DIGITAL 2T-CCMHA-CB Central Office
Memory Channel Hub
Installation/Service Guide
Part Number: EK-MCHCO-IN. A01
December 1998
Compaq Computer Corporation
Houston, Texas
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
1 Introduction
1.1 Overview .......................................................................................................... 1–1
1.2 Components and Controls ................................................................................. 1–1
1.2.1 Front Components................................................................................... 1–1
1.2.2 Operator Control Panel............................................................................ 1–3
1.2.3 Internal Components ............................................................................... 1–4
1.2.4 Rear Components.................................................................................... 1–4
1.3 Specifications.................................................................................................... 1–5
2 Installation
2.1 General ............................................................................................................. 2–1
2.2 Site Preparation................................................................................................. 2–1
2.3 Unpacking the Shipment................................................................................... 2–2
2.4 Installing the 2T-CCMHA-CB Central Office Memory Channel Hub................ 2–4
2.4.1 Determining the Installation Area............................................................ 2–4
2.4.2 Attaching the Slide Assemblies to the Cabinet Rails................................ 2–6
2.4.2.1 Attaching the Right Slide Assembly to the Cabinet Rails............... 2–6
2.4.2.2 Attaching the Left Slide Assembly to the Cabinet Rails................. 2–7
2.4.3 Attaching the Inner Races to the Tray ..................................................... 2–9
2.4.4 Mounting the Memory Channel Hub, Front Bezel, and Interlock Actuator
Bracket on the Tray ..................................................................................... 2–10
2.4.5 Mounting the Chassis and Tray Assembly on the Slides ........................ 2–12
2.5 Installing the Interlock System....................................................................... 2–14
iii
Download from Www.Somanuals.com. All Manuals Search And Download.
3 Removal and Replacement
3.1 Introduction ...................................................................................................... 3–1
3.2 Top Cover......................................................................................................... 3–3
3.3 Power Supply.................................................................................................... 3–4
Figures
Figure 1-1 Front Components ................................................................................. 1–2
Figure 1-2 Operator Control Panel.......................................................................... 1–3
Figure 1-3 Rear Components .................................................................................. 1–4
Figure 2-1 Installation Area and Rail-Hole Pattern (EIA Rail-Hole Pattern) ........... 2–5
Figure 2-2 Attaching the Slide Assemblies to the Cabinet Rails.............................. 2–7
Figure 2-3 Attaching the Inner Slide Races............................................................. 2–9
Figure 2-4 Mounting the Memory Channel Hub, Front Bezel, and Interlock Actuator
Bracket on the Tray.............................................................................................2–11
Figure 2-5 Mounting the Chassis and Tray Assembly on the Slides .......................2–13
Figure 2-6 The Interlock System............................................................................2–16
Figure 3-1 Removing and Replacing the Top Cover ............................................... 3–3
Figure 3-2 Removing the Power Supply.................................................................. 3–4
Figure 3-3 Disconnecting the Power Cable Connector and Removing the Power
Supply.................................................................................................................. 3–5
Tables
Table 1-1 2T-CCMHA-CB Central Office Memory Channel Hub Specifications... 1–5
Table 2-1 Mounting Hardware and Component List ............................................... 2–3
iv
Download from Www.Somanuals.com. All Manuals Search And Download.
Preface
Overview
This guide provides the information necessary to install the 2T-CCMHA-CB central office
Memory Channel hub in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant cabinet with an
EIA rail-hole pattern. It also provides information on removing and replacing the top cover
and the power supply.
Intended Audience
This guide is intended for Compaq service personnel or qualified Self-maintenance
customers who are familiar with installing computer systems, and for system managers and
others who perform system management tasks.
How to Use This Guide
Read this guide before installing the 2T-CCMHA-CB central office Memory Channel hub.
Before installation review the warranty. The terms of the warranty agreement with
Compaq may require that a qualified Compaq Customer Services representative install the
system. Contact your local Compaq representative if you have any questions.
Organization
This guide is organized as follows:
Chapter 1, Introduction – Provides an overview of the 2T-CCMHA-CB central office
Memory Channel hub and a description of the basic components and controls.
Chapter 2, Installation – Provides site preparation, unpacking, and system installation
information.
v
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3,.Removal and Replacement – Provides the removal and replacement
procedures for the top cover and power supply.
