Weil McLain Boiler 6 20 Series User Manual

Gas–fired boiler  
LGB  
Control Supplement  
Series 2 Propane gas  
CSD-1 Control System  
Contents  
I. New installation .......... 2  
II. Existing installation .... 4  
III. Water and steam trim  
components .................. 4  
IV. Gas piping ................... 5  
V. Wiring ........................... 5  
Sequence of operation ..... 8  
Wiringprocedure .............. 8  
VI. Leaktestprocedure ... 10  
VII. Operating instructions ..... 11  
VIII.Parts list ..................... 12  
Indicates presence of hazards that can cause severe personal injury,death or  
substantial property damage.  
These terms are used throughout this  
manual to bring attention to the  
presence of hazards of various risk  
levels or to important information  
concerning the life of the product.  
Indicates special instructions on installation, operation or maintenance that  
are important but not related to personal injury or property damage.  
This Control Supplement must only be used by a qualified installer/service  
technician. Read these instructions completely before beginning the  
installation. Failure to follow these instructions can cause severe personal  
injury, death or substantial property damage.  
Part Number 550-141-816/0798  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CSD-1ControlSystemPropanegas  
I
New installation  
– continued  
Figure 1  
Pilot burner assembly, typical  
Figure 2  
Main flame sensor assembly  
Part Number 550-141-816/0798  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
LGB-6 to LGB-20 Series 2 – Control Supplement  
II  
Existing installation Conversion from natural gas to propane gas  
This conversion is to be installed by a Weil-McLain distributor or other  
qualified agency in accordance with the manufacturer’s instructions and all  
codes and requirements of the authority having jurisdiction. Failure to  
follow instructions could result in serious injury or property damage. The  
qualified agency performing this work assumes responsibility for this  
conversion.  
For your safety, turn off electrical power supply before making any electrical  
connections to avoid possible electrical shock hazard.  
1. These instructions are for use with Propane Control Cartons as listed in Gas Control  
Arrangement, Table 2 (page 2).  
2. Remove jacket door(s) and access panel(s).  
3. Disconnect wiring and tubing from existing pilot burner and main flame sensor.  
4. Remove all burners. Remove 3.95 mm natural gas main burner orifices in manifold. Install  
2.40 mm propane gas main burner orifices. Use pipe dope sparingly only on male ends.  
Use pipe dope compatible with propane gases. Do not overtighten orifices.  
5. Remove and discard existing electronic pilot burner from pilot burner tube. Replace with  
electronic pilot burner in carton.  
6. Attach Q327 standing pilot to burner tube in kit. Connect pilot tubing and thermocouple  
to pilot.  
7. Re-install burners. See Table 1 (page 2) for location of pilot burners and flame sensor(s).  
8. Attach pilot switch box to jacket. See Figure 6 (page 12). Connect thermocouple to pilot  
switch box. Cut 60” pilot tubing into 2 pieces to make connections from tee in pilot line to  
pilot switch box and from pilot switch box to standing pilot.  
9. Remove natural gas valve train.  
10. Install propane gas valve train and fittings from carton (See page 5, section IV, paragraph  
4 of this Supplement).  
11. Re-install access panel(s).  
12. See Figure 6, page 12 for propane piping.  
13. Wire per wiring instructions and wiring diagrams, pages 5-9. Add splices as needed.  
14. Attach:  
a. 550-223-710 label at boiler operating instruction label. Place so that this label reads  
first.  
b. 550-223-796 label at rating label.  
c. Wiring diagram over diagram on door (one on each base).  
15. To place in operation, follow instructions on constant burner pilot light-up label and  
boiler operating label.  
16. Replace jacket doors.  
III  
Water and steam trim components  
1. Install water or steam trim components as required by CSD-1 latest edition. See the boiler  
manual for tapping locations.  
a. Water boilers require:  
a manual reset high temperature limit control in addition to the standard  
automatic reset limit control.  
a manual reset low water cutoff.  
b. Steam boilers require:  
a manual reset high pressure limit control in addition to the standard automatic  
reset limit control.  
a manual reset low water cutoff in addition to the standard automatic reset low  
water cutoff.  
4
Part Number 550-141-816/0798  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CSD-1ControlSystemPropanegas  
IV  
Gas piping  
1. Contact gas supplier to size pipes, tanks and regulator.  
a. Inlet gas pressure to manual main shut-off gas valve —  
minimum 11”W.C., maximum 13”W.C.  
b. If pressure to gas valve exceeds 13W.C., install 100% lock-up gas pressure regulator  
upstream of hand valve.  
