AMX TV Receiver CB TP17 User Manual

Installation Guide  
CB-TP17  
Rough-In Box for 17" Wall/Flush Mount Touch Panels  
Overview  
Installing the 17" panel within a CB-TP17 Rough-In Box  
Wall Mount panels (NXDs) are contained within a metallic outer housing (back  
box). This back box is not removed when installing the NXD into a Rough-In  
Box (CB-TP17). The back box is only removed to gain access for the  
replacement of the Compact Flash component or upgrade to the VESA housing.  
The Rough-In Box must be mounted prior to continuing this section. Verify that  
all necessary cables have been threaded through the knockouts on the Rough-In  
Box and the connections have been tested prior to installation of the 17" panel.  
1.  
Remove the magnetic faceplate/bezel (A in FIG. 1) from the main NXD unit  
(B in FIG. 1) by gripping the faceplate and pulling with gentle outward force.  
Verify the incoming RJ-45, Ethernet, and any other audio/video cables  
have been properly threaded through the wiring knockouts on the left of the  
Rough-In Box. Leave enough slack in the wiring to accommodate any  
re-positioning of the panel.  
The CB-TP17 Rough-In Box is an optional metallic box that is secured onto a  
beam in a pre-wall setting (where no walls or present). Installation procedures  
and configurations can vary.  
2.  
Specifications  
3.  
Connect all data and power wiring connectors to their corresponding  
locations along the side of the (un-powered) NXD touch panel.  
Verify the terminal end of the power cable is not connected to a power  
supply before plugging in the 2-pin power connector.  
CB-TP17 (FG034-10) Specifications  
Dimensions (HWD) • 13.55" x 17.07" x 3.49"  
• 34.43 cm x 43.38 cm x 8.85 cm  
The USB connectors can be from either a USB extension cable, or a  
wireless USB RF transmitter.  
Included  
Rough-In Box Installation Kit (SA2001-02)  
Accessories  
• 4 Phillips pan-head (#4-40 x 0.375 Black) screws (80-0115)  
• 4 Phillips pan-head (#4-40 x 0.625 Black) screws (80-0118)  
Note: Don’t disconnect the connectors from the touch panel. The unit must be  
installed with the attached connectors before being inserted into the CB.  
Certifications  
• cTUVus Listed  
4.  
Test the incoming wiring by connecting the panel connections to their  
terminal locations and applying power. Verify the panel is receiving power  
and functioning properly to prevent repetition of the installation.  
Disconnect the terminal end of the power cable from the connected PSN  
power supply.  
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-  
IN BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK.  
This gap allows the installation of the drywall/sheetrock after the CB-TP17 has  
been mounted onto the beams. The stud notching and Rough-In Box installation  
must be done prior to any wall installation.  
5.  
6.  
7.  
Carefully slide the main NXD unit (B in FIG. 1) into the Rough-In Box, so  
the Mounting Tab lies flush against the Rough-In Box (C in FIG. 1).  
Insert and secure four securing #8 flat-head Mounting Screws into their  
corresponding holes located along the sides of the NXD. These #8 screws  
are not included within the CB Installation Kit.  
Note: The most important thing to remember when mounting this Rough-In Box  
is that the mounting tabs must be mounted flush against the outside of the  
sheetrock. This step determines whether or not the mounting stud is notched  
(cutout-out to fit the Rough-In Box).  
8.  
9.  
Replace the magnet faceplate (A in FIG. 1) back onto the main NXD unit.  
Make sure to align the Microphone, Light, and PIR Motion sensor locations  
to their respective openings on the front bezel/faceplate.  
Pre-Wall Installation of the CP-TP17 Rough-In Box  
1.  
2.  
3.  
Measure the distance between the inside of the two selected stud beams.  
Most beams have a distance of about 14" to 16". This is too narrow to  
accommodate the 17.072" (43.36 cm) wide CB-TP17 Rough-In Box.  
Determine whether one or both of the selected stud beams must be  
notched (FIG. 2). The determining factor is the flush alignment of the  
mounting tabs along the outside of the post-wall sheetrock.  
Connect the terminal RJ-45, Ethernet, and any optional audio/video wiring  
to their respective locations (outside the Rough-In Box) on either the AVB  
breakout box, Ethernet port, or NetLinx Master.  
10. Reconnect the terminal power connector on the PSN and apply power.  
Do not use these  
Cutout the notched beam using a height of 13.554" (34.43 cm) (as shown  
in FIG. 2) and a depth equal to the thickness of the drywall.  
Stud  
tabs to mount  
Support block  
C - Optional  
the Rough-In Box  
Note: The determining factor in the depth of the cut into the beam is the  
thickness of the drywall. The mounting tabs MUST BE FLUSH against the  
drywall and therefore, the depth of the notch depends on that thickness.  
Four #8 flat-head  
CB-TP17  
Mounting Screws  
(not included)  
secure the NXD to  
CB-TP17  
4.  
Insert one side of the Rough-In Box into the indention on the notched stud  
and rest the other side of the box against the opposite beam.  
Install and secure a shorter horizontal beam below the Rough-In Box. This  
beam acts to support the weight of the box from below and should be  
secured to both vertical beams (at the sides).  
5.  
6.  
7.  
Fasten the CB-TP17 to the Notched stud/beam through the stud fastening  
holes, located on the inside of the Rough-In Box (FIG. 3), by using either  
nails or screws.  
Insert a perpendicular block between the Non-Notched stud/beam and  
the Rough-In Box. This block acts as a bridge to secure the stud/beam to  
the CB-TP17 along the stud fastening holes located inside of the box.  
Secure the perpendicular block to the Non-Notched stud/beam (FIG. 3)  
by using either nails or screws.  
8.  
9.  
Fasten the CB-TP17 to the block through the stud fastening holes, located  
on the inside of the Rough-In Box (FIG. 3), by using either nails or screws.  
10. Remove any necessary wiring knockouts from the (optional) Rough-In Box  
(CB-TP17) (FIG. 3) where the necessary cables are threaded through for  
connection to the touch panel.  
Mounting Tab  
B - Main NXD unit consists of  
the touch panel and backbox housing  
A - Faceplate  
11. Thread the incoming RJ-45, Ethernet, and any other audio/video wiring  
through the knockouts (use of the top or bottom knockouts are  
recommended with this installation).  
(bezel)  
FIG. 1 Wall Mount panel installation configuration of a CB-TP17  
12. Install the drywall/sheetrock before inserting the main NXD unit into the  
CB-TP17.  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Acer Laptop TravelMate 4400 User Manual
Acesonic Karaoke Machine DGX 212 User Manual
ADC Network Card D3LXC SCA100 User Manual
AeroGarden Greenhouse Kit 100629 User Manual
Amcor Air Conditioner AMC 10KM 410 User Manual
Atlas Sound Video Game Controller TSD RMK User Manual
Audiovox Remote Starter PRO 9272 User Manual
Barco Camera Lens R9849853 User Manual
Barco Home Theater System MGP D5 User Manual
Beko Refrigerator kqe 1050 User Manual