Bunn Beverage Dispenser AF PR 3 User Manual

®
AF PR-2  
AF PR-3  
BUNN  
AFPR-3 VERSION DISCONTINUED  
The information in this manual  
is no longer current.  
OPERATING & SERVICE MANUAL  
BUNN-O-MATIC CORPORATION  
POST OFFICE BOX 3227  
SPRINGFIELD, ILLINOIS 62708-3227  
PHONE: (217) 529-6601 FAX: (217) 529-6644  
28791.0001B 1/00 ©1998 Bunn-O-Matic Corporation  
INITIAL SET-UP  
NOTE: This refill unit should not be used to initially fill the hopper. Running the motor for extended periods will  
trip the thermal switch. The thermal switch will reset, but requires up to 30 minutes of cooling time.  
NOTE: Hoses, clamps and product container connectors are not supplied. Fittings and labels are supplied. Make  
hose assemblies as required.  
1. Assemble hoppers with probe housing assemblies to CDS-2, CDS-3 or modify existing hoppers using tem-  
plate provided.  
2. Make sure probe housing assembly is pushed down into slots on back of hoppers.  
3. Install cable assembly to the lower right front of the auto refill box and the probe housing assemblies on the  
hoppers. The connectors on the cable pushes in and cap rotates 1/4 turn to lock into position.  
4. Run output tubes from auto refill box to the quick disconnects in the hoppers.  
NOTE: Make sure numbers on the labels match up. Cable#1 with Hose#1, Cable#2 with Hose#2...ect.  
5. Connect one end of input hoses to the auto refill box and the other end to the product container. Product  
container connectors (BIB) are not supplied. Install your own interface.  
NOTE: Make sure all connections are made before connecting the auto refill box to the power source.  
6. Each product container has an ON/OFF refill switch located on the front of the auto refill box. A second switch  
for each hopper is at the probe housing assembly. These are 3 position switches, high level, low level and a  
center “OFF” position.  
7. Place the main ON/OFF switch and ON/OFF refill switches in the “OFF” position.  
8. Make sure all hoses are connected. Connect the dispenser to the power source and place the main ON/OFF  
switch in the “ON” position.  
9. Place one of the ON/OFF refill switches in the “ON” position, after a four second delay product will begin to  
flow through the hoses into the hopper. Be sure the switch selected is filling the correct hopper, if not, check  
the labels. See NOTE in step #4.  
10. To test refill circuit short out probes on one of the hoppers with a screwdriver, that hopper should shut off,  
remove the screwdriver and the hopper will start to fill again after a four second delay. If hopper does not  
start to fill, check labels, refer to NOTE in step #4.  
ELECTRICAL REQUIREMENTS  
CAUTION - The dispenser must be disconnected from the power source until specified in Initial Set-Up.  
The 120 volt version of this dispenser has an attached cordset and requires 2-wire, grounded service rated 120  
volts ac, 15 amp, single phase, 60 Hz. The mating connector must be a NEMA 5-15R.  
The 200 volt or 240 volt versions require 2 wire, grounded service rated 200 volts ac or 240 volts ac, single  
phase, 50 Hz.  
(Refer to the dispenser’s data plate for exact voltage requirement.)  
ELECTRICAL HOOk-UP  
CAUTION – Improper electrical installation will damage electronic components.  
1. An electrician must provide electrical service as specified.  
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.  
3. Connect the dispenser to the power source.  
28791.1 011500  
3
CLEANING  
RECOMMENDED WEEkLY CLEANING:  
This should be done in conjunction with the recommended weekly cleaning of your CDS-2 or CDS-3 machine. The  
CDS Hoppers must be empty before starting.  
1. Prepare a 1 gallon cleaning solution consisting of 1 gallon of hot water and a sanitizing cleaner which contains  
3-5% chlorine based sanitizer. Mix per manufacturers instructions  
2. Remove connectors from each concentrate container and place them directly into the cleaning solution.  
3. Energize each refill station and allow the cleaning solution to pump through the system into the hoppers. The  
cleaning procedure should remove the color stains from the tubing. If not, prepare another gallon of cleaning  
solution and repeat.  