Related Documents
Other documents related to the 2T-CCMHA-CB central office Memory Channel hub
include the following:
•
•
Memory Channel User’s Guide (EK-PCIRM-UG)
Memory Channel Service Information (EK-PCIRM-SV)
Conventions
This guide uses the following conventions:
Convention
Meaning
Note
A note calls the reader’s attention to any item of information that may be of
special importance.
Caution
A caution contains information essential to avoid damage to the equipment.
A warning contains information essential to the safety of personnel.
Circled numbers provide a link between figures or examples and text.
Warning
Italic type
Italic type emphasizes important information, indicates variables, and
indicates complete titles of manuals.
Reader’s Comments
Compaq welcomes your comments on this or any other manual. You can send your
comments to Compaq in the following ways:
•
•
Mail:
Compaq Computer Corporation
Information Design
PKO3-2/21J
129 Parker Street
Maynard, MA 01754-2199
For additional information call 1-800-344-4825.
vi
Download from Www.Somanuals.com. All Manuals Search And Download.
1
Introduction
1.1 Overview
The 2T-CCMHA-CB central office Memory Channel hub is used to share and route data
between two AlphaServer 4100 central office systems.
1.2 Components and Controls
System components and controls are located at the front, internally, and at the rear of the
Memory Channel hub chassis.
1.2.1 Front Components
Figure 1-1 shows the components located on the front of the Memory Channel hub chassis.
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 1–1
Download from Www.Somanuals.com. All Manuals Search And Download.
Introduction
Figure 1-1 Front Components
DIGIT
AL
Memor
Central Office
y
Channel Hub 100/8
1
LJ-06497.AI7
Operator control panel
1–2 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Introduction
1.2.2 Operator Control Panel
The operator control panel (OCP), shown in Figure 1-2, is located on the front of the
Memory Channel hub chassis and consists of an On/Off switch, a Reset button, and three
LEDs.
Figure 1-2 Operator Control Panel
3
4
5
DIGITAL Memory Channel Hub 100/8
Central Office
2
1
LJ-06498.AI7
On/Off switch — Powers the system secondary dc power on or off.
Reset button — Initializes the system.
Turbo LED — Lit when computer runs at rated microprocessor speed. Not lit when in
non-turbo mode.
Disk LED — Indicates disk drive activity.
Power LED — Lit when power switch is On.
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 1–3
Download from Www.Somanuals.com. All Manuals Search And Download.
Introduction
1.2.3 Internal Components
The internal components of the Memory Channel hub chassis consist of the following:
One motherboard
Four to eight CCMLA hub linecards
Cooling fan
•
•
•
1.2.4 Rear Components
Figure 1-3 shows the components located on the rear of the Memory Channel hub chassis.
Figure 1-3 Rear Components
3
1
2
7
6
5
4
3
2
1
0
LJ-06499.AI7
Power supply
-48 Vdc power receptacle
CCMLA linecard slots
1–4 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Introduction
1.3 Specifications
Table 1-1 contains the physical, environmental, and electrical specifications for the 2T-
CCMHA-CB central office Memory Channel hub.
Table 1-1 2T-CCMHA-CB Central Office Memory Channel Hub Specifications
Physical Characteristics
Chassis
Weight
13.6 kg (30 lb.)
Length
40.64 cm (16 in.)
48.26 cm (19.0 in.)
17.78 cm (7.00 in.)
Width
Height
Environmental Requirements
Temperature range
Operating
0°C to 40°C (32°F to 104°F)
-20°C to 95°C (-4°F to 203°F)
11°C/hr (20°F/hr) maximum
28°C (82°F)
Non-Operating
Temperature change rate
Wet bulb temperature
(maximum)
Dew point temperature
(minimum)
2°C (36°F)
Relative humidity
Altitude
10% to 95% (noncondensing)
60 m to 3050 m (-200 ft to 10,000 ft)
Electrical Requirements
Nominal voltage
-48 Vdc
Operational voltage range
Input current (maximum)
Input power
-36 to -72 Vdc
1.25 A at -48 Vdc
60 W
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 1–5
Download from Www.Somanuals.com. All Manuals Search And Download.
SES Template Word 7 Blank Page Fix by Peter LaQuerre
Download from Www.Somanuals.com. All Manuals Search And Download.
