Weil McLain Boiler User Manual

Gas-fired  
water boiler  
Installation Manual  
Multiple-boiler systems with  
Weil-McLain Easy-Fit® piping  
• Selection data  
• Installation  
• Piping  
• Water treatment  
with  
This manual must only be used by a qualified heating installer/service technician.  
Before installing, read all instructions, including this manual, the Ultra Boiler  
Manual and all applicable Supplements. Consider all connections to the boilers  
before selecting a location and layout. Failure to comply could result in severe  
personal injury, death or substantial property damage.  
Part No.550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Hazard definitions  
The following defined terms are used throughout this manual to bring attention to the presence of hazards of  
various risk levels or to important information concerning the life of the product.  
Indicates presence of hazards that will  
cause severe personal injury, death or  
substantial property damage.  
Indicates presence of hazards that will or  
can cause minor personal injury or  
property damage.  
Indicates presence of hazards that can  
cause severe personal injury, death or  
substantial property damage.  
Indicates special instructions on  
installation, operation or maintenance  
that are important but not related to  
personal injury or property damage.  
Selection data  
Controls  
Weil-McLain offers an excellent selection of boiler sequencing controls. Refer to individual manuals for details.  
Domestic hot water  
Refer to Weil-McLain Piping Guides and PLUS Water Heater Manual and Ultra PLUS Supplement for suggested  
piping diagrams.  
Venting and combustion air  
Ultra boilers must be vented individually. Combustion air must be piped to the boiler as well, but  
may be manifolded as shown on page 13. Follow Weil-McLain Ultra Boiler Venting Supplement and  
Boiler Manual plus information in this manual. Failure to comply will result in severe personal injury  
or death.  
Additional considerations  
1. Review the Ultra Boiler Manual and applicable supplements prior to designing and installing multiple-  
Ultra-boiler jobs.  
2. Ultra boilers are design-certified for installation on combustible flooring (not carpet).  
3. Ultra boilers are tested for 30 P.S.I. working pressure (higher pressure not available).  
4. For systems requiring greater than 30 P.S.I. relief valve setting, install a heat exchanger to isolate the boilers from  
the main system. See page 12 for suggested piping.  
5. Maximum operating temperature of each boiler is 190°F.  
This manual provides general guidelines for piping and installation. Your installation must comply  
with all applicable local codes.  
When using isolation valves on each boiler, some codes may require providing a low water control  
and additional limit for each boiler. If desired, consult the codes to determine if exclusion of the  
individual boiler isolation valves may allow the use of a single water level control and additional  
limit for the entire multiple boiler system.  
3
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Ratings and engineering data  
Figure 1  
Ratings and engineering data (see page 5 for notes)  
DOE  
4
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Figure 1  
Ratings and engineering data (continued)  
For simplicity, the table on page 4 lists only systems using multiples of the same Ultra boiler module.  
Any combination of Ultra boilers can be installed as a multiple boiler system.  
Water header piping  
Determine the flow rate that the system header and other  
pipes will handle. Then use the table at right to determine  
the minimum pipe size. This table shows pipe sizing both  
for 350 and 500 milinches per foot head loss. Other pipe  
sizing using recognized engineering would be acceptable.  
Gas piping  
See pages 14 and 15 for gas piping requirements and  
connections.  
Notes  
1. Based on standard test procedures outlined by DOE for 5. Ultra-230 boilers can be vented with 3-inch vent instead  
individual boilers.  
of 4-inch, with the limitations described in the Ultra Boiler  
Vent Supplement. (Using the smaller vent pipe reduces  
maximum allowable run.)  
2. Net I=B=R ratings are based on piping and pickup allow-  
ance of 1.15. Consult Technical Services for other allow-  
ances.  
All Ultra installations require a separate vent pipe and  
termination for each boiler. Vent piping cannot be  
manifolded. Install and terminate vents as described in  
the Ultra Boiler Vent Supplement.  
