insert and fully tighten the  
screws to secure the brackets to the chassis (four screws for each bracket). Use a suitable screwdriver for this  
task.  
Note For this rack configuration, the L mounting bracket holes are posi-  
tioned 50 mm back from the front panel of the OS-10 system, as  
shown in Figure 11.  
2. Position the chassis in the rack and align the mounting holes in the L bracket with the mounting holes in  
the equipment rack.  
Note The mounting-hole pitch for the ETSI 300 mm rack is 25 mm.  
Note Take care to load the rack so that it is not top heavy.  
OnSite System Installation  
30  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
Note Do not cover vents that would restrict airflow. Leave a minimum of a  
half-rack space above and below the OS-10 system for adequate ven-  
tilation.  
3. Secure the chassis using four 12-24 x 3/4-inch screws (two screws for each side) through the elongated  
holes in the L bracket nearest to the chassis and to the threaded holes in the mounting post. Use a suitable  
screwdriver for this task.  
4. Tighten any loose captive installation screws on the expansion slot front panel covers.  
Figure 11. Mounting the OS-10 System in an ETSI 300-mm Rack  
OnSite System Installation  
31  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
3 • Installation Overview  
Mounting the Chassis on the Wall  
Note When choosing a wall-mounting location, consider the cable limita-  
tions and the wall structure. Use the four L brackets provided for rack  
mounting to mount the chassis on a wall. The brackets provide the  
most stable installation for the chassis.  
1. Install the two L mounting brackets in the orientation shown in Figure 12. Insert and fully tighten the  
screws to secure the brackets to the chassis (four screws for each bracket). Use a suitable screwdriver for this  
task.  
Note For this rack configuration, the L mounting bracket holes are flush  
with the bottom panel of the OS-10 system chassis.  
2. Position the chassis against the wall using wall mount option 1 or option 2, as shown in Figure 12.  
3. Secure the chassis to the wall using four 12-24 x 3/4-inch screws (two screws for each side) through the  
elongated holes in the L bracket nearest to the chassis. Use a suitable screwdriver for this task.  
4. Tighten any loose captive installation screws on the expansion slot front panel covers.  
Figure 12. Mounting the OS-10 System Chassis on a Wall  
OnSite System Installation  
32  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
Installing the Chassis Ground Connection  
The OS-10 system chassis requires a reliable earth ground connection. You must connect the chassis to a reli-  
able earth ground. The ground wire must be installed in accordance with local electrical safety standards.  
Table 6. Ground Wire Specifications  
Grounding Standard  
Wire  
EN/IEC 60950  
AWG 18 (1 mm2) or larger wire and an  
appropriate user-supplied ring terminal  
NEBS  
AWG 6 (13 mm2) wire and the ground  
lug provided in the accessory kit  
NEC (National Electric Code) AWG 14 (2 mm2) or larger wire and an  
appropriate user-supplied ring terminal  
To connect the OS-10 system chassis to a reliable earth ground, follow these steps:  
1. Strip one end of the ground wire to the length required for the ground lug or terminal.  
Note For the NEBS ground lug, the length is approximately 0.75 inches  
(20 mm)  
Note For a user-provided ring terminal—as required  
2. Crimp the ground wire to the ground lug or ring terminal, using a crimp tool of the appropriate size.  
3. Attach the ground lug or ring terminal to the chassis grounding terminal location shown in Figure 3.  
4. Connect the other end of the ground wire to a suitable grounding point at your site.  
After installation and proper grounding of the OS-10 chassis, you can connect the following:  
Power wiring  
Cables for the fiber-optic interface and Category 5 cables for E1 and Ethernet client signal interfaces  
Category 5 cables for the Ethernet LAN and SERIAL management ports  
Connecting Power to the OS-10 System  
The system supports AC and DC power options, as listed in Table 7. These options are factory installed.  
Table 7. OS-10 Power Options  
Power Options  
Nominal Input  
Tolerance Limit  
Feature  
AC  
110 VAC at 50 Hz and 100 to 245 VAC  
220 VAC at 60 Hz  
Auto-switching AC to DC power converter  
DC  
–48VDC  
–36 to –72 VAC  
Auto-switching AC to DC power converter  
Note Both AC and DC options provide short-circuit and over-voltage pro-  
tection.  
Note The DC option provides reverse input polarity protection.  
OnSite System Installation  
33  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
OnSite Series Getting Started Guide  
3 • Installation Overview  
Note The DC-to-DC converter has dual power inputs (A and B power).  
The system continues to operate normally if either the A or B power  
input fails.  
The system uses natural convection for heat dissipation (that is, it does not use fans). The absence of fans  
increases system reliability and eliminates periodic maintenance visits for fan filter replacement.Table 8 pro-  
vides the maximum power consumption figures for the OS-10 system under normal operating conditions.  
Table 8. Power Consumption  
System Configuration  
Maximum Power (W)  
Base system  
Base system with a single expansion module  
Base system with dual expansion modules  
40  
50  
60  
This section explains how to connect the AC or DC power to the OS-10 system chassis.  
Read the installation instructions before connecting the system to the power  
source.  
WARNING  
Do not work on the system or connect or disconnect cables during periods of  
lightning activity.  
WARNING  
The installation must comply with all required electrical codes applicable at the installation site.  
Connecting AC Power to the OS-10 System  
If your OS-10 system uses AC power, connect it to a 15 A at 120 VAC (or 10 A at 240 VAC) circuit with over-  
current protection.  
Note The input voltage tolerance limits for AC power are 100 to 245 VAC.  
•AC-connected units must have a permanent ground connection in addition to  
the power cable ground wire. NEBS-compliant grounding satisfies this  
requirement.  
WARNING  
•This product relies on the installation of the building for short-circuit (over-  
current) protection. Ensure that the protective device is rated not greater  
than: 15A at 120 VAC (or 10 A at 240 VAC).  
•The AC power supply for the OS-10 system has Double Pole/Neutral Fusing.  
OnSite System Installation  
34  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
Powering On the OS-10 System with AC Power  
To power on the OS-10 system using AC power, follow these steps:  
1. Connect the AC power cable to the OS-10 system and then to the wall outlet.  
2. Turn the power switch on the back panel of the OS-10 system to the ON position.  
Note The green PWR (power) LED on the front panel is lit when the sys-  
tem receives power from the AC source.  
