Sunway Power Supply NT 10000 User Manual

MANUAL  
User Manual for  
Sunways Solar Inverter NT 10000  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Table of contents  
1.0 General Information  
1.1 Safety Instructions  
91  
92  
General Safety Instructions  
Opening the Device  
1.2 Sunways Solar Inverter  
NT 10000  
93  
94  
Scope of Delivery  
R
in the PV System  
GB  
96  
98  
Structure of NT 10000  
Protection Concept  
2.0 Installation Instructions  
2.1 Safety Instructions  
S
101  
101  
102  
Electrical Safety  
Mechanical Safety  
Cleaning Instructions  
2.2 Basic Settings  
2.3 Installation  
103  
104  
Setting the Fixed Voltage Level  
Country Settings  
107  
108  
108  
109  
112  
115  
Installation Site Requirements  
Mechanical Installation  
Electrical Connection and Cable Entry  
Grid Connection  
Connecting the PV Generator  
Communication Interfaces  
87  
Download from Www.Somanuals.com. All Manuals Search And Download.  
118  
120  
Connecting the Alarm Relay  
Connecting the Insolation and  
Temperature Sensor  
2.4 Commissioning the Solar Inverter 122  
Starting-Up and Shutting-Down the  
Solar Inverter  
2.5 Dismantling the Solar Inverter  
123  
General Information  
3.0 Operating Instructions  
3.1 Operating the Display  
125  
125  
125  
126  
Menu Guide  
Navigating with the Arrow Keys  
Setting Values  
Menu Navigation Diagram  
3.2 Configuration of the Solar Inverter 128  
Setting the RS485 address  
Setting the Date / Time  
Setting the Display Language  
Setting the LCD Contrast  
Setting the Total Yield  
128  
128  
128  
128  
3.3 3.3 Internal Data Memory  
129  
130  
131  
General Information  
General Information  
General Information  
3.4 Sunways Monitor 2.0 Software  
3.5 Sunways Portal and Sunways  
Communicator  
88  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3.6 Communication Link  
131  
132  
132  
133  
Modem Link  
Interface Cables  
Interface Transformer  
Linking and Interconnecting Possibilities  
3.7 Error Display  
139  
144  
3.8 Error Diagnosis  
4.0 Appendix  
4.2 Tyco Solarlok Connectors  
154  
156  
Safety Instruction and Installation  
Designation and Description  
4.2 List of Special Terms and  
Abbreviations  
4.3 Technical Data NT 10000  
158  
Solar Inverter NT 10000  
4.4 Conformity and Safety  
Declarations  
160  
161  
EU Low Voltage Directive 73/23/EEC  
EMC Directive 89/336/EEC, Including Changes  
91/263/EEC  
162  
163  
165  
Safety Clearance / Certificate of Compliance  
(VDEW 4th edition 2001)  
4.5 Terms and Conditions of  
Guarantee  
Duration of Guarantee, Conditions,  
Exclusion of Liability  
4.6 General Exclusion of Liability  
Rights, Registered Trademarks  
89  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Thank you for having chosen a Sunways  
Solar Inverter NT 10000! You have acquired  
a high-quality product with unique features  
and a top efficiency level. This Solar Inverter  
is designed in accordance with the proven  
1.0 General information  
®
HERIC topology and therefore guarantees  
you a maximum energy yield.  
The Solar Inverter is equipped with three  
independent energy units which transform  
the energy of three separately connected  
PV generators into grid-compatible AC  
power and inject it in three phases. Thanks  
to the MPP multitracking process, PV gene-  
rators with various ratings can be connected  
to the same Solar Inverter with the  
NT 10000.  
In this user manual, you will find explana-  
tions on how to use the Sunways Solar  
Inverter NT 10000. It includes information  
on installation, commissioning, the functio-  
ning method, and system monitoring.  
90  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1.1 Safety Instructions  
General Safety Instructions  
The user manual contains safety instruc-  
tions. They are marked by a triangle with  
an exclamation mark.  
All safety instructions contained in this  
section as well as in the entire user manu-  
al must be observed to ensure the safety  
of the user. The described product may  
not be operated if any mechanical or elec-  
trical component is defect.  
!