3. Foundation sizes above provide 6 inches between boilers  
and 2 inches from boiler to edge of foundation. Smaller  
foundations are possible with reduced service clearances.  
See Ultra Boiler Manual for details.  
Combustion air piping can be individually piped or  
manifolded, as described on page 13. See Ultra BoilerVent  
Supplement for individual air piping.  
For side-to-side installations, see Figure 3, page 7.  
For back-to-back installations, see Figure 4, page 7.  
4. Operating weight is the total weight, including water.  
6. Total amp requirements include boiler circulators.  
5
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Dimensions  
Figure 2  
Dimensional data  
Notes  
1. Boiler supply and return tappings are both 1" NPT.  
Connect to headers with 1” pipe for Ultra-80 and  
Ultra-105; 1¼" pipe for Ultra-155 and Ultra-230.  
For wall-hung boilers, water piping and gas pipe  
can be routed through bottom of enclosure using  
wall-mounting kit.  
2. Boiler circulator is shipped loose. Mount  
boiler circulator in connecting piping  
as shown in this manual. Boiler is  
shipped with 1" and 1¼" circulator  
flanges.  
3. Relief valve is shipped loose. See Boiler  
Manual pages 14 and 15 for mounting  
details. Relief valve mounts on ¾" street  
elbow connected to 1" x 1" x ¾" tee on  
boiler supply pipe, as shown in manual.  
6
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Placement and mounting information  
Placement, general  
Figure 3  
Side-to-side installation of multiple Ultra-80/-105/-155/-230 boilers  
1. Locate multiple boilers in boiler  
room according to:  
• Figure 3 (side-to-side), or  
• Figure 4 (back-to-back).  
For wall mounting, see below.  
2. Provide indicated clearances  
around boilers for access and  
servicing. If recommended di-  
mensions are not possible, re-  
fer to Ultra Boiler Manual for  
minimum clearances. Also fol-  
low local codes.  
3. Construct boiler foundation if  
boiler room floor is uneven or  
if there is a danger of flooding.  
Size foundation to allow for  
clearance and spacing dimen-  
sions shown in either Figure 3  
or Figure 4.  
Figure 4  
Back-to-back installation of multiple Ultra-80/-105/-155/-230 boilers  
4. Chalkline boiler locations on  
foundation or boiler room  
floor.  
5. Uncrate, assemble and mount  
boilers according to Ultra  
Boiler Manual.  
6. Provide clearance for installa-  
tion of venting, air piping, gas  
piping, expansion tank, primary  
circulator and other accessories.  
Wall mounting  
1. Ultra boilers may be wall  
mounted, following the instruc-  
tions in the Ultra Boiler Manual  
and the Wall Mounting Supple-  
ment.  
2. When wall mounting boilers,  
provide approximately 6 inches  
between boilers for easy re-  
moval of boiler jacket door. See  
Figure 5.  
Figure 5  
Wall mounting multiple Ultra-80/-105/-155/-230 boilers  
3. Follow all applicable codes re-  
garding piping, electrical con-  
nections and clearances.  
4. When wall mounting boilers,  
verify the wall construction is  
suitable for the structural load.  
7
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Easy-Fit® Piping  
Easy-Fit® Piping installation  
1. Main header and Easy-Fit® Manifold pipe sizing.  
Figure 6  
Single-sided connection —  
Maximum connected boiler output:  
2-inch manifolds — 450 MBH  
3-inch manifolds — 1400 MBH  
4-inch manifolds — 2900 MBH  
a. New system:  
Refer to Figure 1 on pages 4 and 5 for recommendations.  
b. Replacing boilers in an existing system:  
Without reducing size, connect system supply and return lines.  
Install tees or crosses for Easy-Fit® Manifolds as shown in Figure 6  
or 7. Size manifolds to handle total connected boiler ouput as shown.  