2. Remove gas supply knockout disc from jacket panel.  
3. Follow good piping practices.  
4. Pipe joint compound (pipe dope) must be resistant to corrosive action of liquefied  
petroleum gases. Apply sparingly only to male threads of pipe joints.  
5. Install drip leg at inlet of gas connection to boiler. Where local utility requires, extend drip  
leg to floor.  
6. Install ground joint union when required for servicing.  
7. Support piping by hangers, not by boiler or its accessories.  
8. Purge all air from supply piping.  
9. Before operating boiler,check boiler and its gas connections for leaks.  
Do not check for gas leaks with an open flame – BUBBLE TEST. Failure to  
use bubble test or test for leaks can cause severe personal injury, death or  
substantial property damage.  
a. Close manual main shut-off valve during any pressure testing at less than 13W.C.  
b. Disconnect boiler and gas valve from gas supply piping during any pressure test  
greater than 13W.C.  
Wiring  
V
For your safety, turn off electrical power supply before making any electrical  
connections to avoid possible electrical shock hazard.  
1. All wiring must be installed in accordance with the requirements of the National Electrical  
Code and any additional national, state or local code requirements having jurisdiction. All  
wiring must be N.E.C. Class 1.  
2. The boiler must be electrically grounded in accordance with the National Electrical Code,  
ANSI/NFPA No. 70-latest edition. Use 105 °C. thermoplastic wire, or equivalent, if any of  
the original wire must be replaced (except for pilot spark, sense and ground wires).  
3. Supply wiring to the boiler must be No. 14 gauge or heavier. Install in conduit.  
4. A separate electrical circuit with a fused disconnect switch (15 amp. recommended) should  
be used for the boiler.  
5. Refer to wiring diagrams, Figure 3 (pages 6 and 7) and Figure 5 (page 9). See section,  
“Wiring procedure” on page 8.  
6. Figure 5 on page 9 is the Field Wiring Diagram. See Figure 3, pages 6 and 7, for the  
schematic and ladder wiring diagrams.  
Part Number 550-141-816/0798  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
LGB-6 to LGB-20 Series 2 – Control Supplement  
CSD-1ControlSystemPropanegas  
Figure 3  
Wiring diagram  
EQUIPMENT  
GROUND  
(NOTE 9)  
LADDER WIRING DIAGRAM  
H
SCHEMATIC WIRING DIAGRAM  
N
STEAM  
120 V.A.C.  
MANUAL  
RESET  
LOW WATER  
CUT-OFF  
MANUAL  
RESET  
LWCO  
NO.1 RED FLAME FAILURE LAMP  
LIMIT CIRCUIT  
HIGH  
LIMIT  
SERVICE SWITCH  
(BY OTHERS)  
OPERATING  
CONTROL  
MANUAL  
MANUAL  
RESET  
HIGH LIMIT  
(STEAM ONLY)  