4. After the cleaning solution has been pumped into the hoppers, rinse the cleaning solution container with hot  
water.  
5. Fill the cleaning solution container with hot water. Energize each refill station and rinse thoroughly. The amount  
of clean hot rinse water should equal the amount of cleaning solution pumped through the system.  
6. Empty the hoppers of your CDS machine and follow the recommended cleaning instructions.  
NOTE: The hoses should be checked monthly for deterioration, cracks and possible discoloration from some  
concentrates. Replace the tubing when necessary.  
TROUBLESHOOTING  
A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems  
encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic  
Technical Service Department.  
Inspection, testing, and repair of electrical equipment should be performed only by qualified service person-  
nel.  
All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of  
terminals or the application of external voltages may result in board failure.  
Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If  
an intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a  
terminal or crimp.  
Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are  
energized for more than ten minutes without a supply of water.  
The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will  
help to avoid twists and kinks in the tubing.  
Make certain that all plumbing connections are sealed and electrical connections tight and isolated.  
Keep away from combustibles.  
WARNING – • Exercise extreme caution when servicing electrical equipment.  
• Unplug the dispenser when servicing, except when electrical tests are specified.  
• Follow recommended service procedures  
• Replace all protective shields or safety notices  
28791.1 011500  
4
OPERATING CONTROLS  
B
A
P2052  
A. MAIN POWER ON/OFF  
The main power ON/OFF switch is located on the right of the front panel just above the power cord.  
B. REFILL CIRCUIT ON/OFF  
The refill circuit ON/OFF switches are located on the right of the front panel just above the main power switch.  
These allow each circuit to operate independently of the other.  
C. PROBE CONTROL BOX LOW/OFF/HIGH  
On models equipped with a dual level probe, there is a  
LOW/OFF/HIGH switch located at the probe control box  
on the hopper. The “OFF” position allows the operator  
to disable the probe for that hopper only. THE “LOW”  
and “HIGH” positions allow the operator to select the  
level of product desired for that hopper.  
C
P1951  
28791.1 011500  
5
TROUBLESHOOTING (cont.)  
PROBLEM  
PROBABLE CAUSE  
REMEDY  
1. Empty product container  
Replace or refill  
Product will not dispense  
2. No power or incorrect voltage to (A1) Check the outlet for 120 volts  
the dispenser  
on two wire 120 volt dispenser.  
(A2) Check the outlet for 200 volts  
or 240 volts ac for two wire 200 volt  
or 240 volt dispensers.  
(B) Check circuit breakers or fuses.  
Signal cable must be plugged in.  
3. Signal cable unplugged  
4. Hopper is full  
Productmustnotbetouchingprobes  
to fill.  
5. Fuse and fuse holder  
6. Main ON/OFF switch  
Refer to Service - Fuse and Fuse  
Holder for test procedures. See  
page 8  
Refer to Service - Main ON/OFF  
Switch for testing procedure. See  
page 9  
7.ProbeboxLOW/OFF/HIGHswitch- Refer to Service - Probe System.  
es  
See page 10  
8. Circuit board  
Refer to Service - Circuit Board for  
testing procedures. See page 7  
9. Vacuum switches  
Refer to Service - Vacuum Switches  
for testing procedures. See page 14  
10. Vacuum/Supply pump  
Refer to Service - Vacuum/ Supply  
Pump for testing procedures. See  
page 12  
1. Motor over heats  
The thermal switch will reset, but  
requires up to 30 minutes of cooling  
time. See NOTE below.  
Motor thermal cutout (motor stops  
running)  
NOTE: This refill unit should not be used to initially fill the hopper. Running the motor for extended periods will  
trip the thermal switch. The thermal switch will reset, but requires up to 30 minutes of cooling time.  
28791.1 011500  
6
SERVICE  
This section provides procedures for testing  
and replacing various major components used in this  
dispenser should service become necessary. Refer  
to Troubleshooting for assistance in determining the  
cause of any problem.  