After turning off the AC power switch, wait for at least 3 seconds  
before turning it back to the on position.  
CAUTION  
Connecting DC Power to the OS-10 System  
If your OS-10 system has a DC-input power supply terminal block on the front panel, follow the directions in  
this section for proper wiring.  
This product relies on the installation of the building for short-circuit (over-  
current) protection. Ensure that the protective device is rated not greater than  
15 A at 60 VDC.  
WARNING  
Table 9 summarizes the wiring requirements for the OS-10 system chassis with a DC-input power supply.  
Note For installations compliant with the National Electric Code, an AWG  
14 (2.0 mm2) wire is required for DC input and safety ground wire.  
Table 9. DC Wiring Requirements for the OS-10 System Chassis  
Safety Ground  
DC Nominal Input  
DC Input Wire Size  
Over-Current Protection  
Wire Size  
AWG 18 (1.0 mm2)  
AWG 14 (2.0 mm2)  
–48 VDC at 2.0 A  
15 A  
Note The input voltage tolerance limits for nominal –48 VDC power sup-  
plies is –36 to –72 VDC.  
Wiring Procedure for DC Input Power  
To connect DC power to the OS-10 system, see Figure 13 and follow these steps:  
•Connect the DC input wires to the OS-10 system with the following wiring  
sequence.  
Figure 13 shows the terminal block for the DC power supply on the OS-10  
system. Wire the DC power supply as shown.  
WARNING  
OnSite System Installation  
35  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
OnSite Series Getting Started Guide  
3 • Installation Overview  
Figure 13. Wiring the OS-10 System for DC Power  
1. Choose an available circuit from a DC power source and identify both the positive and negative leads for  
this circuit.  
Note The DC power source may be a DC circuit breaker or an AC-to-DC  
power rectifier.  
•Do not touch the circuit with your hands or with any other instrument until  
you make sure that there is no power present on the circuit.  
•Make sure that power is removed from the DC circuit that will supply power  
WARNING  
to the OS-10 system before performing any of the following procedures.  
2. Remove power from this circuit.  
Note To ensure that power is removed from the DC circuit, locate the cir-  
cuit breaker for the DC circuit, switch the circuit breaker to the OFF  
position, and tape the circuit-breaker switch in the OFF position.  
3. Strip the DC input wires that will connect the circuit to the DC power terminal block on the OS-10 sys-  
tem to the appropriate length.  
4. Connect the positive lead of this circuit to ground. See wiring 1-A in Figure 13.  
Note As an option, you may choose another common grounding point  
other than the one shown in Figure 13. The choice depends on the  
grounding practice for your particular location. Figure 13 shows the  
grounding point colocated with the DC circuit for “A” power.  
OnSite System Installation  
36  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
3 • Installation Overview  
The ground wire should always be connected first and discon-  
nected last.  
CAUTION  
5. Connect the positive lead of the circuit to the return direction for “A” power on the OS-10 system termi-  
nal block. See wiring 2-A in Figure 7.  
Note The terminal block indicates the return direction for “A” power by  
the letter R. This lead is second from the top on the OS-10 system  
terminal block.  
Note Step 4 and Step 5 results in the grounding of the return direction for  
“A” power on the OS-10 system terminal block.  
6. Connect the negative lead of the circuit to the “A” power input lead on the OS-10 system terminal block.  
See wiring 3-A on figure 13 on page 36.  
Note The terminal block indicates the “A” power lead by the letter A. This  
lead is first from the top on the OS-10 system terminal block.  
Continue with the following steps if a second circuit is available for the provision of redundant “A” and  
“B” DC power inputs on the system. Otherwise, go directly to Step 10 to complete this task.  
7. Connect the positive lead of this circuit to ground. See wiring 1-B on figure 13 on page 36.  
Note As an option, you may choose another common grounding point  
other than the oneshown in Figure 13. The choice depends on the  
grounding practice for your particular location. Figure 13 shows the  
grounding point colocated with the DC circuit for “B” power.  
The ground wire should always be connected first and discon-  
nected last.  
CAUTION  
8. Connect the positive lead of the circuit to the return direction for “B” power on the OS-10 Series system  
terminal block. See wiring 2-B on Figure 13.  
Note The terminal block indicates the return direction for “B” power by  
the letter R. This lead is fourth from the top on the OS-10 system  
terminal block.  
Note Step 7 and Step 8 result in the grounding of the return direction for  
“B” power on the OS-10 system terminal block.  
OnSite System Installation  
37  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
3 • Installation Overview  
9. Connect the negative lead of the circuit to the “B” power input lead on the OS-10 system terminal block.  
See wiring 3-B on figure 13 on page 36.  
Note The terminal block indicates the “B” power lead by the letter B. This  
lead is third from the top on the OS-10 system terminal block.  
Do not over torque the terminal block captive thumbscrew or ter-  
minal block contact screws.  
CAUTION  
10. Secure the wires using cable ties or similar appropriate cable tie-downs.  
11. Turn on power to the DC circuit.  
Note The green PWR (power) LED on the front panel is lit when the sys-  
tem receives power from the DC source.  
Checking the OS-10 System Installation  
When you first apply power to the system, the STAT (status) LED shows a solid amber light. This light indi-  
cates that the system is booting. The STAT LED turns to a solid green light when the system completes the  
boot process and is ready for operation.  
OnSite System Installation  
38  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Chapter 4 System Management Access  
Chapter contents  
Introduction..........................................................................................................................................................40  
General Overview..................................................................................................................................................40  
Ethernet LAN Management Port...........................................................................................................................41  
Serial Management Port ........................................................................................................................................42  
Gaining Access to the System ................................................................................................................................43  
Access through the Serial Port .........................................................................................................................43  
Access through the Ethernet LAN Management Port ......................................................................................44  
Web-Based Management Interface ........................................................................................................................45  
Launching the GUI Application .....................................................................................................................45  
Autonomous Alarm Messages................................................................................................................................47  
Engineering Orderwire (EOW) .............................................................................................................................49  
39  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
Introduction  
This chapter provides the procedures for configuring and monitoring the local serial and LAN management  
(LM) ports, and the inband management channel (IMC) for remote management communications. The chap-  
ter also provides the procedures for configuring and using the Orderwire communications port (if the AUX  
port is factory-installed).  