LOW WATER RESET  
CUT-OFF LWCO  
OPERATING  
CONTROL  
HIGH  
LIMIT HIGH LIMIT  
PRIMARY  
MAIN FLAME  
PROVING MODULE  
PILOT PROVING  
MODULE  
MOMENTARY  
SWITCH  
R
C
MV  
MV/PV  
PV  
MV  
MV/PV  
PV  
24 V.A.C.  
PRIMARY  
PILOT  
SWITCH  
BOX  
R
IMPULSE  
RELAY  
ALARM  
ALARM  
24 V  
ALARM  
ALARM  
24 V  
R
C
24 V.A.C.  
MAIN FLAME  
SENSOR  
WIRE NUTS (4)  
JUNCTION  
BOX  
MAIN GAS VALVE HIGH FIRE  
OPERATOR (NOTE 5)  
FIRING RATE CONTROL  
(WHEN USED)  
PILOT  
(NOTE 8)  
24V (GND)  
SENSE  
24V (GND)  
SENSE  
MV  
MV/PV  
PV  
MV  
MAIN GAS VALVE LOW FIRE OPERATOR  
MV/PV  
A1  
A2  
WATER  
LIMIT CIRCUIT  
SEE  
NOTE 11  
N/A  
SPARK  
FROM TRANSFORMER  
THERMOCOUPLE  
R
MANUAL  
RESET  
LWCO  
MANUAL  
RESET  
HIGH LIMIT  
MV/PV  
(NOTE 5)  
PV  
ALARM  
ALARM  
24V  
HIGH GAS  
PRESSURE  
SWITCH  
MV/PV  
PV  
1
WIRE TIE  
CLIP  
SECONDARY GAS VALVE  
(WHEN USED)  
TERMINAL  
BLOCK  
HIGH GAS  
PRESSURE  
SWITCH  
PILOT  
SWITCH  
BOX  
1
2
A1  
A2  
(WHEN USED)  
24V  
(GND)  
PRE-WIRED PANEL  
TEMPERATURE  
OPERATING/LIMIT  
COMBINATION  
CONTROL  
MAIN FLAME SENSOR  
NOTE 6  
BK  
FIRING RATE CONTROL  
(WHEN USED)  
SENSE  
MV  
BL  
W
NO. 1 BASE  
MAIN FLAME PROVING MODULE  
THERMOCOUPLE  
NOTE 11  
MV/PV  
PV  
PILOT SOLENOID VALVE  
R
STANDING  
PILOT  
MAIN GAS VALVE - TWO  
STAGE COMBINATION  
VALVE W/REGULATOR  
MV  
MV/PV  
PV  
BL  
MV  
PV  
BL  
PILOT  
SOLENOID  
VALVE  
MV/PV  
W
ALARM  
FROM TRANSFORMER  
SECONDARY  
GAS VALVE  
W
BK  
ALARM  
24V  
NO. 1 BASE WIRING  
(SIZES 6 THRU 20)  
PILOT  
SWITCH  
BOX  
24V  
(GND)  
NO.2 RED FLAME FAILURE LAMP  
2
TO LIMIT CIRCUIT  
PILOT FLAME SENSOR  
SERVICE SWITCH  
(BY OTHERS)  
SENSE  
SPARK  
MAIN FLAME  
PROVING MODULE  
PILOT PROVING  
MODULE  
TRANSFORMER  
BK  
MOMENTARY  
SWITCH  
H
PILOT BURNER  
(NOTE 8)  
MV  
MV/PV  
PV  
MV  
MV/PV  
PV  
NO. 1 BASE  
PILOT PROVING MODULE  
FROM  
FUSED  
R
IMPULSE  
RELAY  
R
C
DISCONNECT  
120  
V.A.C.  
24  
V.A.C.  
ALARM  
ALARM  
24 V  
ALARM  
ALARM  
24 V  
N
THERMOCOUPLE  
MAIN GAS VALVE HIGH FIRE  
OPERATOR (NOTE 5)  
FIRING RATE CONTROL  
(WHEN USED)  
W
MAIN FLAME  
SENSOR  
MV  
MV/PV  
PV  
MV  
MAIN GAS VALVE LOW FIRE OPERATOR  
MV/PV  
PILOT  
(NOTE 8)  
A1  
A2  
SEE  
NOTE 11  
24V (GND)  
SENSE  
24V (GND)  
SENSE  
R
WIRE NUTS (3)  
N/A  
SPARK  
MV/PV  
PV  
(NOTE 5)  
ALARM  
ALARM  
24V  
HIGH GAS  
PRESSURE  
SWITCH  
PILOT  
SWITCH  
BOX  
MV/PV  
EQUIPMENT  
GROUND  
(NOTE 9)  
PV  
1
SECONDARY GAS VALVE  
(WHEN USED)  
HIGH GAS  
PRESSURE  
SWITCH  
WIRE TIE  
CLIP  
TERMINAL  
BLOCK  
24V  
(GND)  
(WHEN USED)  
MAIN FLAME SENSOR  
1
2
A1  
A2  
SENSE  
MV  
MV/PV  
PV  
PRE-WIRED PANEL  
NO. 2 BASE  
MAIN FLAME PROVING MODULE  
NOTE 6  
BK  
FIRING RATE CONTROL  
(WHEN USED)  
PILOT SOLENOID VALVE  
BL  
THERMOCOUPLE  
W
NOTE 11  
BK  
STANDING  
PILOT  
R
ALARM  
R
C
MAIN GAS VALVE - TWO  
STAGE COMBINATION  
VALVE W/REGULATOR  
MV  
MV/PV  
PV  
BL  
MV  
PV  
BL  
120  
V.A.C.  
24  
V.A.C.  