WARNING - Inspection, testing, and repair of electri-  
cal equipment should be performed only by qualified  
servicepersonnel. Thedispensershouldbeunplugged  
when servicing, except when electrical tests are re-  
quired and the test procedure specifically states to  
plug-in the dispenser.  
COMPONENT ACCESS  
WARNING - Disconnect the dispenser from the power  
source before the removal of any panel or the replace-  
ment of any component.  
P1561  
FIG. 1 COMPONENT ACCESS  
All components are accessible by removing the  
eight #8-32 screws (five on the front and three on the  
rear) securing the main housing to the main mounting  
panel. Refer to Fig. 1  
Refer to the contents listing for component loca-  
tion.  
Contents  
Circuit Board...........................................................8  
Fuse & Fuse Holder.................................................9  
Main ON/OFF Switch.............................................10  
Probe LOW/OFF/HIGH Switches............................11  
Refill ON/OFF Switches ........................................ 12  
Vacuum/Supply Pump Assembly..........................13  
Vacuum/Supply Pump Tubing Installation ............14  
Vacuum Switches .................................................15  
Wiring Diagrams..............................................16,17  
28791.1 011500  
7
SERVICE  
CIRCUIT BOARD  
Removal and Replacement:  
1. Disconnect the ten pin plug from the main wiring  
harness to the circuit board.  
2. Removethesix#4-40screwsandspacerssecuring  
thecircuitboardtothesolenoidmountingbracket.  
Remove circuit board and discard.  
3. Install new circuit board using #4-40 screws and  
spacers to secure the circuit board to the vacuum  
switch mounting bracket. The spacers must be  
between the solenoid mounting bracket and the  
circuit board.  
OF  
N
O
OF  
N
O
OF  
N
4. Refer to Fig. 3 for circuit board ten pin connector.  
O
P1556  
FIG. 2 CIRCUIT BOARD  
Location:  
The circuit board is located inside the autofill  
box, mounted on the right side of the vacuum switch  
mounting.  
Test Procedure:  
P1528  
1. Disconnect the dispenser from the power source.  
2. Disconnect the ten pin plug on the main wiring  
harness from the connector on the circuit board.  
3. Check the voltage across the black wire(#3) and  
the white wire (#6) with a voltmeter. Connect the  
dispenser to the power source. The indication  
must be:  
FIG. 3 CIRCUIT BOARD CONNECTOR LOCATION  
a) 120 volts ac for two wire 120 volt models.  
b) 200 to 240 volts ac for two wire 200 or 240  
volt models.  
If voltage is present as described, replace the circuit  
board.  
If voltage is not present as described, refer to the  
wiring diagrams and check the main wiring harness.  
28791.1 011500  
8
SERVICE  
FUSE AND FUSE HOLDER  
Removal and Replacement:  
Fuse:  
1. Remove the cap from the fuse holder.  
2. Removefusefromthefuseholder,inspect,ifblown  
discard.  
3. Install new 10 amp fuse in the fuse holder.  
4. Reinstall fuse holder cap.  
Fuse Holder:  
1. Disconnect the wires from the rear of the fuse  
holder.  
2. Remove the nut securing the fuse holder to the  
front of the main mounting panel.  
3. Push the fuse holder through the hole in the panel.  
4. Install new fuse holder and fuse through the hole  
in the panel.  
5. Secure the fuse holder to the panel.  
6. Refer to Fig 5 and reconnect the wires.  
P1561  
FIG. 4 FUSE HOLDER  
Location:  
The fuse holder is located on the lower right  
front of the autofill box just to the left of the power  
cord.  
Test Procedure:  
BLK from Main  
Wiring Harness  
1. Disconnect the dispenser from the power source.  
2. Remove cap and fuse from fuse holder.  
3. Remove fuse from the cap.  
4. Check for continuity through the fuse.  
If continuity is present as described, reinstall the fuse,  
the fuse is operating properly.  
If continuity is not present as described, replace the  
fuse.  
BLK to Main  
ON/OFF Switch  
P1331  
FIG. 5 FUSE HOLDER TERMINALS  
28791.1 011500  
9
SERVICE (cont.)  