2
Installation
2.1 General
This chapter covers the installation of the 2T-CCMHA-CB central office Memory Channel
hub in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant cabinet with an EIA rail-hole
pattern. The major topics covered in this chapter include:
•
•
•
Site Preparation
Unpacking the Shipment
Installing the 2T-CCMHA-CB central office Memory Channel Hub
– Determining the Installation Area
– Attaching the Slide Assemblies to the Cabinet Rails
– Attaching the Inner Races to the Tray
– Mounting the Chassis and Front Bezel to the Tray
Installing the Interlock System
•
For information on configuration and verification, refer to the Memory Channel User’s
Guide.
2.2 Site Preparation
The installation instructions that follow assume that:
•
All cables that you plan to connect to the 2T-CCMHA-CB central office Memory
Channel hub are in place and clearly labeled. These cables are the BC12N cables from
the CCMAA adapters installed in the AlphaServer systems.
•
The specifications and conditions listed in Section 1.3 have been met.
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–1
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
•
The system is located in an area that provides sufficient clearance for ventilation and
servicing. A clearance of 61 cm (24 in.) at the rear and 129.6 cm (51 in.) at the front
of the cabinet is required for service.
________________________ Caution___________________________
Do not impede airflow by obstructing the front and rear of the cabinet.
Exceeding internal thermal limits can affect system reliability.
___________________________________________________________
_______________________ WARNING__________________________
The 2T-CCMHA-CB central office Memory Channel hub can weigh up to
13.6 kg (30 lb.). To prevent personal injury and equipment damage, ensure
that the system is contained in an enclosure that can be stabilized when the
system is pulled out on its slides.
___________________________________________________________
_______________________ ACHTUNG__________________________
Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6
kg (30 lb) wiegen. Um Personen- und Geräteschaden zu vermeiden, sollten
Sie deshalb sicherstellen, daß sich das System in einem Gehäuse befindet,
das stabilisiert werden kann, wenn das System an den Schienen
herausgezogen wird.
___________________________________________________________
2.3 Unpacking the Shipment
The 2T-CCMHA-CB central office Memory Channel hub shipment may include several
cartons. Check the packing list to ensure that all items listed have been received.
If the equipment is damaged or if any items are missing, notify the delivery agent and
contact the Compaq sales representative.
Save all shipping cartons in case the equipment needs to be moved to a new location, or
needs to be returned for repair.
2–2 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
________________________WARNING __________________________
The 2T-CCMHA-CB central office Memory Channel hub can weigh up to
13.6 kg (30 lb.). Use sufficient personnel or the proper lifting equipment
when lifting or moving the system.
____________________________________________________________
________________________ACHTUNG __________________________
Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6
kg (30 lb) wiegen. Beim Hochheben oder Transport des Systems sollten
deshalb genügend Hilfskräfte vorhanden sein oder die richtigen
Hebewerkzeuge benutzt werden.
____________________________________________________________
Table 2-1 lists the mounting hardware and components included with the 2T-CCMHA-CB
central office Memory Channel hub shipment for installation in a 48.26-cm (19-in.) NEBS
2000/ETSI-compliant cabinet with an EIA rail-hole pattern.
Table 2-1 Mounting Hardware and Component List
Description
Part Number
12-46387-01
74- 53806-01
74-53812-02
74-53812-01
74-53819-01
74-53822-02
74-48997-03
90-00063-37
90-06291-10
90-09545-00
90-00063-39
90-11510-01
90-06563-00
90-06661-00
90-07031-01
EK-MCHCO-IN
Quantity
Chassis slide assembly
Tray
1 pair
1
1
Front bezel (gray) or
Front bezel (blue)
Interlock actuator bracket
Stabilizer bracket
Actuator latch
1
1
1
1
Screw, 10-32 truss-head
Set screw, 6-32
2
2
Screw, 8-32 pan-head
Screw, 10-32 truss-head
Standoff, 10-32
6
23
4
Kepnut, 8-32
6
Flat washer, 8-32
Tie-wraps
5
10
1
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub
Installation/Service Guide
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–3
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.4 Installing the 2T-CCMHA-CB Central Office Memory
Channel Hub
The following sections contain the procedure for installing the 2T-CCMHA-CB central
office Memory Channel hub in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant cabinet
with an EIA rail-hole pattern.
