Chief Manufacturing Indoor Furnishings MSR Series User Manual

I N S T A LL A T I O N IN S T R U C T IO N S  
MEDIUM FLAT PANEL DISPLAY STATIC MOUNT  
MSR Series  
The MSR Series static mount accommodates medium  
flat panel displays weighing up to 125 lbs (57 kgs).  
The teardrop holes in the mount allow for quick  
connect/disconnect of the display, thus simplifying  
installation and maintenance processes.  
The top and bottom mounting brackets are adaptable to  
single wood stud mounting or dual wood studs that are  
16” on center.  
After installing the display on the mount, the screen can  
be locked in place using the convenient locking flag.  
A padlock can be used on the latching flag for added  
security.  
The mount is concealed behind the display, making it a  
low profile wall mount.  
MSR Series  
! IMPORTANT: If the installation of this product requires OSHPD seismic approval, refer to OSHPD pre-approval  
documents and drawings before beginning installation. OSHPD documents and drawings are available at  
www.chiefmfg.com, and located on the product information page for the mount.  
BEFORE YOU BEGIN  
x
CAUTION: To prevent damage to your monitor and MSR, which could affect or void the Factory  
warranty, thoroughly study all instructions and illustrations before you begin to install the mount. Pay  
particular attention to the Warnings and Cautions in this document.  
x
The mount is designed to be installed using wall studs or supporting framework. The fasteners used to anchor the  
mount must be capable of supporting five times the total weight of the equipment.  
x
x
The maximum weight to be installed on the MSR Series static wall mount is 125 lbs (57 kg).  
If you have any questions about this installation, contact Chief Manufacturing at 1-800-582-6480 or 952-582-6480.  
CHIEF MANUFACTURING INC.  
8840-000079 RevF  
©2007 Chief Manufacturing  
10/07  
1-800-582-6480 952-894-6280 FAX 952-894-6918  
8401 EAGLE CREEK PARKWAY, STE. 700  
SAVAGE, MINNESOTA 55378 USA  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
MSR Series  
PARTS LIST  
Prior to assembly, unpack the carton completely. Verify  
contents listed in Table 1 and Figure 1.  
CONTENTS  
DIMENSIONAL DRAWING ..................................... 2  
TOOLS REQUIRED FOR INSTALLATION.............. 3  
PARTS LIST .............................................................. 3  
MSR INSTALLATION .............................................. 4  
Select And Prepare Mounting Location.................... 4  
Mount the MSR....................................................... 5  
ATTACH MSB TO THE DISPLAY ........................... 6  
INSTALL THE DISPLAY.......................................... 6  
REMOVE THE DISPLAY.......................................... 6  
Read installation instructions completely. If you are  
missing any of the listed parts, contact Customer Service  
at: 1-800/582-6480.  
Table 1. Parts List  
REF  
10  
DESCRIPTION  
MSR-Series Static Mount  
*BOLT, Lag, 5/16” x 2 1/2”  
*WASHER, 5/16”  
QTY  
1
20  
2 or 4  
2 or 4  
1
30  
TOOLS REQUIRED FOR  
INSTALLATION  
**Extender, Latching Flag (not shown)  
**Screw, Phillips Machine, 10-24 x 1/2”  
(not shown)  
1
x
Drill and drill bit set  
x
Wrench set  
**Nut, Lock, 10-24 (not shown)  
1
NOTE: Other tools may be required depending on your  
** Included in Latching Flag Extension Kit  
method of installation.  
* Quantity required is dependent upon mounting  
configuration chosen during installation. See “MSR  
Installation” section of this document to determine  
appropriate quantities.  
10  
Lag Bolts  
20  
Washers  
30  
Figure 1. Parts  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
MSR Series  
MSR INSTALLATION  
Select And Prepare Mounting Location  
WARNING: Improper installation can result  
in serious personal injury or damage to equipment!  
Make sure that the structural members can support a  
redundant weight factor five times the total weight of  
the equipment. If not, reinforce the structure before  
installing the mount. It is the responsibility of the  
installer to verify that the framework will safely  
support the combined load of the MSR and all  
attached components and equipment.  
Pilot Holes  
Wall  
1. Use a stud sensor to locate existing stud(s), and  
identify available framework.  
2. Identify appropriate mounting hole pattern. See  
figures 2 though 4 at right to determine appropriate  
mounting hole pattern for the framework identified.  