MAIN ON/OFF SWITCH  
If voltage is present as described, proceed to #5.  
If voltage is not present as described, refer to the wir-  
ing diagrams and check the dispenser wiring harness.  
5. Check for continuity across the switch terminals  
with the switch in the “ON” position. Continuity  
must not be present when the switch is in the  
“OFF” position.  
If continuity is present as described, reconnect the  
wires to the switch terminals.  
If continuity is not present as described, replace the  
switch.  
P1561  
FIG. 6 MAIN ON/OFF SWITCH  
Removal and Replacement::  
1. Remove the wires from the switch terminals.  
2. Compress the clips inside the autofill box and  
gently push the switch through the opening  
3. Push the new switch into the opening and spread  
the clips to hold switch in the autofill box.  
4. Refer to Fig 7 when reconnecting the wires.  
Location:  
The main ON/OFF switch is located on the  
lower right front of the autofill box just above the  
power cord.  
Test Procedure:  
BLK from Fuse Holder  
1. Disconnect the dispenser from the power source.  
2. Disconnect the black wire from the fuse holder  
to the main ON/OFF switch. Disconnect the white  
wire from pump #1.  
3. Check for voltage across the black wires removed  
from the switch and the white wire removed from  
pump #1. Connect the dispenser to the power  
source. The indication must be:  
BLK to Pump Switch #2  
a) 120 volts ac for 2 wire 120 volt models.  
b) 200 to 240 volts ac for two wire 200 or 240 volt  
models.  
P1522  
FIG. 7 MAIN ON/OFF SWITCH TERMINALS  
4. Disconnect the dispenser from the power source.  
28791.1 011500  
10  
SERVICE (cont.)  
PROBE SYSTEM  
Probe Boxes:  
1. Disconnect the signal cable from the probe boxes.  
2. Remove probe box from CDS hopper.  
3. Place the switch on the probe box in the “HIGH”  
position.  
4. Check the resistance across the box cable pins,  
see Fig. 8B.  
AFPR-2 & 3  
P1539  
FIG. 8B PROBE BOX CABLE PINS  
5. With the probe box switch in the “LOW” position  
check the ohms across the pins, refer to Fig. 8B.  
6. If readings match the values indicated the probe  
system electrically is functioning properly.  
P1523  
FIG. 8 PROBE SWITCHES  
Location  
The probe switches are located on the rear of  
each hopper, mounted in the probe housing cover.  
Switch Removal and Replacement:  
1. Remove the #6 thread cutting screw securing the  
probe housing cover to the probe housing.  
2. Remove the wires from the switch terminals.  
3. Compresstheclipsinsidetheprobeboxandgently  
push the switch through the opening  
4. Push the new switch into the opening and spread  
the clips to hold switch in the autofill box.  
5. Refer to Fig 9 when reconnecting the wires.  
Test Procedure  
Probe System  
1. Disconnect the dispenser from the power source.  
2. With the probe boxes connected to the signal  
cable, remove connector from refill box.  
3. Place the switch on the probe box in the “HIGH”  
position.  
4. Check resistance across pins as shown in Fig 8A.  
5. With the probe box switch in “LOW” position  
check the ohms across the signal cable pins, see  
Fig. 8A.  
BLU (HIGH) fromProbe  
Box Cable  
6. If readings match values indicated the probe  
system electrically is functioning properly. If not  
check the probe boxes.  
GRN (OFF) from Probe  
Box Cable  
TAN (LOW) from Probe Box  
Cable  
P1540  
FIG. 9 PROBE LOW/OFF/HIGH SWITCH TER-  
MINALS  
AFPR-3  
AFPR-2  
P1538  
FIG. 8A SIGNAL CABLE PINS  
28791.1 011500  
11  
SERVICE (cont.)  
wires to the switch terminals.  
REFILL SWITCHES  
If continuity is not present as described, replace the  
switch.  
Removal and Replacement:  
1. Remove the wires from the switch terminals.  
2. Compress the clips inside the autofill box and  
gently push the switch through the opening in the  
front of autofill box.  