Tools Required
•
•
•
Phillips-head screwdriver
Flat-blade screwdriver
Adjustable wrench
2.4.1 Determining the Installation Area
The 2T-CCMHA-CB central office Memory Channel hub requires 22.23 cm (8.75 in.) of
vertical space or 15 contiguous holes in a 48.26-cm (19-in.) NEBS 2000/ETSI-compliant
cabinet with an EIA rail-hole pattern.
The holes in the EIA rail-hole pattern cabinet rails follow a pattern of 1.27 cm (0.50 in.),
1.59 cm (0.625 in.), and 1.59 cm (0.625 in.). This pattern is called a set and is repeated for
the length of the cabinet rails.
To determine the installation area, perform the following steps at the front and the rear
cabinet rails (refer to Figure 2-1).
1. Select a section of the cabinet rail where there is a 1.27 cm (0.05 in.) space between
two holes and make a mark between these two holes. This is the starting point of the
installation area.
2. Count up or down 15 holes from the starting point and make a mark above or below
the 15th hole. The area between these two marks is the installation area. The bottom
hole of the installation area is identified as hole 1 of the installation area.
3. Repeat steps 1 and 2 for the same holes on the front of both front rails and the rear of
both rear rails.
The total installation area for the 2T-CCMHA-CB central office Memory Channel hub is
or 22.23 cm (8.75 in.) of vertical space.
2–4 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
Figure 2-1 Installation Area and Rail-Hole Pattern (EIA Rail-Hole Pattern)
4
4
8 3/4"
7"
"Installation Area"
5 1/4"
3 1/2"
1 3/4"
0.625 inch
0.625 inch
0.500 inch
0.625 inch
3
2
1
3
2
1
0.625 inch
0.500 inch
0.625 inch
"1.75 Rule"
0.625 inch
0.500 inch
0.625 inch
LJ-06500.AI4
Hole 1 for attaching left and right slide
brackets.
Hole 3 for attaching left and right slide
brackets.
Hole 2 for installing standoffs on left
and right front rails.
Hole 14 for installing standoffs and nuts on
left and right front rails.
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–5
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.4.2 Attaching the Slide Assemblies to the Cabinet Rails
The following sections contain the procedures for attaching the right and left slide
assembles to the cabinet rails.
2.4.2.1 Attaching the Right Slide Assembly to the Cabinet Rails
To attach the right slide assembly to the cabinet rails, refer to Figure 2-2 and proceed as
follows:
1. Determine the proper mounting holes for the right slide brackets. The proper mounting
holes are the 1st, 2nd, and 3rd holes of the installation area (see Figure 2-1).
2. Locate the right slide assembly.
3. Place the right front slide bracket on the inside of the right front rail and align the
three slide bracket holes and with the 1st, 2nd, and 3rd holes of the installation area on
the right front rail.
4. Install two 10-32 truss-head screws in the 1st and 3rd holes of the installation area
to secure the right front slide bracket to the right front rail, but do not tighten.
5. Install a 10-32 standoff in the 2nd hole of the installation area on the right front rail.
Tighten this standoff.
6. Place the right rear slide bracket on the inside of the right rear rail and align the three
slide bracket holes and with the 1st, 2nd, and 3rd holes of the installation area on the
right rear rail.
7. Install three 10-32 truss-head screws in the 1st, 2nd, and 3rd, holes of the
installation area to secure the right rear slide bracket to the right rear rail, but do not
tighten.
8. Tighten the two 8-32 screws and nuts that secure the right rear slide bracket to the
right slide assembly.
9. Securely tighten all five 10-32 truss-head screws that secure the right slide assembly
to the right front and rear cabinet rails.
10. Install a 10-32 standoff in 14th hole of the installation area on the right front rail
and secure it in place with a 10-32 nut.
2–6 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
Figure 2-2 Attaching the Slide Assemblies to the Cabinet Rails
3
4
3
4
1
1
2
2
LJ-06501.AI7
2.4.2.2 Attaching the Left Slide Assembly to the Cabinet Rails
To attach the left slide assembly to the cabinet rails, refer to Figure 2-2 and proceed as
follows:
1. Determine the proper mounting holes for the left slide brackets. The proper mounting
holes are the 1st, 2nd, and 3rd holes of the installation area (see Figure 2-1).