2. Provide connections in main header for Easy-Fit® Manifolds as close as  
possible to the midpoint of multiple boilers.  
a. Use tees for four or less boilers, as in Figure 6.  
b. Use either tees (Figure 6) or crosses (Figure 7) for five or more boil-  
ers.  
3. Manifold placement:  
a. To alternate spacing for supply and return lines to boilers, reverse the  
short-end and long-end of the Manifolds as shown in Figures 6 and  
7.  
b. Return Manifold must be on the return side of the main and Sup-  
ply Manifold must be on the supply side of the main. Drawings in  
this manual show flow in system main from right to left. For sys-  
tem flowing left to right, reverse the locations of the Manifolds  
accordingly.  
4. Connect from Easy-Fit® Manifold branches to boiler supply and re-  
turn connections using 1¼" nominal copper tubing or steel pipe (maxi-  
mum run 15').  
5. Provide a flow/check valve in the supply piping of each boiler as shown  
in piping diagrams in this manual. Install an isolation valve on the  
supply and return of each boiler as shown. Some local codes may re-  
quire the use of individual level controls and limits on each boiler  
when isolation valves are installed.  
Figure 7  
Double-sided connection —  
Maximum boiler output (each side):  
2-inch manifolds — 450 MBH  
3-inch manifolds — 1400 MBH  
4-inch manifolds — 2900 MBH  
6. Install main system air eliminator and primary circulator in supply  
piping as shown in piping diagrams. Place expansion tank on suction  
side of system circulator as shown.  
7. Install condensate drain line piping according to Ultra Boiler Manual.  
Condensate drain piping may be connected into a manifold before  
connection to a floor drain.  
8. Install system accessories as shown in drawings.  
9. For some applications, it may be necessary to install a heat exchanger  
as shown in Figure 11, page 12, to isolate the boilers from the system. See  
notes on page 12 for typical applications.  
10. Piping recommendation drawings:  
a. Figures 6 and 7 show details of Easy-Fit® Manifolds.  
b. Figure 8 is a schematic piping drawing showing the locations of typi-  
cal boiler piping and system piping, including limits and other de-  
vices often required by local codes.  
c. Figures 9 and 10 are three-dimensional piping drawings of typical  
multiple boiler installation.  
d. Figure 11 shows recommended piping when an isolating heat ex-  
changer is needed.  
11. If desired, other primary/secondary piping arrangements can be used.  
8
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Figure 8  
Piping schematic — Typical piping for multiple Ultra boilers, using Weil-McLain Easy-Fit® Manifolds  
1
Flow/check valve (each boiler)  
8 System air eliminator  
9 System automatic air vent  
10 Pressure reducing valve  
15 Low water cutoff (when used) (place above  
primary header)  
2 Isolation valves (when used)  
16 Water flow switch (when used)  
17 Boiler circulator (each boiler)  
18 System supply  
3 Cap  
4 Easy-Fit® Manifold (supply), sized per Fig. 6  
11 Check valve or backflow preventer, as  
or Fig. 7, page 8  
required by applicable codes  
5 Easy-Fit® Manifold (return), sized per Fig. 6  
12 Isolation valve  
13 Cold water supply  
19 System return  
or Fig. 7, page 8  
20 Boiler relief valve and discharge piping, installed  
6 Primary circulator  
7 Expansion tank (diaphragm type)  
per Ultra Boiler Manual  
14 Supply water temperature control (when  
used)  
This manual provides general guidelines for piping and installation.Your installation must comply with all applicable local  
codes.  
When using isolation valves on each boiler, some codes may require providing a low water control and additional  
limit for each boiler. If desired, consult the codes to determine if exclusion of the individual boiler isolation valves  
may allow the use of a single water level control and additional limit for the entire multiple boiler system.  