PILOT  
SOLENOID  
VALVE  
ALARM  
24V  
MV/PV  
W
SECONDARY  
GAS VALVE  
W
W
BK  
NO. 2 BASE WIRING  
24V  
(GND)  
2
WIRE NUTS (2)  
(SIZES 13 THRU 20)  
TRANSFORMER  
PILOT FLAME SENSOR  
SENSE  
SPARK  
LOW VOLTAGE FIELD  
HIGH VOLTAGE FIELD  
4. REFER TO CONTROL COMPONENT INSTRUCTIONS PACKED WITH BOILER FOR  
APPLICATION INFORMATION.  
ELECTRICAL SHOCK HAZARD, CAN CAUSE SEVERE INJURY OR DEATH.  
DISCONNECT POWER BEFORE INSTALLING AND/OR SERVICING.  
THERMOCOUPLE LEAD  
LOW VOLTAGE FACTORY  
HIGH VOLTAGE FACTORY  
IGNITION/SENSING CABLE  
PILOT BURNER  
(NOTE 8)  
MV/PV  
NO. 2 BASE  
PILOT PROVING MODULE  
5.  
TERMINAL ON MAIN GAS VALVE IS A SINGLE TERMINAL (COMMON)  
FOR LOW AND HIGH FIRE OPERATORS.  
NOTES:  
6. REFER TO CONTROL SUPPLEMENT FOR GROUND LEADWIRE ATTACHMENT.  
IF ORIGINAL GROUND LEADWIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED,  
TYPE 125 C OR ITS EQUIVALENT MUST BE USED.  
FACTORY WIRED TO CONTROL -  
FIELD WIRED TO GAS VALVE OR FIRING  
RATE CONTROL.  
1. ALL WIRING MUST BE INSTALLED IN ACCORDANCE WITH:  
A. U.S.A. - NATIONAL ELECTRICAL CODE AND ANY OTHER NATIONAL, STATE, OR LOCAL  
CODE REQUIREMENTS.  
Intermittent Pilot  
MAIN GAS VALVE TERMINAL.  
CONTROL MODULE TERMINAL.  
B. CANADA - C.S.A. C22.1 CANADIAN ELECTRICAL CODE PART 1 AND ANY OTHER  
NATIONAL, PROVINCIAL, OR LOCAL CODE REQUIREMENTS.  
7. WIRES ARE FACTORY INSTALLED TO CONTROL PANEL, BUT MUST BE FIELD  
CONNECTED TO GAS VALVES AND FIRING RATE CONTROL TERMINALS (WHEN USED).  
A United Dominion Company  
CSD-1 Control System  
Steam or Water  
6 thru 20  
LGB  
8. PILOT LEADWIRES ARE NOT FIELD REPLACEABLE. REPLACE PILOT ASSEMBLY IF NECESSARY.  
Weil-McLain  
500 Blaine St.  
Michigan City, IN 46360-2388  
2. ALL WIRING EXTERNAL TO BOILER JACKET MUST BE:  
A. U.S.A. - N.E.C. CLASS 1.  
B. CANADA - C.S.A. C22.1 C.E.C. PART 1.  
IGNITION CONTROL PANEL TERMINAL.  
TRANSFORMER TERMINAL.  
PANEL LAMP  
Propane Gas  
9.  
DENOTES FIELD INSTALLED CHASSIS GROUND.  
10. ALL CONTACTS SHOWN WITHOUT POWER APPLIED - OFF SHELF CONDITION.  
11. ALARM CONTACT RATINGS - 15 AMP @ 250 VAC.  
550-141-835/0798WM  
PART NUMBER  
3. IF ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED, TYPE  
105 DEGREES C OR ITS EQUIVALENT MUST BE USED. EXCEPTION, SEE NOTE 6.  
6
Part Number 550-141-816/0798  
Part Number 550-141-816/0798  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
LGB-6 to LGB-20 Series 2 – Control Supplement  
Wiring  
– continued  
V
Sequence of operation  
1. Operating control begins startup sequence.  
a. Limit control contacts are closed.  
2. Pilot proving module energized.  
a. Pilot solenoid opens.  
b. Pilot ignition spark begins.  
c. Pilot ignites.  
d. Pilot proves.  
On failure to sense pilot flame, the pilot-proving module will wait 5  
minutes, then retry for ignition. Upon 2 consecutive pilot flame failures,  
the control will lockout and illuminate the red lockout light.  
3. Main flame proving module energized from pilot proving module.  
a. Secondary gas valve opens.  
b. Main gas valve opens to low fire position.  
c. Main burners ignite at low fire.  
d. Main flame sensor proves low fire carryover.  
e. Main gas valve opens to high fire position.  
f. Main burners increase to high fire.  