General Overview  
The base OnSite OS-10 system provides two management ports from which you can access the system man-  
agement functions. One of the management ports is an Ethernet LAN (10/100BASE-TX) port. The other is  
an RS-232 SERIAL port.  
Figure 14 shows the location of the two management ports on the base OS1052 and OS1063 systems.  
Figure 14. Serial and LAN Management Ports on the Base OS1052 and OS1063 Systems  
Introduction  
40  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
4 • System Management Access  
Figure 15 provides a close-up view of the two management ports. The figure includes the location of the RJ-45  
connector pins for both ports.  
Figure 15. Detail of the Management Ports  
Figure 16 shows the location of the signal pins on the RJ-45 plug.  
Figure 16. Location of Signal Pins on the RJ-45 Plug  
Ethernet LAN Management Port  
The Ethernet LAN management port complies with the following standards:  
IEEE 802.3u (PHY)  
IEEE 802.3 (MAC)  
IEEE 802.3x (flow control)  
The port supports autonegotiation, which is always enabled.  
Table 10 provides the cabling specifications for the Ethernet LAN management port.  
Table 10. Ethernet LAN Management Port Cabling Specifications  
Cable  
Specification  
Connector  
RJ-45  
Type  
Reach  
Category 5  
100 m  
Ethernet LAN Management Port  
41  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
OnSite Series Getting Started Guide  
4 • System Management Access  
Table 11 provides the pin assignments for the RJ-45 connector.  
Table 11. Pin Assignments for the Ethernet LAN Management Port  
Signal Name  
Description RJ-45 Pin  
RXN  
RXP  
TXN  
TXP  
Receive tip  
Receive ring  
Transmit tip  
Transmit ring  
3
6
1
2
Serial Management Port  
The physical connector for the RS-232 SERIAL management port is an RJ-45 connector. Table 12 provides  
the pin assignments for the RJ-45 connector.  
Note A connector adapter is supplied with the system to allow the connec-  
tion of the RS-232 signal to a PC with a DB-9 connector.  
Table 12. Pin Assignments for the RS-232 Serial Management Port  
Signal Name  
Description  
RJ-45 Pin  
RS232_TXD output Transmit data  
RS232_RXD input Receive data  
6
3
GND  
Ground  
4 and 5  
Table 13 lists the serial port parameters:  
Table 13. RS-232 Serial Port Parameters  
Parameter  
Property  
Baud rate  
Data  
Parity  
9,600 to 38,400 (asynchronous)  
8 bits  
None  
1 bit  
Stop  
Table 14 lists the required VT100 terminal emulation settings for the PC that connects to the serial port.  
Table 14. VT100 Terminal Emulation Settings  
Parameter  
Setting  
Port  
COM1  
Baud rate  
Data  
Parity  
9,600  
8 bits  
None  
1 bit  
Stop  
Flow control  
None  
Serial Management Port  
42  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
OnSite Series Getting Started Guide  
4 • System Management Access  
Gaining Access to the System  
There are two ways of gaining access to the system management functions. One way is through the SERIAL  
port and the command line interface (CLI). The other way is through the Ethernet LAN port and the web  
browser interface. The following sections describe the procedures for each of the access methods.  
Access through the Serial Port  
To gain management access to the system for the first time through the SERIAL port, follow these steps:  
1. Connect a PC to the SERIAL management port.  
Note Use the DB-9-to-RJ-45 adapter cable supplied with the system.  
2. Launch the VT100 terminal emulation program on the PC.  
Note Configure the terminal in accordance with the settings in Table 14.  
3. Press the Enter key on the PC to obtain a login prompt from the system.  
4. Log in to the system using the Super user ID and password.  
Note Only the Super user is able to perform the following task.  
Note The user ID for the Super user is super (all lowercase letters).  
Note The factory-assigned default password for the Super user is super (all  
lowercase letters).  
After successful completion of the login, the system responds with the CLI (command-line interface)  
prompt.  
Note The CLI command prompt for the system is OnSite >  
5. Type the following CLI command to configure the IP address for the Ethernet LAN management port,  
and then press the Enter key:  
config mgmt-enet ip-address aaa.bbb.ccc.ddd  
Note aaa.bbb.ccc.ddd is the standard dotted-decimal notation.  
6. Type the following CLI command to configure the net mask for the Ethernet LAN management port, and  
then press the Enter key:  
config mgmt-enet ip-netmask aaa.bbb.ccc.ddd  
7. Type the following CLI command to configure the default gateway for the Ethernet LANmanagement  
port, and then press the Enter key:  
config mgmt-enet default-gateway aaa.bbb.ccc.ddd  
Note By default, the IP address is set to 192.168.2.100, the net mask is set  
to 255.255.255.0, and the default gateway is set to 192.168.2.1  
Gaining Access to the System  
43  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
8. Type the following CLI command to save the IP settings (address, net mask, and default gateway)for the  
Ethernet LAN management port to the system configuration file, and then press the Enter key:  
save config  
Note Saving the configuration is important to prevent the loss of the IP  
configuration data if a system reset or reboot occurs.  
Changing the IP address, net mask, and default gateway settings  
for the Ethernet LAN management port could result in the loss-of-  
management connectivity to the system, if the connection is cur-  
CAUTION  
rently through that port.  
At this point, the system responds with Configuration Saved to indicate that the IP settings have been saved to  
the system. The system is now ready for operation using the Web-based management interface.  
Note You may also have access to the system through Telnet. This access  
requires prior configuration of the IP address of the Ethernet LAN  
management port through the RS-232 SERIAL port, as indicated in  
the preceding steps.  
Note The system terminates the management session for any user when the  
session remains inactive for 30 seconds. This termination applies to  
management sessions through the SERIAL port or through Telnet.  
The login prompt appears when the system terminates a previously  
active session through the SERIAL port.  
Access through the Ethernet LAN Management Port  
To gain management access to the system for the first time through the Ethernet LAN management (LM) port,  
follow these steps:  
1. Connect a PC to the Ethernet LAN management port using the RJ-45 connector.  
Note You may connect the PC to the system from a remote location using  
an IP LAN or WAN that connects to the Ethernet LAN management  
port.  