9
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Easy-Fit® Piping  
(continued)  
Figure 9  
Typical piping for multiple Ultra boilers, using Weil-McLain Easy-Fit® Manifolds  
1
Flow/check valve (each boiler)  
6 Primary circulator  
18 System supply  
2 Isolation valves (when used)  
7 Expansion tank (diaphragm type)  
8 System air eliminator  
9 System automatic air vent  
13 Cold water supply  
19 System return  
3 Caps  
20 Boiler relief valve and discharge piping,  
installed per Ultra Boiler Manual  
4 Easy-Fit® Manifold (supply), sized per Fig. 6  
or Fig. 7, page 8  
5 Easy-Fit® Manifold (return), sized per Fig. 6  
17 Boiler circulator (each boiler)  
or Fig. 7, page 8  
10  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Figure 10 Typical piping for multiple Ultra boilers, Weil-McLain Easy-Fit® Manifolds, and indirect water heaters  
Suggested DHW boiler-side pipe sizing (based  
on 500 milinch per foot head loss in piping):  
0 – 7 gpm .......................... 1 inch  
7 – 16 gpm ........................ 1¼ inch  
16 – 24 gpm ...................... 1½ inch  
24 – 45 gpm ...................... 2 inch  
45 – 75 gpm ...................... 2½ inch  
75 –140 gpm ..................... 3 inch  
140 – 290 gpm .................. 4 inch  
1 Flow/check valve (each boiler)  
2 Isolation valves (when used)  
3 Caps  
17 Boiler circulator (each boiler)  
18 System supply  
19 System return  
25 DHW boiler-side supply Easy-Fit® Manifold  
26 DHW boiler-side return Easy-Fit® Manifold  
27 Flow/check valves (to prevent induced or  
gravity flow in heating system or DHW piping)  
4 Easy-Fit® Manifold (supply), sized per Fig. 1  
20 Boiler relief valve and discharge piping,  
or Fig. 2, page 6  
installed per Ultra Boiler Manual  
28 Check valve to prevent heat migration in  
heating system  
5 Easy-Fit® Manifold (return), sized per Fig. 1  
21 Indirect-fired storage water heaters (Weil-  
McLain PLUS Line shown) — Example is  
shown with reverse-return boiler-side piping  
using a single circulator. Alternate: each water  
heater could have its own circulator.  
22 Boiler water inlet  
23 Boiler water outlet  
or Fig. 2, page 6  
29 See water heater manual for DHW piping —  
The DHW piping must also be manifolded  
together since the boiler-side piping is  
manifolded. If DHW heaters supply separate  
DHW circuits, provide an individual circulator  
for each water heater, and control each  
circulator by its water heater’s aquastat.  
6 Primary circulator  
7 Expansion tank (diaphragm type)  
8 System air eliminator  
9 System automatic air vent  
13 Cold water supply  
24 DHW boiler-side circulator  
This piping is suggested only. The layout above should be controlled with a boiler sequencing panel that provides DHW operation as  
well. Wire the heating system circulator to operate only on call for heat. Alternatively, use the boiler sequencing panel to provide  
domestic priority by disabling the heating system circulator any time there is a DHW call for heat. The boiler circulators, item 17, must  
operate on any call for heat, whether heating system or DHW. Offset the DHW boiler-side supply and return manifolds as shown so  
the total run of pipe and fittings to each of the water heaters is approximately equal.  
11  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Easy-Fit® Piping  
(continued)  
Figure 11 Typical piping for multiple Ultra boilers, using Weil-McLain Easy-Fit® Manifolds and heat exchanger  
Use isolation heat  
exchanger for:  
1. Large volume systems with high  
mineral content in water.  
2. Systems exposed to untreated quan-  
tities of makeup water.  
3. Old systems severely contaminated  
with scale and rust buildup inside  
piping and heat distribution units.  
4. Process applications.  
5. Commercial service water applica-  
tions.  
6. High water pressure applications,  
requiring pressure relief setting in  
heating system more than 30 PSIG  
(tall buildings). See notes below.  
1 Flow/check valve (each boiler)  
2 Isolation valves (when used)  
3 Cap  
9 System automatic air vent  
13 Cold water supply connections  
17 Boiler circulator (each boiler)  
18 Heating system supply  
flow and temperatures must meet heating  
system requirements.  