2. Locate the left slide assembly.
3. Place the left front slide bracket on the inside of the left front rail and align the three
slide bracket holes and with the 1st, 2nd, and 3rd holes of the installation area on the
left front rail.
4. Install two 10-32 truss-head screws in the 1st and 3rd holes of the installation area
to secure the left front slide bracket to the left front rail, but do not tighten.
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–7
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
5. Install a 10-32 standoff in the 2nd hole of the installation area on the left front rail.
Tighten this standoff.
6. Place the left rear slide bracket on the inside of the left rear rail and align the three
slide bracket holes and with the 1st, 2nd, and 3rd holes of the installation area on the
left rear rail.
7. Install three 10-32 truss-head screws in the 1st, 2nd, and 3rd, holes of the
installation area to secure the left rear slide bracket to the left rear rail, but do not
tighten.
8. Tighten the two 8-32 screws and nuts that secure the left rear slide bracket to the left
slide assembly.
9. Securely tighten all five 10-32 truss-head screws that secure the left slide assembly to
the left front and rear cabinet rails.
10. Install a 10-32 standoff in 14th hole of the installation area on the left front rail and
secure it in place with a 10-32 nut.
2–8 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.4.3 Attaching the Inner Races to the Tray
To attach the inner slide races to the tray, refer to Figure 2-3 and proceed as follows:
_________________________Caution ___________________________
When performing this procedure, ensure that the locking lever is on the outside
of the inner slide race. Otherwise, the slide will be damaged when the system is
installed on the slide assemblies.
____________________________________________________________
Remove the inner slide race from the right slide assembly and attach the right inner slide
race to the right side of the tray (as viewed from the front) using three 8-32 pan-head
screws
.
Remove the inner slide race from the left slide assembly and attach the left inner slide race
to the left side of the tray (as viewed from the front) using three 8-32 pan-head screws
.
Figure 2-3 Attaching the Inner Slide Races
3
1
2
2
LJ-06503.AI7
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–9
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.4.4 Mounting the Memory Channel Hub, Front Bezel, and Interlock
Actuator Bracket on the Tray
To mount the 2T-CCMHA-CB central office Memory Channel hub, front bezel, and
interlock actuator bracket on the tray, refer to Figure 2-4 and proceed as follows:
_______________________ WARNING__________________________
The 2T-CCMHA-CB central office Memory Channel hub can weigh up to
13.6 kg (30 lb.). Use sufficient personnel or the proper lifting equipment
when lifting or moving the system.
___________________________________________________________
_______________________ ACHTUNG__________________________
Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6
kg (30 lb) wiegen. Beim Hochheben oder Transport des Systems sollten
deshalb genügend Hilfskräfte vorhanden sein oder die richtigen
Hebewerkzeuge benutzt werden.
___________________________________________________________
1. Turn the 2T-CCMHA-CB central office Memory Channel hub upside down on a
proper work surface.
2. Turn the tray (with inner races attached) upside down and place it on bottom cover
of the 2T-CCMHA-CB central office Memory Channel hub
.
3. Align the nine holes in the bottom cover of the 2T-CCMHA-CB central office
Memory Channel hub with the nine holes in the tray.
4. Install nine 10-32 truss-head screws through the bottom of the tray into the hub
chassis to secure the 2T-CCMHA-CB central office Memory Channel hub to the tray.
5. Turn the front bezel upside down and place flat washers on the five left most studs
on the inside of the bezel. A flat washer is not required on the stud behind the
indented label area.
6. Align the six studs on the inside of the bezel with the six holes in the front of the tray
and push the bezel onto the tray.
7. Secure the front bezel to the tray with six 8-32 kepnuts
.
8. Use two 8-32 screws to secure the interlock actuator bracket to the rear of the
tray.
2–10 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
Figure 2-4 Mounting the Memory Channel Hub, Front Bezel, and Interlock
Actuator Bracket on the Tray
3
5
3
3
4
5
1
2
6
LJ-06502A.AI7
7
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–11
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.4.5 Mounting the Chassis and Tray Assembly on the Slides
To mount the chassis and tray assembly on the slides, refer to Figure 2-5 and proceed as
follows:
_______________________ WARNING__________________________
The 2T-CCMHA-CB central office Memory Channel hub can weigh up to
13.6 kg (30 lb.). Use sufficient personnel or the proper lifting equipment
when lifting or moving the system.