2. Configure the PC using the factory default settings for the Ethernet LAN management port.  
Note By default, the IP address is set to 192.168.2.100, the net mask is set  
to 255.255.255.0, and the default gateway is set to 192.168.2.1  
3. Launch the Web browser of your choice, and type the default IP address of the system in the Address field  
of the browser.  
4. Log in to the system using the super, admin, or monitor user ID and password.  
Note The factory-assigned default password for the Super user is super (all  
lowercase letters).  
Gaining Access to the System  
44  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
4 • System Management Access  
features. Once you gain access to the system through the Ethernet LAN port, you may change the IP settings  
for the port for secure access in the future.  
5. Refer to the OnSite Series Administrator’s Reference Guide, located on the CD that came with your unit and  
Save the system configuration to prevent the loss of the new IP  
settings if a system reboot occurs.  
Refer to the OnSite Series Administrator’s Reference Guide,  
CAUTION  
located on the CD that came with your unit and online at  
Note Once the changes take place, you will loose connectivity to the sys-  
tem, but you can regain access immediately by typing the new IP  
address of the system in the Address field of the browser.  
Web-Based Management Interface  
The system provides a simple but powerful Web-based management interface to configure and monitor the  
OnSite OS-10 system. This graphical user interface (GUI) is called the OnSight Device Manager (DM) and is  
accessible through a Web browser using Hypertext Transfer Protocol (HTTP).  
Note The system supports the following Web browsers: Microsoft Internet  
Explorer 6+, Netscape 7+, Mozilla 1.7+, and Mozilla Firefox 1.0+ on  
Windows, Solaris, and Linux platforms.  
The OnSight DM allows you to have full access to the system management functions. These functions include  
the ability to set up or change all configurable items on the system and the ability to create and delete connec-  
tions between the client ports and SDH network interface. The interface also allows you to monitor and dis-  
play current active alarms, performance monitoring parameters, and alarm and event logs.  
Launching the GUI Application  
To launch the Web-based management interface, follow these steps:  
Note This procedure requires prior configuration of the IP address of the  
Ethernet LAN management port through the RS-232 SERIAL port  
or LAN port, as indicated in §6.4.  
1. Connect the PC to the Ethernet LAN management port using the RJ-45 connector.  
Note You may connect the PC to the system from a remote location using  
an IP LAN or WAN that connects to the Ethernet LAN management  
port.  
2. Launch the Web browser of your choice, and type the IP address of the system in the Address field of the  
browser.  
3. Log in to the system using the super, admin, or monitor user ID and password.  
Web-Based Management Interface  
45  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
After successful completion of the login, the browser displays the OnSight DM splash screen from which you  
can select the language of your choice (English or Chinese, currently). After language selection, the browser  
displays the System Information page. The OnSight DM screen is divided into three frames, as shown in  
Figure 17. Table 15 provides a description of each frame.  
You may now start to configure and operate the system using the GUI interface.  
Note For proper display of the GUI interface, you must set your browser to  
allow “pop-up” windows.  
Figure 17. Web-Based Management GUI Frames  
Table 15. Web-Based Management GUI Frame Descriptions  
GUI Frames  
Provides...  
Status (top frame)  
An overview of the system identity, including the system  
name and IP address, and the support contact information  
and status of active alarms.  
Navigation (bottom left frame) The main categories and subdivisions of system functions.  
Content (bottom right frame)  
The main area for information display and configuration.  
Web-Based Management Interface  
46  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
Autonomous Alarm Messages  
You can configure the system to generate autonomous alarm messages that can be received and displayed by an  
SNMP-based network management system (NMS).  
By default, the system does not generate SNMP traps. To allow the generation of SNMP traps, you must first  
configure the IP address of the NMS host device or devices to which you wish to direct the traps.  
To configure the system as an SNMP trap sender for an SNMP trap receiver, see Figure 12 and follow these  
steps:  
1. Select the SYSTEM folder from the navigation menu.  
2. From the expanded SYSTEM folder, select Management Access.  
3. From the expanded Management Access folder, select Trap Receiver.  
4. On the SNMP Trap Receivers page, click on Add.  
5. In the Add New Trap Receiver page, type the Trap Receiver Address and Community String.  
Note The community string controls access between a client (the OS-10  
system) and a server (the NMS host).  
6. Set the Version to configure the system to send SNMP V1 or V2 traps.  
7. Type the Source Agent Address of the SNMP agent.  
Note The OS-10 generates SNMP traps that contain the IP address of the  
source agent. By default, the system uses the address of the Ethernet  
LAN management port as the source agent address. However, you  
may use another address (for example, the inband management chan-  
nel address) according to the routing settings for the system.  
8. Click on Close to close the window.  
At this point, the Trap Receivers page displays the settings for the new receiver.  
Figure 18. Configuring an SNMP Trap Receiver  
Autonomous Alarm Messages  
47  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
To remove an existing SNMP trap receiver, follow these steps:  
1. Select a trap receiver on the SNMP Trap Receivers page.  
2. Click on Delete to remove the trap receiver.  
At this point, the system removes the trap receiver, and it is no longer displayed in the table.  
In addition to supporting the generation of traps to an SNMP-based NMS, the system also sends autonomous  
messages to all connected OnSight NMSs. The OnSight NMS provides centralized management and control  
of OS-10 systems in point-to-point, linear, and ring ADM subnetworks.  
To display the OnSight NMS servers authorized to manage the OS-10 system, see Figure 19 and follow these  
steps:  
1. Select the SYSTEM folder from the navigation menu.  
2. From the expanded SYSTEM folder, select Management Access.  
3. From the expanded Management Access folder, select NMS.  
On the Authorized NMS Servers page, the table displays the IP addresses of the OnSight NMS servers autho-  
rized for management connectivity to the system.  
To add an OnSight NMS server to the list of authorized servers, see Figure 19 and follow these steps:  
1. On the Authorized NMS Servers page, click on Add.  
2. In the Add Authorized NMS Server window, type the NMS IP Address and click on Apply.  
3. Click on Close to close the window.  
Figure 19. Configuring an Authorized OnSight NMS Server  
Autonomous Alarm Messages  
48  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
4 • System Management Access  
Engineering Orderwire (EOW)  
If the system is equipped with the factory-installed AUX (auxiliary) board, you can use AUX port 1 (AUX 1)  
for voice communications between two or more interconnected OnSite OS-10 Series systems.  
