I N S T A L L A T I O N I N S T R U C T I O N S
Instrucciones de instalación
Installationsanleitung
Istruzioni di installazione
Installatie-instructies
Instruções de Instalação
Instructions d´installation
Projector Lock
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
PL2
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
PL2
installeert is ervoor verantwoordelijk dat alle onderdelen aan
de hand van de meegeleverde handleiding op de juiste wijze
worden samengebouwd en gemonteerd.
AVVERTENZA: La mancata comprensione e ottemperanza
alle istruzioni fornite può provocare gravi lesioni personali,
danni all'apparecchiatura o annullare la garanzia fornita dal
produttore. Spetta all'installatore verificare che tutti i
componenti siano assemblati correttamente e installati
secondo le istruzioni fornite.
IMPORTANTS AVERTISSEMENTS et
PRÉCAUTIONS!
ADVERTISSEMENT: Un ADVERTISSEMENT vous met en
garde contre les possibilités de blessures graves ou de
danger de mort si vous ne suivez pas les instructions.
BELANGRIJKE AANWIJZINGEN en
WAARSCHUWINGEN!
WAARSCHUWING: Een WAARSCHUWING vestigt uw
aandacht op de mogelijkheid van ernstig of dodelijk letsel als
u de instructies niet opvolgt.
PRÉCAUTION: Une PRÉCAUTION vous met en garde
contre les possibilités d´endommagements et de destruction
de l´équipement si vous ne suivez pas les instructions
correspondantes.
VOORZICHTIG: De aanwijzing VOORZICHTIG vestigt uw
aandacht op de mogelijkheid van beschadiging of
onherstelbare beschadiging van de apparatuur als u de
betreffende instructies niet opvolgt.
ADVERTISSEMENT: Le manque de la lecture, de la
compréhension et du respect total de toutes les instructions,
peut entraîner des blessures corporelles graves,
endommager l'équipement ou annuler la garantie d'usine. Il
incombe à l'installateur de s'assurer que tous les composants
sont correctement assemblés et installés à l'aide des
instructions fournies.
WAARSCHUWING: Door niet alle instructies te lezen,
volledig te begrijpen en op te volgen, riskeert u ernstig
persoonlijk letsel, beschadiging van de apparatuur en het
vervallen van de fabrieksgarantie. Degene die het product
DIMENSIONS
3
Download from Www.Somanuals.com. All Manuals Search And Download.
PL2
Installation Instructions
LEGEND
Tighten Fastener
Optional
Opcional
Optional
Opcional
Opzionale
Optie
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
En option
Phillips Screwdriver
Lock
Destornillador Phillips
Fijar
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Sichern
Fixar
Bloccare
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Vergrendelen
Verrouiller
By Hand
Remove
Quitar
A mano
Von Hand
Com a mão
A mano
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Met de hand
À la main
TOOLS REQUIRED FOR INSTALLATION
#2
PARTS
A (1)
B (1)
C (2)
D (2)
M3
E (2)
#8 (4mm)
F (2)
4
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
PL2
INSTALLATION
WARNING: Use of screws that are too long may result in
SECURITY COVERS FOR INTERFACE
damage to internal components of projector, and use of
screws that are too short may allow projector to fall. Failure
to use screws of proper length may result in serious personal
injury or damage to equipment!
WARNING: Failure to adequately support projector may
allow projector to fall, resulting in serious personal injury or
damage to equipment! Place projector and interface on
secure surface or take other actions to ensure projector does
not fall during installation of security covers!
4. Install security cover (C), washer (E, if required), washer (D,
if required), and screw. (See Figure 1)
NOTE: Screw hole in cover (C) is off center and may be rotated
1. Remove projector and interface from RPA mount and place
as required to provide adequate clearance to interface.
on secure surface.
IMPORTANT ! : If using washers (D and/or E) then longer
screw may be necessary. Screw MUST engage threaded hole
in projector a distance equal to or greater than the diameter of
the screw (See Figure 2)! Longer screw(s) not included.
NOTE: If desired, entire projector mount assembly may be
removed by disconnecting at top or bottom of extension
column.
NOTE: Projector, interface, RPA mount, and extension column
not included.
2. Remove one screw attaching interface to projector (See
Figure 1).
2
4
> "X"
D
0.38" (9.7mm)
E
"X"
C
5
Figure 2
0.25" (6.4mm)
5. Install padlock through holes in cover (C) (See Figure 1).
NOTE: Padlock not included.
6. If desired, repeat steps 2-5 for second cover (C).
7. Reinstall projector and interface to RPA mount. See
instructions included with interface.
NOTE: If projector mount assembly was disconnected at top or
bottom of extension column, then accomplish the
following:
Figure 1
•
Reinstall projector mount assembly as required.
See instructions included with mount and/or
extension column.
3. Determine washer requirements using following table:
•
Verify and/or adjust projector image as required.
See instructions included with projector.
IF diameter of screw removed in
step 2 is:
THEN use washer(s):
M3 or smaller
M4
D and E
E
M5 or larger
No washer required
5
Download from Www.Somanuals.com. All Manuals Search And Download.
PL2
Installation Instructions
4. Slide enclosure (B) partially into enclosure (A) (See Figure
SECURITY ENCLOSURE FOR MOUNT
4).
NOTE: Projector not shown in Figures 3-6 for clarity.
5. Lift cables into opening in enclosure (B), then slide
1. If cables exit extension column below RPA mount, then
route cables to left side of mount as shown (See Figure 3).
enclosure (B) fully into enclosure (A) (See Figure 5).
A
2
B
A
5
Figure 5
6. Insert key (F) into lock in enclosure (A) (See Figure 6).
Rotate 1/4 turn to secure enclosure (A) to enclosure (B).
NOTE: If key (F) will not rotate, ensure key (F) is fully inserted
into lock, and that locking slots in enclosures (A, B) are
aligned.
1
Figure 3
2. Align thumb nut slots in enclosure (A) with thumb nuts on
interface (See Figure 3). Lower enclosure (A) into place.
Ensure open end of enclosure (A) faces toward cables (if
applicable).
A
3. Slide enclosure (A) towards center of mount and lock into
position beneath interface thumb nuts (See Figure 4).
F
3
6
A
Figure 6
B
4
Figure 4
6
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
PL2
7
Download from Www.Somanuals.com. All Manuals Search And Download.
PL2
Installation Instructions
USA/International
Europe
A
P
F
A
P
F
8401 Eagle Creek Parkway, Savage, MN 55378
800.582.6480 / 952.894.6280
877.894.6918 / 952.894.6918
Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands
31 (0)40 2668620
31 (0)40 2668615
Asia Pacific
A
Room 30I, Block D, Lily YinDu International Building
LuoGang, BuJi Town, Shenzhen, CHINA. Post Code: 518112
8807-000052
¤2006 Chief Manufacturing
07/06
P
F
+86-755-8996 9226 ; 8996 9236 ; 8996 9220
+86-755-8996 9217
Download from Www.Somanuals.com. All Manuals Search And Download.
|