2. Contact heat exchanger manufacturer for  
sizing heat exchanger.  
3. Heat exchanger shellside circuit requires  
its own expansion tank as shown.  
4. Heating system circuit requires its own ex-  
pansion tank, as shown, plus its own re-  
lief valve set to protect heating system and  
heat exchanger piping and components.  
4 Easy-Fit® Manifold (supply), sized per Fig. 6  
or Fig. 7, page 8  
19 Heating system return  
5 Easy-Fit® Manifold (return), sized per Fig. 6  
20 Boiler relief valve and discharge piping,  
or Fig. 7, page 8  
installed per Ultra Boiler Manual  
6a Heating system circulator (exchanger  
tubeside)  
Notes:  
6b Heat exchanger shellside circulator  
1. Contact heat exchanger manufacturer for  
heat exchanger shellside and tubeside pip-  
ing and circulator requirements. Tubeside  
5. When individual isolation valves are used,  
individual boiler and level controls may  
be required.  
7
Expansion tanks (diaphragm type)  
8 System air eliminator  
12  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Combustion air & vent piping installation  
Vent piping  
Combustion air manifolds  
1. When combustion air supplied from a common air  
manifold pipe as in Figure 12, size the common air  
duct and louver free area from the minimum free  
area given in Figure 1, pages 4 and 5.  
1. Each boiler requires an individual vent pipe, in-  
stalled and terminated per the Ultra Boiler Manual  
and Ultra Boiler Venting Suppments.  
2. The vent pipes of multiple boilers must terminate on  
the same side of the building as their air inlet piping,  
and per all requirements of the Ultra Boiler Manual  
andVent Supplements.  
2. All joints must be sealed.  
3. The air inlet must be located:  
at least 3 feet below any vent located within 10  
feet.  
Combustion air piping  
the louver bottom must be 12 inches above grade  
or above the snow line.  
1. Provide combustion air piping to each boiler, fol-  
lowing all requirements for installation and termi-  
nation per the Ultra Boiler Manual and Ultra Boiler  
Venting Supplements.  
4. Compensate for louver blockage when calculating  
free air openings. Refer to manufacturer’s instruc-  
tions for size. If unknown use:  
a. Wood louvers — 20-25% free area.  
b. Metal louvers or grilles — 60-75% free area.  
2. Combustion air piping can be supplied from a  
common combustion air manifold, installed and  
terminated as shown in Figure 12, below.  
5. Lock open louvers or interlock with boiler controls  
to open automatically with boiler operation.  
Figure 12 Manifolding combution air piping  
13  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Gas piping  
Connecting gas supply piping  
3. Support piping with hangers, not by boiler or its  
accessories.  
1. Remove jacket front panel and refer to Figure 13 to  
pipe gas to boiler.  
a. Install ground joint union for servicing, when  
required.  
4. Purge all air from gas supply piping.  
5. Before placing boiler in operation, check boiler and  
its gas connection for leaks.  
b. Install manual shutoff valve in gas supply pip-  
ing outside boiler jacket when required by lo-  
cal codes or utility requirements.  
a. Close manual main shutoff valve during any  
pressure testing at less than 13" w.c.  
c. In Canada — When using manual main shut-  
off valve, it must be identified by the installer.  
b. Disconnect boiler and gas valve from gas sup-  
ply piping during any pressure testing greater  
than 13" w.c.  
2. Wall-mounted boilers  
a. Refer to separate Ultra Boiler Wall-mounting  
instructions.  
b. Gas connection may enter from the bottom of  
boiler as explained in the Wall-mounting in-  
structions.  
Do not check for gas leaks with an open  
flame — use bubble test. Failure to use  
bubble test or check for gas leaks can cause  
severe personal injury, death or  
substantial property damage.  
6. Use pipe dope compatible with propane gases.  
Apply sparingly only to male threads of pipe joints  
so that pipe dope does not block gas flow.  