Figure 20 shows the location of EOW port (AUX 1) on the system. The port is located on the right side of the  
chassis, at the back.  
Figure 20. Location of EOW port (AUX 1) on OS-10 Series Chassis  
The EOW port supports a 2-wire analog interface (tip and ring) with a nominal impedance of 900-ohm and  
A-law PCM voice encoding. The system carries the PCM-encoded 64 kbit/s voice channel in either the E1 or  
E2 byte of the STM-1 section overheard (SOH).  
As a Foreign eXchange Station (FXS) interface, the EOW port supports the following functions:  
Dial tone  
Battery current  
Ring voltage  
The system uses an RJ-11 connector for the EOW port (AUX 1) but only two pins are used for the 2-wire con-  
nection: pin 2 (tip) and pin 3 (ring), as shown in Figure 21.  
Note The “tip” is the ground side and the “ring” is the battery side of the 2-  
wire telephone circuit.  
Engineering Orderwire (EOW)  
49  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
4 • System Management Access  
To prevent electrical shock, never touch uninsulated wires or terminals when  
the phone line is plugged into the RJ-11 connector of the EOW port (AUX 1).  
WARNING  
Figure 21. Location of signal pins on the EOW port (AUX 1) RJ-11 connector  
The EOW port supports dual-tone multifrequency (DTMF) signaling to identify EOW stations within an  
OnSite OS-10 subnetwork. Each EOW station is identified with a programmable 3-digit station ID number.  
To configure the engineering orderwire (EOW) function, see Figure 16 and follow these steps:  
1. Select the SYSTEM folder from the navigation menu.  
2. From the expanded SYSTEM folder, select Management Access.  
3. From the expanded Management Access folder, select Orderwire.  
Note If you see that the physical connector for the AUX 1 port is present  
but the Orderwire selection does not appear on the folder, check first  
that the system is operating using Release 4.3 or above.  
4. On the Orderwire page, check that the AUX Board shows Installed and that the Operational Status is in-  
service (IS).  
Note If the AUX Board shows Not Installed or the Operational Status is  
out-of-service (OOS), and you see that the physical connector for the  
AUX1 port is present, contact your local systems engineer or regional  
OnSite support center for additional technical information.  
5. On the Orderwire page, set the Station ID for the system.  
Note The Station ID needs to be a unique 3-digit number for each EOW  
station within an OnSite subnetwork. The available range of station  
ID numbers is 001 to 255.  
Engineering Orderwire (EOW)  
50  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
4 • System Management Access  
Note In addition to supporting selective calling of EOW stations using the  
station ID, the EOW also supports a party-line function that allows  
calling and communicating with all EOW stations at once (party-line  
function) by dialing *000.  
6. Set the Channel Byte to E2 (express orderwire byte) if there are SDH regenerators present between the  
STM-1 ports connecting two OnSite OS-10 nodes supporting the EOW function; otherwise, leave the  
default setting as E1 (local orderwire byte).  
7. Set Termination to Termination Point if the EOW station is an OS-10 node in terminal mux configura-  
tion in a point-to-point link or at the end of a linear ADM chain. For OS-10 nodes in ADM configura-  
tion, leave the default setting as Intermediate Point.  
Note For OS-10 nodes in a ring network, one of the nodes must be set to  
Termination Point while the rest of the nodes are set to Intermediate  
Point. This arrangement is necessary to prevent an audio feedback  
loop. Normally, the OS-10 node serving as the master timing node  
for the ring is set to Termination Point.  
8. Click on Apply to complete the configuration of the EOW port.  
Figure 22. Configuring the Engineering Orderwire (EOW) Function  
After the EOW port is configured for operation, you can connect a regular 2-wire touchtone telephone set to  
the RJ-11 connector of the port. To establish a voice call with another EOW station on the same OnSite OS-  
10 subnetwork, take the phone “off-hook”, wait for dial tone, and then dial star (*) followed by the Station ID  
number. For example, to call Station ID number 123, dial *123.  
Note To use the EOW function, all OS-10 nodes in the subnetwork must  
be equipped with the factory-installed AUX board option. The nodes  
must also be configured with a unique station ID number for each  
node.  
Engineering Orderwire (EOW)  
51  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
4 • System Management Access  
At this point, the called station begins to ring if another telephone set is connected to the EOW port of that  
station.  
Note To call and communicate with all EOW stations at once (party-line  
function), dial *000.  
To complete the call, simply place the telephone set in the on-hook position, like a regular analog phone.  
Engineering Orderwire (EOW)  
52  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Chapter 5 Contacting Patton for assistance  
Chapter contents  
Introduction..........................................................................................................................................................54  
Contact information..............................................................................................................................................54  
Warranty Service and Returned Merchandise Authorizations (RMAs)...................................................................54  
Warranty coverage ..........................................................................................................................................54  
Out-of-warranty service .............................................................................................................................54  
Returns for credit ......................................................................................................................................54  
Return for credit policy .............................................................................................................................55  
RMA numbers ................................................................................................................................................55  
Shipping instructions ................................................................................................................................55  
53  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
5 • Contacting Patton for assistance  
Introduction  
This chapter contains the following information:  
“Contact information”—describes how to contact Patton technical support for assistance.  
RAS warranty and obtaining a return merchandise authorization (RMA).  
Contact information  
Patton Electronics offers a wide array of free technical services. If you have questions about any of our other  
products we recommend you begin your search for answers by using our technical knowledge base. Here, we  
have gathered together many of the more commonly asked questions and compiled them into a searchable  
database to help you quickly solve your problems.  
Online support—available at www.patton.com.  
E-mail support—e-mail sent to [email protected] will be answered within 1 business day  
Telephone support—standard telephone support is available Monday through Friday, from 8:00 A.M. to  
5:00 P.M. EST (8:00 to 17:00 UTC-5), Monday through Friday by calling +1 (301) 975-1007  
Warranty Service and Returned Merchandise Authorizations (RMAs)  
Patton Electronics is an ISO-9001 certified manufacturer and our products are carefully tested before ship-  
ment. All of our products are backed by a comprehensive warranty program.  