On failure to sense main flame, the main flame-proving module will  
lockout and illuminate the red lockout light.  
4. For dual base assembly - operating control energizes controls for each base assembly at the  
same time. See steps 1 through 3 above.  
5. Boiler shuts down when operating control satisfied.  
If the boiler locks out, the alarm contacts on the terminal strip (terminals  
A1 and A2) close. These contacts are rated to 15 amps, 250 V. To reset the  
boiler, push the red lockout button.  
1. Determine right or left electrical supply wiring.  
Wiring procedure  
Figure 4  
2. Attach electrical junction box(es) to inside jacket end  
panel. Screws and nuts are provided. For dual base  
boilers, use offset nipples (provided) to connect  
junction boxes together (as at right), then hang  
junction boxes by screwing top box to boiler jacket.  
See Figure 4.  
Junction box assembly  
dual base boilers  
3. Attach control transformer(s) to junction box(es).  
4. Drill 1/8” hole in interior jacket panel midway between  
ignition control panel and left jacket panel. Mount  
wire support clip using sheet metal screw (furnished).  
5. Complete wiring per diagrams, Figure 3 (pages 6  
and 7) and Figure 5 (page 9).Terminate at secondary  
gas valve in valve junction box with wirenuts and  
strain relief provided.  
“Hot” side of line voltage to boiler  
must be wired directly to limit  
circuit, then fed to transformer  
primary(ies).  
Dual Base:Rterminal of  
secondaries are to supply power  
to bases independently of each  
other. Do not wireRterminals  
together.  
6. Install pilot proving and main flame proving ground  
connections as shown in Figures 1 and 2 and wiring  
diagram. Route wires through wire support clip.  
8
Part Number 550-141-816/0798  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CSD-1ControlSystemPropanegas  
Figure 5  
Field wiring diagram  
Part Number 550-141-816/0798  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
LGB-6 to LGB-20 Series 2 – Control Supplement  
VI  
Leak test procedure  
1. Remove red (MV) and blue (PV) wires from main gas valve.  
2. Close main test firing valve attached to the manifold.  
3. Check that both leak test valves are closed and remove plugs.  
4. Attach manometer to first leak test valve.  
5. Open first leak test valve and check for pressure.  
6. Close first leak test valve and remove manometer.  
7. Attach manometer to second leak test valve.  
8. Apply call for heat to boiler.  
9. Check that electronic pilot proves.  
10. Open second leak test valve and check for pressure.  
11. Close second leak test valve and remove manometer.  
12. Remove call for heat to boiler.  
13. Reinstall plugs on leak test valves.  
14. Connect wiring to main gas valve.  
15. Open main test firing valve attached to the manifold.  
When checking for pressure at the leak test valves, any small pressure  
reading is normal. If the pressure continues to increase after opening the  
leak test valve, the upstream valve is leaking and should be replaced.  
10  
Part Number 550-141-816/0798  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CSD-1ControlSystemPropanegas  
VII  
Operating instructions  
A. This boiler is equipped with a pilot which must be lighted by hand. When lighting the  
pilot, follow these instructions exactly. The gas supply to this pilot is controlled by Pilot  
switch box. This boiler is also equipped with an ignition device which automatically lights a  
second pilot. The gas supply to this pilot is controlled by the Gas control. Do not try to  
light this pilot by hand.  
B. BEFORE OPERATING THE MANUAL PILOT, smell all around the appliance area for gas.  
Be sure to smell next to the floor because some gas is heavier than air and will settle on the  
floor.  
WHAT TO DO IFYOU SMELL GAS  
Do not try to light any appliance.  
Do not touch any electric switch; do not use any phone in your building.  
Immediately call your gas supplier from a neighbor’s phone. Follow the gas  
supplier’s instructions.  
If you cannot reach your gas supplier, call the fire department.  
C. Do not use this appliance if any part has been under water. Immediately call a qualified  
service technician to inspect the appliance and to replace any part of the control system  
and any gas control, which has been under water.  
This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual. Follow  
all instructions in the Manual, including those regarding start-up (found in Section VIII,  
“Placing boiler in operation”).  
Starting  
boiler  
1. STOP! Read the safety information above.  
2. Set the Operating control to lowest setting.  
3. Turn off all electrical power to the appliance.  
4. Remove the Base access shield.  
5. Close the Pilot shut-off valve connected to Manual main shut-off valve.  
Close Manual main shut-off valve.  
