Johnson Controls Film Camera R 22 S1 1TVM2 User Manual

ACCESSORY KIT INSTALLATION MANUAL  
THERMAL EXPANSION VALVE KITS  
R-22 – S1-1TVM2**, 1TVM7** & R-410A – S1-1TVM4**, S1-1TVM9**  
FOR MODELS:  
COILS - FC, MC, PC, UC, HD, HC, G4FA, G4FD & AIR HANDLERS - AH, AV, & F*FP  
5. Install the liquid line to the top of the thermal expansion  
GENERAL INFORMATION  
valve with fitting supplied with the liquid line. Hand modify  
the liquid line to align with casing opening. Hand tighten  
the liquid line and an additional 1/4 turn to seal.  
This thermal expansion valve (with internal check valve) is to be  
used with flex coils for models listed above. This kit is required  
to provide overall rated system performance improvement. The  
kit can be applied to the listed indoor coils and air handlers,  
both for heat pump and cooling applications.  
6. Install the TXV equalizer line into the vapor line as follows:  
a. Hand tighten the 1/4” SAE nut to the schraeder fitting  
and an additional 1/3 turn to seal.  
The kit consists of a bolt-on thermal expansion valve, 2.5 feet of  
thermal insulation, bulb straps or bulb clamp and this instruc-  
tion.  
7. Install the TXV bulb to the vapor line near the equalizer  
line, using the bulb clamp(s) furnished with the TXV  
assembly. Ensure the bulb is making maximum contact.  
See Figure 2 for proper bulb location. See Figure 3 for  
clamp assembly on 1TVM valve.  
When a TXV kit is installed, a hard start kit may be required.  
Consult your product data sheet.  
Refer to Tabular Data sheet for specific model TXV/match-up.  
a. Bulb should be installed on a horizontal run of the  
vapor line if possible. The bulb should be installed on  
top of the line.  
• 1TVM2, 1TVM7 series TXV kits are R-22 AC and HP.  
• 1TVM4, 1TVM9 series TXV kits are for R-410A AC and HP.  
INSTALLATION  
To install the thermal expansion valve, use the following steps.  
The coil will have to be pulled out of the casing for easy access.  
b. If bulb installation is made on a vertical run, the bulb  
should be located at least 16 inches from any bend,  
and on the tubing sides opposite the plane of the  
bend. The bulb should be positioned with the bulb tail  
at the top, so that the bulb acts as a reservoir.  
1. Relieve the holding charge by pulling off the rubber cap  
plug on the suction manifold line of the coil.  
c. Bulb should be insulated using thermal insulation pro-  
vided to protect it from the effect of the surrounding  
ambient temperature. Cover completely to insulate  
from air-stream.  
ID coil is under 30 psig pressure.  
8. Slide the coil in the cabinet and install the tubing connect  
plate. Soak the heat shield in water and slide it in place  
using the suction and liquid line holes provided.  
2. After holding charge is completely discharged, loosen and  
remove the schraeder cap seal.  
3. Loosen and remove distributor cap seal.  
9. Align the suction and liquid line sets to the suction and liq-  
uid tubing and wrap the liquid and suction tubing with wet  
rag before brazing.  
4. Install the thermal expansion valve to the orifice distributor  
assembly with supplied fittings. Orient the TXV as shown in  
Figure 1. Hand tighten and turn an additional  
1/4 turn to seal. Do not overtighten fittings.  
Dry nitrogen should always be supplied through the  
tubing while it is being brazed, because the tempera-  
ture is high enough to cause oxidation of the copper  
unless an inert atmosphere is provided. The flow of  
dry nitrogen should continue until the joint has cooled.  
Always use a pressure regulator and safety valve to  
insure that only low pressure dry nitrogen is introduced  
into the tubing. Only a small flow is necessary to dis-  
place air and prevent oxidation.  
VAPOR  
LINE  
THERMAL  
EXPANSION  
VALVE BULB  
(Cover completely  
with insulation  
provided)  
LIQUID  
LINE  
THERMAL  
EXPANSION  
VALVE  
All connections to be brazed are copper-to-copper and should  
be brazed with a phosphorous-copper alloy material such as  
Silfos-5 or equivalent. DO NOT use soft solder.  
TXV  
EQUALIZER  
LINE  
Nitrogen can be introduced through the Schraeder access  
(located at the OD unit connection of the refrigerant line). The  
Schraeder core can be removed before connecting the source  
of nitrogen, but should be reinstalled prior to the evacuation and  
charging of the refrigerant lines and ID coil.  
DISTRIBUTOR  
BODY  
FIGURE 1: Kit Installation in System  
Johnson Controls Unitary Products  
166806-UAI-H-0408  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Ingersoll Rand Water Pump PD10X X X User Manual
Jabra Bluetooth Headset HALO2 User Manual
Jensen MP3 Player SMP 2GBL User Manual
Jet Tools Dust Collector DC 1100C User Manual
JVC Car Speaker KD A95BT User Manual
JVC DVD Player XV 501BK User Manual
JVC Flat Panel Television GR DVP5 User Manual
Kenwood GPS Receiver DNX710EX User Manual
Konica Minolta All in One Printer 2430 DL User Manual
Konica Minolta Digital Camera LEXIO115 User Manual