Note If you purchased your equipment from a Patton Electronics reseller,  
ask your reseller how you should proceed with warranty service. It is  
often more convenient for you to work with your local reseller to  
obtain a replacement. Patton services our products no matter how  
you acquired them.  
Warranty coverage  
Our products are under warranty to be free from defects, and we will, at our option, repair or replace the prod-  
uct should it fail within one year from the first date of shipment. Our warranty is limited to defects in work-  
manship or materials, and does not cover customer damage, lightning or power surge damage, abuse, or  
unauthorized modification.  
Out-of-warranty service  
Patton services what we sell, no matter how you acquired it, including malfunctioning products that are no  
longer under warranty. Our products have a flat fee for repairs. Units damaged by lightning or elephants may  
require replacement.  
Returns for credit  
Customer satisfaction is important to us, therefore any product may be returned with authorization within 30  
days from the shipment date for a full credit of the purchase price. If you have ordered the wrong equipment or  
you are dissatisfied in any way, please contact us to request an RMA number to accept your return. Patton is  
not responsible for equipment returned without a Return Authorization.  
Introduction  
54  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
OnSite Series Getting Started Guide  
5 • Contacting Patton for assistance  
Return for credit policy  
Less than 30 days: No Charge. Your credit will be issued upon receipt and inspection of the equipment.  
30 to 120 days: We will add a 20% restocking charge (crediting your account with 80% of the purchase  
price).  
Over 120 days: Products will be accepted for repairs only.  
RMA numbers  
RMA numbers are required for all product returns. You can obtain an RMA by doing one of the following:  
Completing a request on the RMA Request page in the Support section at www.patton.com  
By calling +1 (301) 975-1000 and speaking to a Technical Support Engineer  
By sending an e-mail to [email protected]  
All returned units must have the RMA number clearly visible on the outside of the shipping container. Please use  
the original packing material that the device came in or pack the unit securely to avoid damage during shipping.  
Shipping instructions  
The RMA number should be clearly visible on the address label. Our shipping address is as follows:  
Patton Electronics Company  
RMA#: xxxx  
7622 Rickenbacker Dr.  
Gaithersburg, MD 20879-4773 USA  
Patton will ship the equipment back to you in the same manner you ship it to us. Patton will pay the return  
shipping costs.  
Warranty Service and Returned Merchandise Authorizations (RMAs)  
55  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
Appendix A Compliance information  
Chapter contents  
Compliance...........................................................................................................................................................57  
EMC ...............................................................................................................................................................57  
Safety ..............................................................................................................................................................57  
Radio and TV Interference....................................................................................................................................57  
FCC Part 68 (ACTA) Statement ...........................................................................................................................57  
Declaration of Conformity ....................................................................................................................................58  
Authorized European Representative .....................................................................................................................58  
56  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
A • Compliance information  
Compliance  
The compliance information in this document is incomplete and subject to change.  
IMPORTANT  
EMC  
EN 55022 Class A  
FCC part 15 Class A  
Safety  
EN 60950  
UL 60950  
Radio and TV Interference  
The OnSite OS-10 Series generates and uses radio frequency energy, and if not installed and used properly-that  
is, in strict accordance with the manufacturer’s instructions-may cause interference to radio and television  
reception. The OnSite OS-10 Series have been tested and found to comply with the limits for a Class A com-  
puting device in accordance with specifications in Subpart B of Part 15 of FCC rules, which are designed to  
provide reasonable protection from such interference in a commercial installation. However, there is no guar-  
antee that interference will not occur in a particular installation. If the OnSite OS-10 Series does cause inter-  
ference to radio or television reception, which can be determined by disconnecting the unit, the user is  
encouraged to try to correct the interference by one or more of the following measures: moving the computing  
equipment away from the receiver, re-orienting the receiving antenna and/or plugging the receiving equipment  
into a different AC outlet (such that the computing equipment and receiver are on different branches).  
FCC Part 68 (ACTA) Statement  
This equipment complies with Part 68 of FCC rules and the requirements adopted by ACTA. On the bottom  
side of this equipment is a label that contains—among other information—a product identifier in the format  
US: AAAEQ##TXXXX. If requested, this number must be provided to the telephone company.  
The method used to connect this equipment to the premises wiring and telephone network must comply with  
the applicable FCC Part 68 rules and requirements adopted by the ACTA.  
If this equipment causes harm to the telephone network, the telephone company will notify you in advance  
that temporary discontinuance of service may be required. But if advance notice isn’t practical, the telephone  
company will notify the customer as soon as possible. Also, you will be advised of your right to file a complaint  
with the FCC if you believe it is necessary.  
The telephone company may make changes in its facilities, equipment, operations or procedures that could  
affect the operation of the equipment. If this happens the telephone company will provide advance notice in  
order for you to make necessary modifications to maintain uninterrupted service.  
Compliance  
57  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
OnSite Series Getting Started Guide  
A • Compliance information  
If trouble is experienced with this equipment, for repair or warranty information, please contact our company.  
If the equipment is causing harm to the telephone network, the telephone company may request that you dis-  
connect the equipment until the problem is resolved.  
Connection to party line service is subject to state tariffs. Contact the state public utility commission, public  
service commission or corporation commission for information.  
Declaration of Conformity  
This equipment conforms to the requirements of Council Directive 1999/5/EC on the approximation of the  
laws of the member states relating to Radio and Telecommunication Terminal Equipment and the mutual rec-  
ognition of their conformity.  
The safety advice in the documentation accompanying this product shall be obeyed. The conformity to the  
above directive is indicated by CE sign on the device.  
The signed Declaration of Conformity can be downloaded at www.patton.com/certifications.  
Authorized European Representative  
D R M Green  
European Compliance Services Limited.  
