Form No. 1920
(Rev. 02/08)
Bryan “Flexible Water Tube”
CLM Series
Steam & Water Boilers
900,000 to 3,000,000 BTUH
Atmospheric gas fired
Steam Boiler
CLM-150-S150-GI
Water Boiler
CLM-300-W-GI
®
BRYAN BOILERS
Originators of the “Flexible Water Tube” design
Low initial cost, high operating efficiency
deliver substantial return on investment
• True “flexible water tube” design guaranteed
shock free
• Longer service life with superior performance
• Full five sq ft of heating
G
surface per BHP
I
L
Quality Construction Features
B
A. Heavy steel boiler frame, built and stamped
in accordance with the appropriate ASME
boiler code.
J
F
C
B. Large volume water leg downcomers pro-
mote rapid internal circulation, temperature
equalization and efficient heat transfer.
D
E
C. Bryanbentwatertubesareflexible,individu-
ally replaceable without welding or rolling.
Never more than two tube configurations.
A
K
H
D. Boiler tube and furnace area access panel:
heavy gauge steel casing with 2" high tem-
peratureceramicfiberandinsulation,bolted
and tightly sealed to boiler frame.
E. Jacket access panels make the interior of the boiler
easily accessible for service and inspection.
F. Heavy gauge steel boiler jacket with rust-resistant
zinc coating and attractive enamel finish, insulated
with 1½" fiberglass to insure exceptionally cool outer
surface.
J. Control panel: all controls installed and connected
to terminal strip.
K. Watersideorsteamsideinterioraccessibleforclean-
out and inspection, front and rear openings, upper
and lower drums.
G. Minimum sized flue vent.
I. Allcontrols,gauges,reliefvalve(s)arefactoryinstalled
L. Steam boilers with extra large drum with high steam
and wired and easily accessible for servicing.
release area ensure stable water level and dry steam.
Bryan CLM Series Boilers Standard and Optional Equipment
ignition assembly, main manual gas
shut-off valve, pilot shut-off valve,
pilot and main gas pressure regula-
tors, barometric draft controller, all
controls installed and wired standard
voltage 120/1/60.
9. Lead-lag systems for two or
more boilers with or without
outdoor reset control
10. Heat exchanger coils for
domestic water
11. Special construction: left hand,
Knocked Down
STANDARD EQUIPMENT
FURNISHED
Water Boiler
When ordering, please
specify:
1. Boiler size
Combination thermometer and pres-
sure gauge, ASME-rated boiler relief
valve, water temperature control
(240°F max. std.), high limit control,
probe LWCO.
2. Supply and return
temperatures required
OPTIONAL EQUIPMENT:
1. Manual reset high limit control
2. Manual reset low water cutoff
3. Auxiliary low water cutoff (water)
4. Combination low water cutoff
and feeder
3. Boiler relief valve setting
OPTIONAL
CONSTRUCTION:
Steam boiler
OptionalconstructiontoASMEPower
BoilerCoderequirementsforpressure
exceeding150psitomaximumof300
psi design pressure.
4. Type of fuel: natural
or LP, BTU content,
specific gravity and
pressure available
Steam Boiler
Steam pressure gauge, steam pres-
sure control, combination low water
cutoffandpumpcontrol,auxiliarylow
water cutoff with manual reset, high
limit pressure control, ASME-rated
boiler relief valve, water glass set.
5. Alarm bells or horns
5. Optional extra equip-
ment or construction
6. UL, CUL, CSD-1, FM, IRI or
other insurance approved
control systems
7. Low fire start, Hi-Lo or
modulation fire control
Hot water boiler
6. Special approvals re-
quired (UL, CUL,
Optional construction to ASME
Power Boiler Code requirements for
temperaturesexceeding240°Fand/or
pressure exceeding 160 psi to maxi-
mum of 285°F operating and 300°F
design temperature and 250 psi.
Atmospheric equipment
CSD-1, FM or IRI)
Electroniccombustionsafetycontrol,
automaticoperatinggasvalve,safety
gasvalve,pilotsolenoidvalve,electric
8. Indicating lights, as desired
7. Altitude
Bryan CLM Series Steam & Hot Water Boilers
STEAM BOILER DIMENSIONS in inches (cm)
A
B
C
D
E
F
G
H
I
J
K
L
Supply
Boiler
Model
Length
of
Gas Train
Connection
(Approx.)
Width
Outside
Jacket
Min. Tube
Removal
Height
Over
Height Floor to
Over Flow
Jacket Nozzle
Flue
Flue Overall
Feed
Nozzle
Location Size Length
Conn.