3. Push the new switch into the opening and spread  
the clips to hold switch in the autofill box.  
4. Refer to Fig 13 when reconnecting the wires.  
#1 AFPR-2 & 3  
P1561  
FIG. 12 REFILL SWITCHES  
RED/BLK from Test/  
Operate Switch  
RED/BLK to Vacuum  
Switch #1  
Location:  
The refill switches are located on the upper  
right front of the autofill box.  
Test Procedures:  
1. Disconnect the dispenser from the power source.  
2. Disconnect thetwowhite/red,brown/blackorred/  
black wires from the switch terminals.  
3. Check for voltage across the white/red, brown/  
black or red black wires from the test/operate  
switch and the white wire on solenoid #2 or #3.  
Connect the dispenser to the power source. The  
indication must be:  
#2 AFPR-2 & 3  
BRN/BLK from Test/  
Operate Switch  
BRN/BLK to Vacuum  
Switch #2  
a) 120 volts ac for two wire 120 volt models  
b) 200 to 240 volts ac for two wire 200 or 240  
volt models.  
#3 AFPR-3 ONLY  
4. Disconnect the dispenser from the power source.  
WHI/RED from Test/  
Operate Switch  
WHI/RED to Vacuum  
Switch #3  
If voltage is present as described, proceed to #5.  
If voltage is not present as described, refer to the wir-  
ing diagrams and check the dispenser wiring harness.  
5. Check for continuity across the switch terminals  
with the switch in the “ON” position. Continuity  
must not be present when the switch is in the  
“OFF” position.  
P1522  
FIG. 13 REFILL SWITCH TERMINALS  
If continuity is present as described, reconnect the  
28791.1 011500  
12  
SERVICE (cont.)  
VACUUM/SUPPLY PUMP ASSEMBLY  
a) 120 volts ac for two wire 120 volt models.  
b) 200 to 240 volts ac for two wire 200 or 240 volt  
models.  
If voltage is present as described, replace the pump.  
If voltage is not present as described, refer to the  
wiring diagrams and check the main wiring harness.  
Pump Removal and Replacement:  
1. Disconnect the wires from the pump leads.  
2. Disconnect the input and output tubes.  
3. Removethefourthumbscrewssecuringthepump  
head to the pump body, discard pump head with  
tubes.  
4. Remove the two #8-32 keps nuts securing the  
pump to the main mounting panel.  
5. Remove the two #6-32 screws securing the pump  
body to the mounting bracket.  
6. Remove pump body and discard.  
7. Installnewpumpassemblyonthepumpmounting  
bracket and secure with two #6-32 screws.  
8. Remove the four thumb screws securing the new  
pump head with hoses to the new pump body.  
9. Using two #6-32 screws mount the pump body  
on the pump mounting bracket.  
10. Using two #8-32 keps nuts mount the pump body  
and bracket to main panel.  
11. Installnewpumpheadwithhosestotherearofthe  
pump body and secure with four thumb screws.  
12. Connect the input and output tubes using new  
hose clamps.  
P1560  
FIG. 16 VACUUM/SUPPLY PUMP ASSEMBLY  
Location:  
The vacuum/supply pumps are located inside  
the autofill box.  
Test Procedure:  
1. Disconnect the dispenser from the power source.  
2. Disconnect the white wire from the pump lead and  
the yellow, orange or red wire from the other lead.  
3. Checkthevoltageacrossthewhitewireandyellow,  
orange or red wire with a voltmeter. Connect the  
dispenser to the power source. Push the pump  
(flavor) switch for the pump to be tested. The  
indication must be :  
13. Refer to Fig 17 and reconnect the wires.  
WHI from Main Harness  
YEL from Pump Switch #1  
WHI from Pump #1  
ORN from Pump Switch #2  
WHI from Pump #2  
RED from Pump Switch #3  
P1526  
FIG. 17 VACUUM/SUPPLY PUMP TERMINALS  
28791.1 011500  
13  
SERVICE (cont.)  