Oakdene House, Oak Road  
Watchfield, Swindon, Wilts SN6 8TD, UK  
Declaration of Conformity  
58  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Appendix B Specifications  
Chapter contents  
Model OS1052......................................................................................................................................................60  
Trunk Interfaces .............................................................................................................................................60  
Client Interfaces ..............................................................................................................................................60  
Expansion Modules .........................................................................................................................................60  
Configuration & Port Capacity for 2 Expansion Slots .....................................................................................60  
Protection .......................................................................................................................................................60  
Bandwidth Connectivity and Provisioning ......................................................................................................60  
Timing & Synchronization .............................................................................................................................60  
System Access .................................................................................................................................................60  
Operations ......................................................................................................................................................61  
Management ...................................................................................................................................................61  
Packet Intelligence ..........................................................................................................................................61  
Dimensions .....................................................................................................................................................61  
Weight ............................................................................................................................................................61  
Cooling ...........................................................................................................................................................61  
Mounting .......................................................................................................................................................61  
Power ..............................................................................................................................................................61  
Environment ...................................................................................................................................................61  
Model OS1063......................................................................................................................................................62  
Trunk Interfaces .............................................................................................................................................62  
Client Interfaces ..............................................................................................................................................62  
Expansion Modules .........................................................................................................................................62  
Configuration & Port Capacity for 2 Expansion Slots .....................................................................................62  
Protection .......................................................................................................................................................62  
Bandwidth Connectivity and Provisioning ......................................................................................................62  
Timing & Synchronization .............................................................................................................................62  
System Access .................................................................................................................................................62  
Operations ......................................................................................................................................................63  
Management ...................................................................................................................................................63  
Packet Intelligence ..........................................................................................................................................63  
Dimensions .....................................................................................................................................................63  
Weight ............................................................................................................................................................63  
Cooling ...........................................................................................................................................................63  
Mounting .......................................................................................................................................................63  
Power ..............................................................................................................................................................63  
Environment ...................................................................................................................................................63  
59  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
B • Specifications  
Model OS1052  
Trunk Interfaces  
STM-1: G.707, G.783  
Optics: G.957 S-1.1, L-1.1 and L-1.2 options  
Client Interfaces  
E1: G.703, 75-ohm and 120-ohm options  
T1: G.703, 100-ohm  
Ethernet 10/100Base-TX: 802.3u  
Expansion Modules  
SDH: STM-1 optical (2 ports) • STM-1 electrical (2 ports)  
PDH: E1 (21 ports) • E3/DS3 (3 ports)  
Packet Data: 10/100Base-TX (8 ports)  
Configuration & Port Capacity for 2 Expansion Slots  
STM-1: Base: 2 • Max: 6  
E1: Base: 8 • Max: 50  
E3/DS3: Base: – • Max: 6  
10/100Base-TX: Base: 2 • Max: 18  
Protection  
Linear MSP 1+1 • SNCP/I and SNCP/N  
Bandwidth Connectivity and Provisioning  
Connectivity: VC-12, VC-3 levels  
One-way, two-way, drop-and-continue and multicast connections  
VCAT: VC-12-Xv and VC-3-Xv  
LCAS: G.7042  
Packet encapsulation: GFP-F (G.7041)  
Timing & Synchronization  
Internal: Stratum 3 clock  
Line timing: STM-1 and E1/T1  
External timing: Dual Sync In/Out ports at 2 or 1.5 Mbps/MHz  
SSM support: G.781  
System Access  
Serial RS-232 and Ethernet LAN management ports  
IP over DCCr and DCCm options  
IP over E1 signal mapped into selected VC-12 channel  
DCC transparency (any subset of DCC rows)  
Telnet  
Model OS1052  
60  
Download from Www.Somanuals.com. All Manuals Search And Download.  
                 
OnSite Series Getting Started Guide  
B • Specifications  
Operations  
Local and remote software download and upgrade (FTP/TFTP)  
Loopbacks: facility and terminal  
ALS (automatic laser shutdown): G.958  
Alarm Contacts (optional)  
Orderwire: 2-wire interface using E1 or E2 byte (optional)  
Management  
Web-based GUI management interface  
XML  
SNMP v1/v2  
Packet Intelligence  
Ethernet MAC: 802.3  
VLAN: 802.1Q and Q-in-Q  
Service provider VLAN (SP-VLAN) using S-Tag: 802.1ad  
Tagging operations: C-Tag and S-Tag add/strip  
Flow Control: 802.3x  
Rate Limiting: Sustained and peak rates with 64 kbit/s granularity for ports and VLANs  
QoS: 4 levels with strict priority, WFQ and WRED support  
Dimensions  
1.75H x 17.25W x 11.54D in.  
(44.45H x 438.2W x 293D mm)  
1RU  
Weight  
11 lbs (5 kg)  
Cooling  
Natural convection cooling (no fans)  
Mounting  
19-inch EIA/TIA or ETSI 300 mm racks, or desktop and wall-mounting options  
Power  
AC input: 100 to 245 V at 50 to 60 Hz  
DC input: -36 to -72 V (-48V nominal), dual inputs  
Consumption: 60 W maximum  
Environment  
Temperature: 0 to +50°C (+32 to +122°F)  
Humidity: 5 to 95%, non-condensing  
Model OS1052  
61  
Download from Www.Somanuals.com. All Manuals Search And Download.  
                 
OnSite Series Getting Started Guide  
B • Specifications  
Model OS1063  
Trunk Interfaces  
STM-1: G.707, G.783  
Optics: G.957 S-1.1, L-1.1 and L-1.2 options  
Client Interfaces  
E1: G.703, 75-ohm and 120-ohm options  
T1: G.703, 100-ohm  
Ethernet 10/100Base-TX: 802.3u  
Expansion Modules  
SDH: STM-1 optical (2 ports) • STM-1 electrical (2 ports)  
PDH: E1 (21 ports) • E3/DS3 (3 ports)  
Packet Data: 10/100Base-TX (8 ports)  
Configuration & Port Capacity for 2 Expansion Slots  
STM-1: Base: 2 • Max: 6  
E1: Base: 21 • Max: 63  
E3/DS3: Base: – • Max: 6  
10/100Base-TX: Base: – • Max: 18  
Protection  
Linear MSP 1+1 • SNCP/I and SNCP/N  
Bandwidth Connectivity and Provisioning  
Connectivity: VC-12, VC-3 levels  
One-way, two-way, drop-and-continue and multicast connections  
VCAT: VC-12-Xv and VC-3-Xv  
LCAS: G.7042  
Packet encapsulation: GFP-F (G.7041)  
Timing & Synchronization  
Internal: Stratum 3 clock  
Line timing: STM-1 and E1/T1  
External timing: Dual Sync In/Out ports at 2 or 1.5 Mbps/MHz  
SSM support: G.781  
System Access  
Serial RS-232 and Ethernet LAN management ports  
IP over DCCr and DCCm options  
IP over E1 signal mapped into selected VC-12 channel  
DCC transparency (any subset of DCC rows)  
Telnet  
Model OS1063  
62  
Download from Www.Somanuals.com. All Manuals Search And Download.  