___________________________________________________________
_______________________ ACHTUNG__________________________
Der 2T-CCMHA-CB Central Office Memory Channel Hub kann bis zu 13,6
kg (30 lb) wiegen. Beim Hochheben oder Transport des Systems sollten
deshalb genügend Hilfskräfte vorhanden sein oder die richtigen
Hebewerkzeuge benutzt werden.
___________________________________________________________
Stabilize the cabinet before installing the chassis and tray assembly into the cabinet.
1. Pull both slide assemblies out fully to their locked positions.
2. Lift the chassis and tray assembly and position it so that the inner slide races fit into
the front end of the slides.
3. Push the chassis and tray assembly into the slides until it stops. Push in on the two
locking levers and then push the system into the cabinet.
4. Secure the chassis to the front cabinet rails using four 10-32 truss-head screws . The
screws go through the front bezel and into the four standoffs previously installed in the
2nd and 14th holes of the left and right front cabinet rails.
2–12 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
Figure 2-5 Mounting the Chassis and Tray Assembly on the Slides
1
3
1
3
DIGIT
AL
Memor
Central Office
y
Channel Hub 100/8
2
4
LJ-06504.AI7
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–13
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
2.5 Installing the Interlock System
The interlock system helps prevent cabinet instability by allowing only one system at a
time to be pulled out of the cabinet.
The interlock system consists of a vertical rod on which are mounted actuator latches for
each product installed in the cabinet. These actuator latches engage the interlock actuator
bracket on the rear of rackmount systems. When a rackmount system is pulled out of the
cabinet, the actuator latches rotate to prevent any other rackmount system that has an
interlock actuator bracket from being pulled out of the cabinet.
If additional products are installed into the cabinet, actuator latches for those products
should be installed. To install actuator latches, refer to Figure 2-6 and proceed as follows:
1. Remove the screws securing the bottom mounting bracket to the cabinet.
2. Slide the mounting bracket off the bottom of the vertical rod
.
3. Slide the actuator latch for the new product onto the bottom of the vertical rod.
4. Slide the stabilizer bracket for the new product onto the bottom of the vertical rod.
5. Replace the bottom mounting bracket and install the screws removed in step 1 but
do not tighten them.
6. Position the stabilizer bracket so that the top surface of the stabilizer bracket is
aligned just below the interlock actuator bracket on the installed system (see bottom
expanded view). This may require the loosening and sliding of other latches and
stabilizer brackets to accommodate the new configuration.
7. Install and tighten the two 10-32 truss-head screws provided to secure the stabilizer
bracket to the rear rail (see bottom expanded view).
8. Position the new actuator latch to properly engage the interlock actuator bracket,
and tighten the two 6-32 set screws to secure the latch (see bottom expanded view).
9. Now tighten the screws to secure the bottom mounting bracket
.
The expanded view (A) shows the position of the actuator latches when all systems are
pushed into the cabinet. The expanded view (B) shows the position of all actuator latches
after one system has been pulled out.
2–14 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
__________________________ Note _____________________________
The interlock system is compatible with the 2T-CCMHA-CB central office
Memory Channel hub. Other systems may not be compatible because the
interlock actuator bracket may not engage properly. In these cases, do not install
the interlock actuator bracket on those systems.
____________________________________________________________
________________________WARNING __________________________
If a system is installed without an interlock actuator bracket or the vertical
rod in the cabinet does not engage properly with the system interlock
actuator bracket, it is the customer's responsibility to provide a stable
cabinet.
____________________________________________________________
________________________ACHTUNG __________________________
Falls ein System ohne Verriegelungsklammer installiert wird oder die
vertikale Stange im Gehäuse nicht richtig in der Verriegelungsklammer des
Systems einrastet, dann ist der Kunde selbst für die Bereitstellung eines
stabilen Gehäuses verantwortlich.
____________________________________________________________
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 2–15
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation
Figure 2-6 The Interlock System
B
A
5
2
1
1
B
A
2
5
1
LJ-06471.AI7
4
2–16 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
3
Removal and Replacement
3.1 Introduction
This chapter contains the procedures for removing and replacing the top cover and power
supply of the 2T-CCMHA-CB central office Memory Channel hub:
For troubleshooting information and the procedure for removing the CCMLA linecards,
motherboard, hub fan assembly, and hub control panel, refer to the Memory Channel
Service Information manual.