Figure 2. Single Stud Pilot Hole location  
Wall  
16”  
NOTE: The MSR can be mounted using either a two, or  
four hole mounting pattern depending upon available  
framework. (see Figures 2 through 4)  
Pilot Holes  
Once suitable framework and appropriate mounting  
pattern have been identified:  
3. Locate and mark locations of all mounting holes  
making certain that marks are on center of all studs.  
(see Figures 2 though 4)  
Pilot Holes  
9 ½”  
4. Drill pilot holes using a 7/32” drill bit.  
5. Proceed to “Mounting the MSR”.  
Wood Studs  
Figure 3. Vertical Dual Stud / Masonry Pilot Hole  
Location  
Wood Studs  
Pilot Holes  
9 ½”  
Figure 4. Horizontal Dual Stud Pilot Hole Location  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
MSR Series  
6” max. “ Side to Side”  
Adjustment  
2” max. “Side to Side”  
Adjustment  
MSR INSTALLATION (Cont’d)  
Mount the MSR  
To mount the MSR:  
1. Place MSR against wall and align MSR upper  
mounting holes with upper pilot hole(s) in wall.  
(see Figure 5).  
2. Install 5/16” x 2-½” lag bolts (20), and 5/16” washers  
(30) through MSR upper mounting holes and into  
upper pilot holes. DO NOT fully tighten upper lag  
bolts at this time.  
3. Verify lower MSR mounting hole(s) align with lower  
pilot hole(s), and that MSR is properly positioned.  
4. Install 5/16” x 2-½” lag bolts (20), and 5/16” washers  
(30) through MSR upper mounting holes and into  
lower pilot holes.  
NOTE: Once mounted on wall, MSR location can be  
adjusted up to a maximum of one inch right or  
left of slot center, if using slotted mounting holes,  
or up to a maximum of three inches right or left if  
mounted using the single stud mounting holes  
(see Figure 5).  
Figure 5. MSR Positioning Adjustments  
5. Once MSR is properly positioned, tighten all lag  
bolts.  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
MSR Series  
ATTACH MSB TO THE DISPLAY  
To attach the MSB to the display, do the following:  
Display  
x
To help your identify the correct MSB that matches  
the model number of your display, refer to the cross-  
reference chart at www.chiefmfg.com.  
x
To download the corresponding MSB installation  
instructions, refer to www.chiefmfg.com.  
OR  
x
Contact Customer Service at 952-582-6480 if you  
have any questions about how to select the MSB that  
matches the model number of your display.  
INSTALL THE DISPLAY  
IMPORTANT! Display size may impact the ability to  
effectively reach the latching flag. If this is the case  
install the optional “Latching Flag Extension kit”  
provided with mount and reinstall display. See  
“Latching Flag Extension Installation” below.  
MSR Mount  
MSB  
To install the display, do the following:  
NOTE: Verify that all power/audio/video cables are  
disconnected and MSR latching flag is in the  
“down” position before attempting to mount  
the display.  
Figure 6. Install the Display  
1. With the aid of another person, lift the display up to  
the mount (10) on the wall, aligning mounting  
buttons with the teardrop slots on the mount, and  
lower the display firmly into place (see Figure 6).  
Lock  
2. Raise latching flag to secure the display (see Figure  
7). If the flag does not fully engage, check to ensure  
the mounting buttons are fully seated in the slots.  
NOTE: A padlock may be installed through the hole in  
Teardrop Slot  
the latching flag for additional security.  
Unlock  
REMOVE THE DISPLAY  
Latching Flag  
Figure 7. Raise Latching Flag to Lock  
To remove the display from the mount, do the following:  
1. Disconnect all power/audio/video cables.  
2. Lower the latching flag to unlock the display.  
3. With the aid of another person, lift the display up and  
out of the teardrop slots in the mount to remove the  
display.  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Instructions  
MSR Series  
Latching Flag Extension  
Installation  
1. Insert extender slot into top of latching flag.  
2. Install screw through latching flag and extender into  
nut.  
Extender  
Locknut  
Machine Screw  
Latching Flag  
Figure 8. Raise Latching Flag to Lock  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  

Bosch Appliances Range HDS252U User Manual
Bradley Smoker Outdoor Shower HN 400 User Manual
Bravetti Fryer EP67 User Manual
Briggs Stratton Portable Generator 30230 User Manual
Brother Sewing Machine Brother Sewing Machine User Manual
Casio Digital Camera VERSION 23 User Manual
Century Vacuum Cleaner WDV10 User Manual
Chamberlain Home Security System 3900PLD User Manual
Chauvet Work Light Pocketspot LED User Manual
Cisco Systems IP Phone 7940 7960 User Manual