                 
OnSite Series Getting Started Guide  
B • Specifications  
Operations  
Local and remote software download and upgrade (FTP/TFTP)  
Loopbacks: facility and terminal  
ALS (automatic laser shutdown): G.958  
Alarm Contacts (optional)  
Orderwire: 2-wire interface using E1 or E2 byte (optional)  
Management  
Web-based GUI management interface  
XML  
SNMP v1/v2  
Packet Intelligence  
Ethernet MAC: 802.3  
VLAN: 802.1Q and Q-in-Q  
Service provider VLAN (SP-VLAN) using S-Tag: 802.1ad  
Tagging operations: C-Tag and S-Tag add/strip  
Flow Control: 802.3x  
Rate Limiting: Sustained and peak rates with 64 kbit/s granularity for ports and VLANs  
QoS: 4 levels with strict priority, WFQ and WRED support  
Dimensions  
1.75H x 17.25W x 11.54D in.  
(44.45H x 438.2W x 293D mm)  
1RU  
Weight  
11 lbs (5 kg)  
Cooling  
Natural convection cooling (no fans)  
Mounting  
19-inch EIA/TIA or ETSI 300 mm racks, or desktop and wall-mounting options  
Power  
AC input: 100 to 245 V at 50 to 60 Hz  
DC input: -36 to -72 V (-48V nominal), dual inputs  
Consumption: 60 W maximum  
Environment  
Temperature: 0 to +50°C (+32 to +122°F)  
Humidity: 5 to 95%, non-condensing  
Model OS1063  
63  
Download from Www.Somanuals.com. All Manuals Search And Download.  
                 
Appendix C Terms and Acronyms  
Chapter contents  
Abbreviations.........................................................................................................................................................65  
64  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
OnSite Series Getting Started Guide  
C • Terms and Acronyms  
Abbreviations  
Abbreviation  
Meaning  
A
AIS  
AMI  
AU  
AUX  
B
Alarm Indication Signal  
Alternate Mark Inversion  
Administrative Unit  
Auxiliary (port)  
BIP  
Bit Interleaved Parity  
Background Block Error  
Bit Error Rate  
Bipolar Violation  
Bipolar with 3-zero Substitution  
Bipolar with 8-zero Substitution  
BBE  
BER  
BPV  
B3ZS  
B8ZS  
C
cHEC  
CLI  
core Header Error Check  
Command Line Interface  
CSU/DSU  
C-Tag  
D
Channel Service Unit/Data Service Unit  
Customer-assigned tag (for example, VLAN tag)  
DNU  
E
Do Not Use (for synchronization)  
E1  
EB  
European digital signal hierarchy level 1  
Errored Block  
EDC  
EIA  
EOW  
ES  
Error Detection Code  
Electronics Industries Alliance  
Engineering Orderwire  
Errored Second  
ETSI  
EXM  
EXZ  
G
European Telecommunications Standards Institute  
Extension Header Mismatch  
Excessive Zeros  
GFP  
H
Generic Framing Procedure  
HDB3  
HP  
High-Density Bipolar with 3-zero Substitution  
High-order Path  
HTTP  
I
Hyper Text Transfer Protocol  
IP  
Internet Protocol  
Abbreviations  
65  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
OnSite Series Getting Started Guide  
C • Terms and Acronyms  
Abbreviation  
Meaning  
Link Capacity Adjustment Scheme  
L
LCAS  
LFD  
LOF  
LOP  
LP  
Loss of Frame Delineation  
Loss of Frame  
Loss of Pointer  
Low-order Path  
M
MS  
Multiplex Section  
N
NEBS  
NEC  
P
Network Equipment Building System  
National Electric Code  
PBX  
PC  
Private Branch Exchange  
Personal Computer  
PDH  
PJC  
PM  
POST  
ppm  
PRC  
PRI  
PSC  
PSD  
R
Plesiochronous Digital Hierarchy  
Pointer Justification Count  
Performance Monitoring  
Power-On Self-Test  
parts per million  
Primary Reference Clock  
Primary Rate Interface  
Protection Switching Count  
Protection Switching Duration  
RS  
Regenerator Section  
RSOH  
RU  
Regenerator Section Overhead  
Rack Unit (1.75 inches)  
S
SD  
Signal Degrade  
SDH  
SEC  
SES  
SF  
Synchronous Digital Hierarchy  
Secondary source (also Synchronous Equipment Clock)  
Severely Errored Second  
Signal Failure  
SNMP  
SOH  
SSM  
SSU  
S-Tag  
STM-1  
Simple Network Management Protocol  
Section Overhead  
Synchronization Status Messaging  
Synchronization Supply Unit  
Service provider tag  
Synchronous Transport Module level 1  
Abbreviations  
66  
Download from Www.Somanuals.com. All Manuals Search And Download.  
OnSite Series Getting Started Guide  
C • Terms and Acronyms  
Abbreviation  
Meaning  
T
TDM  
TIA  
TIM  
TNV  
TP  
Time Division Multiplexing  
Telecommunications Industry Association  
Trace Identifier Mismatch  
Telecommunications Network Voltage  
Termination Point  
TU  
Tributary Unit  
TUG  
U
Tributary Unit Group  
UAS  
Unavailable Seconds  
Abbreviations  
67  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Mr Coffee Coffeemaker UR12 User Manual
Mr Heater Fan MH42T User Manual
Nortel Networks Answering Machine P0886634 User Manual
Oki Printer Accessories C5150 User Manual
Omnimount TV Video Accessories G353 User Manual
Palsonic Flat Panel Television PDP4200 User Manual
Panasonic Cell Phone EB VS2 User Manual
Panasonic Switch 1200N User Manual
Panasonic Vacuum Cleaner MC CG467 User Manual
ParaBody Home Gym 454 User Manual