Figure 13 Connecting gas supply piping  
Failure to apply pipe dope as detailed  
above can result in severe personal injury,  
death or substantial property damage.  
DO NOT adjust or attempt to measure  
gas valve outlet pressure. The gas valve is  
factory-set for the correct outlet pressure.  
This setting is suitable for natural gas and  
propane, requiring no field adjustment.  
Attempting to alter or measure the gas  
valve outlet pressure could result in  
damage to the valve, causing potential  
severe personal injury, death or  
substantial property damage.  
Ultra boilers are shipped ready to fire  
natural gas ONLY. You must install the  
propane orifice if the boiler will be  
connected to propane. Failure to comply  
could result in severe personal injury,death  
or substantial property damage.  
Use two wrenches when tightening gas piping at boiler, using one wrench to prevent the boiler gas  
line connection from turning. Failure to support the boiler gas connection pipe to prevent it from  
turning could damage components.  
14  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Common gas piping installation  
1. Construct gas header for multiple boilers using Figure 14 and  
the sizing tables below.Refer to the National Fuel Gas Code for  
other conditions.  
4. Size gas piping from meter outlet to entrance of gas header in  
accordance with Tables 1 and 2 below. For gases with other  
specific gravity or for different pressure drop or other pipe  
sizes, refer to the National Fuel Gas Code or applicable local  
codes.  
2. Provide manual shutoff gas valve and ground joint union as  
shown in Figures 13 and 14 for each boiler.When gas line en-  
ters from top of the boilerl, the boiler internal gas piping pro-  
vides a drip leg. See boiler manual for details.  
Pipe lengths in Table 1 are equivalent length of straight pipe.  
Convert pipe fittings to equivalent lengths using data from  
Table 2.  
3. A ¾" NPT gas piping riser from header to boiler will be  
large enough for most jobs. Check pressure drop.  
5. Refer to page 14 of this manual and to the Ultra Boiler Manual  
for testing gas piping.  
Figure 14 Common gas piping, with manifolded gas header  
Table 1  
Capacity of gas piping for gas at 0.60 specific  
gravity at a pressure drop of 0.30 inches w.c.  
Table 2  
Equivalent lengths of straight pipe  
for typical gas line fittings  
15  
Part number 550-101-232/0703  
GAS-FIRED WATER BOILER Installation Manual — Multiple-boiler Systems  
Additional instructions  
Air for boiler room ventilation  
1. Follow instructions in Ultra Boiler Manual to ensure the boiler room provides sufficient  
air infiltration.  
Wiring  
1. Refer to boiler sequencing control instructions and Ultra Boiler Manual for wiring re-  
quirements.  
Water treatment  
Multiple boilers used with large water volume systems will require water  
softening and conditioning. Consult a local water treatment company prior to  
installation for analysis and recommendations.  
Initial fill water may contain enough minerals to produce damaging deposits.  
Additional untreated makeup water will increase scale buildup.  
Contamination may also come from scale and rust buildup inside the piping  
and heat distribution units of an older boiler system replaced with small multiple  
boiler units. The result can lead to loss of efficiency and component failure.  
1. Follow proper start-up procedure for flushing any contaminants from the entire system  
before initial fill.  
2. Hot water systems should not require makeup water after initial fill. Use manual feed  
water systems or install a water meter to detect leaks.  
3. Repair leaks — constant fill water will cause problems.  
4. Refer to Ultra Boiler Manual for more information.  
16  
Part number 550-101-232/0703  

Weil McLain WGO User Manual
Vinotemp VT BD User Manual
Sunbeam PB7900 User Manual
Stiga ST1200 User Manual
Sony XCD MV6 User Manual
Sony Camcorder TRV119 User Manual
Sony DSR 200 User Manual
Sharp AQUOS BD HP21U User Manual
Scientific Atlanta Cable Box 3100HD User Manual
Samsung ST80 User Manual