Number
Jacket
15 psi
150 psi
Clearance
Barometric
411/2
203/4
14
551/2
11/4 NPT
(3.18)
4 FLG
(10.20)
6 FLG
(15.24)
6 FLG
(15.24)
6 FLG
(15.24)
6 FLG
(15.24)
6 FLG
(15.24)
6 FLG
(15.24)
6 FLG
(15.24)
2 NPT 11/2 NPT 383/8
(5.10) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
3 NPT 11/2 NPT 383/8
(7.62) (3.81) (97.47)
30
(76.2)
30
(76.2)
30
(76.2)
30
(76.2)
30
(76.2)
30
(76.2)
30
(76.2)
785/16
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
685/16 711/2
(173.51) (181.61)
CLM-90-S
(105.40) (52.70) (35.60) (141.0)
(198.90)
5011/16 2511/32
(128.74) (64.37) (40.64) (164.30)
5911/16 2927/32 7311/16
18
(151.60) (75.80) (45.72) (187.16)
691/8 349/16 831/8
20
(175.57) (87.78) (50.80) (211.13)
783/8 393/16 923/8
20
(199.07) (99.53) (50.80) (234.63)
88 44 20 102
(223.52) (111.76) (50.80) (259.08)
97 20 111
481/2
(246.38) (123.19) (50.80) (281.94)
16
6411/16
11/4 NPT
(3.18)
7913/16
CLM-120-S
(202.72)
11/2 NPT
(3.81)
805/16
(203.99)
8013/16
CLM-150-S
CLM-180-S
2 NPT
(5.08)
2 NPT
(5.08)
2 NPT
(5.08)
(205.26)
815/16
CLM-210-S
CLM-240-S
CLM-270-S
CLM-300-S
(206.53)
8113/16
(207.80)
2 NPT
(5.08)
825/16
(209.07)
1065/8
533/16
20
1205/8
21/2 NPT
(6.35)
30
(76.2)
8213/16
(270.82) (135.09) (50.80) (306.38)
(210.34)
E
WATER BOILER DIMENSIONS in inches (cm)
A
B
C
D
E
F
G
H
I
J
K
L
Boiler
Model
Length
of
Gas
Train
Width Min. Tube
Outside Removal
Jacket Clearance
Height
Over
Height Floor to
Flue
Flue
Overall
Length
Supply
Nozzle
Return
Nozzle
Over
Flow
Location Size
Number
Jacket
Connection
Barometric
Jacket
Nozzle
411/2
203/4
14
551/2
11/4 NPT
(3.18)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
3 NPT
(7.62)
345/8
(87.31)
345/8
30
(76.2)
30
7015/16
(180.20)
727/16
6015/16
651/16
CLM-90-W
(105.40) (52.70) (35.60) (141.0)
(154.78) (165.25)
5011/16 255/16
16
(128.74) (64.29) (40.64) (164.30)
5911/16 2913/16 7311/16
18
(151.60) (75.72) (45.72) (187.16)
691/8 349/16 831/8
20
(175.57) (87.78) (50.80) (211.13)
783/8 393/16 923/8
20
(199.07) (99.53) (50.80) (234.63)
88 44 22 102
(232.52) (111.76) (55.88) (259.08)
97 22 111
481/2
(246.38) (123.19) (55.88) (281.94)
1065/8 533/16 1205/8
22
(270.82) (135.41) (55.88) (306.38)
6411/16
11/4 NPT
(3.18)
60115
/
651/16
(87.31)
(76.2)
(183.48)
(154.7186) (165.25)
CLM-120-W
11/2 NPT
(3.81)
345/8
30
(76.2)
30
(76.2)
30
(76.2)
30
(76.2)
7215/16
6015/16
651/16
CLM-150-W
CLM-180-W
CLM-210-W
CLM-240-W
CLM-270-W
CLM-300-W
(87.31)
(185.25)
(154.78) (165.25)
2NPT
(5.08)
2NPT
(5.08)
2NPT
(5.08)
2NPT
(5.08)
345/8
737/16
60115
/
651/16
(87.31)
(186.52)
(154.7186) (165.25)
345/8
7315/16
6015/16
651/16
(87.31)
(187.79)
(154.78) (165.25)
6015/16 651/16
(154.78) (165.25)
6015/16 651/16
(154.78) (165.25)
345/8
747/16
(87.31)
(189.06)
345/8
30
(76.2)
7415/16
(87.31)
(190.33)
21/2 NPT
(6.35)
345/8
30
(76.2)
757/16
6015/16
651/16
(87.31)
(191.60)
(154.78) (165.25)
Specifications subject to change without notice. Consult factory to consult on other boiler options.
BryanSteamLLC— LeadersSince1916
783 N. Chili Ave., Peru, Indiana 46970 U.S.A.
Phone:765-473-6651
•
•
Form No. 1920
©2008 Bryan Steam LLC
Printed in USA
28-6833
|