________________________WARNING __________________________
Before servicing the 2T-CCMHA-CB central office Memory Channel hub
chassis or performing any of the following removal and replacement
procedures, ensure that the DC On/Off button on the OCP is in the OFF
position and disconnect the power cable from the power supply dc input
receptacle on the rear of the chassis.
____________________________________________________________
________________________ACHTUNG __________________________
Vor der Wartung des Gehäuses des 2T-CCMHA-CB Central Office
Memory Channel Hub bzw. vor der Durchführung der folgenden Verfahren
zum Entfernen oder Auswechseln von Komponenten müssen der On/Off-
Netzstromschalter auf dem OCP auf OFF eingestellt und das Netzkabel aus
der Netzsteckereingangsbuchse an der Rückseite des Gehäuses gezogen
werden.
____________________________________________________________
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 3–1
Download from Www.Somanuals.com. All Manuals Search And Download.
Removal and Replacement
_______________________ WARNING__________________________
Only a qualified service person should remove and replace components in
the 2T-CCMHA-CB central office Memory Channel hub. A qualified
service person should have the technical training and experience necessary
to be aware of the hazards to which they are exposed in performing a task
and the measures that should be taken to minimize the danger to themselves
or other persons.
___________________________________________________________
_______________________ ACHTUNG__________________________
Die Komponenten im 2T-CCMHA-CB Central Office Memory Channel
Hub dürfen nur von qualifiziertem Wartungspersonal entfernt bzw.
ausgewechselt werden. Qualifiziertes Personal sollte entsprechend technisch
geschult sein und über die nötige Erfahrung verfügen, um die möglichen
Gefahren zu kennen, denen sie bei der Ausführung der notwendigen
Wartungsarbeiten ausgesetzt sein könnten, und um die entsprechenden
Schritte zur Minimierung dieser Gefahren für das Wartungspersonal und
für andere Personen unternehmen zu können.
___________________________________________________________
Tools Required
The following tools are required for servicing the 2T-CCMHA-CB central office Memory
Channel hub chassis:
•
•
•
Phillips-head screwdriver
Flat-blade screwdriver
Adjustable wrench
3–2 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Removal and Replacement
3.2 Top Cover
_________________________Caution ___________________________
Use care when removing and replacing the cover to prevent damage to the RFI
gaskets that are located around the cover and opening.
____________________________________________________________
Perform the following procedure to remove the top cover:
1. Unlock the top cover by turning the key, located on the rear of the chassis, clockwise
to the unlock position (see Figure 3-1). The lock is unlocked when the key is in the
vertical position.
2. Insert two fingers into the finger grip on the rear edge of the top cover.
3. Slide the top cover toward the rear of the chassis and remove (see Figure 3-1).
To replace the top cover, refer to Figure 3-1and reverse steps 1 through 3 of the removal
procedure.
Figure 3-1 Removing and Replacing the Top Cover
DIGIT
AL
Memor
Centra
y
l
C
O
h
f
a
fi
nel Hub 100/8
n
c
e
LJ-06508.AI7
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 3–3
Download from Www.Somanuals.com. All Manuals Search And Download.
Removal and Replacement
3.3 Power Supply
Perform the following procedure to remove the power supply:
1. Remove the top cover (see Section 3.2).
2. Remove the four screws on the rear of the chassis that secure the power supply (see
Figure 3-2).
3. Loosen the two screws and disconnect the power cable connector from the power
supply (see Figure 3-3).
4. Slide the power supply toward the front of the chassis until it is free and then lift the
power supply out of the chassis.
To replace the power supply, refer to Figure 3-2 and Figure 3-3 and reverse steps 1
through 4 of the removal procedure.
Figure 3-2 Removing the Power Supply
LJ-06509.AI7
3–4 DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide
Download from Www.Somanuals.com. All Manuals Search And Download.
Removal and Replacement
Figure 3-3 Disconnecting the Power Cable Connector and Removing the
Power Supply
2
1
LJ-06514.AI7
DIGITAL 2T-CCMHA-CB Central Office Memory Channel Hub Installation/Service Guide 3–5
Download from Www.Somanuals.com. All Manuals Search And Download.
SES Template Word 7 Blank Page Fix by Peter LaQuerre
Download from Www.Somanuals.com. All Manuals Search And Download.
|