6. Wait five (5) minutes to clear out any gas. Then smell for gas, including  
near the floor.If you smell gas,STOP! Follow“B”in the safety information  
above. If you don’t smell gas, go to the next step.  
7. Open the Pilot shut-off valve.  
8. Press and hold the reset lever on the Pilot switch box. Manually light the  
pilot while holding the lever down. Air in the gas supply line will have to  
purge through the line before sufficient gas will reach the pilot.  
9. After purging all air,hold the Pilot switch box lever for about 1 minute to  
heat the thermocouple.  
10. Release the Pilot switch box lever. The pilot should remain lit.  
11. Open the Manual main shut-off valve and follow the sequence below.  
12. This appliance is also equipped with an ignition device which automatically  
lights the second pilot. Do not try to light this pilot by hand.  
13. Turn on all electric power to the appliance.  
14. Set Operating control to desired setting.  
15. If the appliance will not operate, turn off gas to the appliance by closing  
the Manual main shut-off valve and Pilot shut-off valve. Call your service  
technician or gas supplier.  
16. Replace Base access shield and Front panel.  
Part Number 550-141-816/0798  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
LGB-6 to LGB-20 Series 2 – Control Supplement  
VIII  
Parts  
list  
Figure 6  
Ref. No.  
Description  
Size  
Vendor/Part Number  
Weil-McLain Part Number  
1
Main flame sensor  
Main burner with pilot bracket  
Main flame sensor bracket  
Honeywell 392956  
Weil-McLain  
Weil-McLain  
Kinco-Balon 500  
511-724-274  
512-200-055  
423-300-420  
511-246-325  
511-246-330  
511-044-191  
511-044-192  
511-044-346  
511-044-218  
383-300-410  
383-300-411  
512-200-055  
460-005-624  
511-330-086  
511-330-085  
510-350-226  
2
1"  
1 ¼"  
1"  
1 ¼"  
1"  
3
4
5
Manual main shut-off valve  
Secondary gas valve  
Main gas valve  
Kinco-Balon 600  
Honeywell V8943A1003  
Honeywell V8943A1111  
Honeywell V8944L1033  
Honeywell V8944L1041  
Weil-McLain  
Weil-McLain  
Weil-McLain  
Weil-McLain  
United Technologies 1003-615  
United Technologies 1003-60  
Potter-Brumfield S89R-11ABD1-24  
Honeywell AML21CBA2AA  
Eaton Controls ZZ1K11810K  
Honeywell AML51-C10R  
Eaton Controls ZZ0PM0ZA  
TI-¾ #85 (Available at Local Supply House)  
Honeywell V8046C1014  
Johnson Controls H91ABG  
Kinco-Balon P2R  
Johnson Controls L62GB-3C  
Honeywell Q309A  
Watts FBV3-06  
Watts FBV3-07  
Watts FBV3-08  
1 ¼"  
6
7
Pilot burner, standing-repair kit propane  
Pilot burner, electronic-repair kit propane  
Main burner with pilot bracket  
Pilot burner bracket  
Pilot proving module  
Main flame proving module  
Impulse relay  
8
9
10  
11  
12  
Push-button switch  
511-624-580  
511-624-581  
13  
14  
15  
Lens cover  
Light bulb  
Pilot solenoid  
511-044-039  
16  
17  
18  
Pilot shut-off valve  
Pilot switch box  
Thermocouple  
511-246-340  
511-330-229  
511-724-245  
511-246-290  
511-246-292  
511-246-294  
511-246-340  
48"  
1"  
1 ¼"  
1 ½"  
19  
Firing valve  
20  
21  
22  
Leak test valve  
Pilot tubing, alum. ¼ O.D. x .032-20" long  
Pilot tubing, alum. ¼ O.D. x .032-60" long  
Kinco-Balon P2R  
Available at Local Supply House  
*Contact local Weil-McLain distributor/agent for current replacement part and order number.  
Weil-McLain  
500 Blaine Street  
Michigan City, IN 46360-2388  
12  
Part Number 550-141-816/0798  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Weslo Treadmill WETL149060 User Manual
Whirlpool Oven RM255PXP User Manual
Whistler Radar Detector PRO 68SE User Manual
Williams Sound Stereo System PPA T35 User Manual
Winegard TV Antenna GM 1518 User Manual
Woodstock Sander W1686 User Manual
Yamaha DVD Player DRX 1 User Manual
Zenoah Plumbing Product PE2500H User Manual
ZETA Music Systems Speaker System ZMC 200 User Manual
Zhone Technologies Network Card 1612 A2 xxx User Manual