VACUUM/SUPPLY PUMP TUBE INSTALLATION  
1. Separate the pump head from the pump body.  
Hold pump head as shown in Fig. 18, with roller  
in the 2, 6 10 o’clock positions.  
2. Wrap tubing around rollers and hold as shown in  
Fig. 18.  
3. Insert the slot of the tubing key (supplied), as  
shown in Fig. 18 on the rotor so the bottom edge  
of the key is pressing the tubing into the pump  
head cavity.  
ROLLERS  
PUMP  
HEAD  
4. Push down and turn the key counterclockwise to  
guide the tubing deep into the pump head cavity  
as shown in Fig. 19.  
TUBING  
KEY  
5. Hold the tubing and rotor in the pump head and  
remove key carefully.  
EXIT  
PORT  
ENTRY  
PORT  
6. Place pump body on the rotor shaft.  
7. Squeeze the pump body and pump head together  
simultaneously until pump body and pump head  
are touching on all sides. Be careful not to pinch  
the tubing between the pump body and the pump  
head.  
P1542  
FIG. 18 TUBING START POSITION  
ROTOR  
ROTOR  
SHAFT  
P1541  
FIG. 19 TUBING LOADED  
28791.1 011500  
14  
SERVICE (cont.)  
Removal and Replacement:  
VACUUM SWITCHES  
1. Disconnect dispenser from the power source.  
2. Remove the four thumb screws securing the right  
side pump head to the right side pump.  
3. Disconnecttheinputtubefromthepumpto vacuum  
switch to be removed.  
4. Remove the two #8-32 keps nuts securing the  
pump and bracket to main panel.  
5. Disconnect the yellow and white wires from the  
pump.  
6. Remove pump and bracket as an assembly.  
7. Disconnecttheinputtubesfromthevacuumswitch  
to be replaced.  
8. Disconnect the wires on the vacuum switch to be  
removed.  
9. Removethetwo#4-40screwssecuringthevacuum  
switchtothebracket. Removeanddiscardswitch.  
10. Using two #4-40 screws secure the new vacuum  
switch to the bracket.  
P1505  
FIG. 16 VACUUM SWITCHES  
Location:  
The vacuum switches are located inside autofill  
11. Refer to Fig 17 and reconnect the wires.  
12. Installpumpandbracketoverthetwostudsonthe  
bottom of main panel and secure with two #8-32  
keps nuts.  
13. Install the pump head with tubes on the back of  
the pump and secure with four thumb screws.  
14. Reconnecttheyellowandwhitewirestothepump.  
15. Connect the input hose from the pump to the new  
vacuum switch.  
box, mounted on the left side of the mounting bracket.  
Test Procedure:  
1. Disconnect the dispenser from the power source.  
2. Disconnect flavor input lines.  
3. Disconnectwhite/red,red/blackorthebrown/black  
wires on the vacuum switch.  
4. Check for continuity across the switch leads.  
Ifcontinuityispresentasdescribed,thevacuumswitch  
is operating properly.  
If continuity is not present as described, without a  
vacuum generated by a empty product concentrate,  
replace the vacuum switch.  
WHI/RED from Refill ON/OFF Switch #3  
WHI/RED to Circuit Board J4-2  
RED/BLK from Refill ON/OFF Switch #1  
RED/BLK to Circuit Board J4-5  
#1  
#3  
BRN/BLK from Refill ON/OFF Switch #2  
BRN/BLK to Circuit Board J4-4  
#2  
P1527  
FIG. 17 VACUUM SWITCH TERMINALS  
28791.1 011500  
15  
28791.1 011500  
16  
28791.1 011500  
17  

Casio DT 9721CHGE User Manual
Curtis FRW081UK User Manual
Datalogic Scanning Barcode Reader XLR User Manual
Friedrich Air Conditioner SL36 User Manual
Friedrich HA09K25__G User Manual
GE AST06 User Manual
GE CLIMATISEUR AEQ24 User Manual
GE General Electric Air Conditioner ASM22 User Manual
Haier HWR05XC9 L User Manual
HP Hewlett Packard LaserJet 3300mfp User Manual