Prior to commissioning the PV system, we  
strongly recommend reading and observing  
the manual and the instructions carefully!  
Non-compliance may lead to serious con-  
sequences such as damage to the device,  
damage to other assets, personal injury, or  
fatal accidents.  
GB  
The Solar Inverter may only be installed  
by a trained and qualified electrician.  
It must be approved by the power supply  
company in charge. In the chapter  
headings, the due steps are additionally  
marked by the adjacent symbol.  
91  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Opening the Device  
!
Prior to opening the housing, always  
disconnect the device from the grid and  
the PV generator.  
After having been disconnected from the  
PV generator, there is still lethal voltage  
inside the device and at the PV generator  
hubs for approximately five minutes. It  
takes that long for the energy-storing  
capacitors to fully discharge.  
After having disconnected the device  
from the grid and the PV generator, wait  
at least five minutes before opening the  
device.  
92  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
1.2 Sunways Solar Inverter NT 10000  
Scope of Delivery  
Checking the Consignment  
Prior to shipment, our products are chec-  
ked to make sure they are in a perfect con-  
dition. They are carefully packaged in recy-  
clable materials. Nevertheless, damage may  
occur during transportation which is nor-  
mally the fault of the forwarding company.  
· Sunways Solar Inverter NT 10000  
· assembly frame  
· user manual, setup, guarantee card,  
CD ROM with software  
· 3 pairs of Tyco Solarlok connectors  
Please check the delivered Solar Inverter  
carefully!  
GB  
Should you notice any damage to the  
packaging or to the Solar Inverter, please  
notify the forwarding company immedi-  
ately. If required, your specialist dealer will  
be glad to support you. If a damage report  
is needed, it must be filed with the forwar-  
ding company no later than seven days  
after receipt of the consignment.  
93  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Integrating the Solar Inverter  
in the PV System  
· The warmer the module gets, the smal-  
ler the output of the cells will be.  
Therefore, make sure your PV generator  
has sufficient back ventilation when you  
install it.  
Rating of the PV Generator  
The technical data of the selected PV  
generator must be compatible with the  
specification of the Solar Inverter (see  
Technical Data). An incompatible rating  
may reduce the yield or destroy the  
device. The rating program Sunways NT  
Sundim can help you select the correct PV  
generator rating. You will find Sunways  
NT Sundim on the enclosed CD ROM or  
· Check your PV generator for contami-  
nation approximately every three years.  
Contamination mostly occurs on the  
lower edge of the module; it forms a  
veil that is not even washed off by  
heavy rain. A loss of yield can be pre-  
vented by cleaning the modules with a  
wet cloth or a brush.  
Prior to planning your system, please take  
the following considerations into account:  
· Make sure none of the modules or solar  
cells of your system are in the shade.  
That may lead to a significant loss of  
yield.  
· Mind the orientation of the modules.  
In Central Europe, you will gain a maxi-  
mum yield if the module has a horizon-  
tal angle of 30° and the PV generator  
field points directly towards the south.  
· The NT 10000 has three internal energy  
units that are supplied by three inde-  
pendent PV generators. The NT 10000 is  
based on the «MPP multitracking» prin-  
ciple; i. e. each inlet has its own MPP  
controller.  
94  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Standard Components of a PV System  
Depending on the recommendations of  
your PV planner, your PV system is made  
up of the following components:  
Standard components of the PV system  
(1) PV generator switch  
(2) Insolation sensor with  
integrated temperature  
probe  
(3) Grid fuse  
(4) Power meter  
PV  
PV  
PV  
(1)  
(1)  
(1)  
(3)  
(4)  
PC  
GRID  
(2)  
The PV generator switch is designed as a  
DC switch-disconnector and is made for  
disconnecting the PV generator from the  
Solar Inverter.  
Grid connection:  
The NT 10000 is connected to the grid in  
three phases. Each phase is internally con-  
trolled and monitored independently of  
the others.  
Rating: at least 900 V, 16 A  
Since the NT 10000 is supplied by three  
independent PV generators, the DC main  
switches must also be independently of  
each other. It can be designed as a packet-  
type switch, for example.  
95  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Structure of NT 10000  
The Solar Inverter NT 10000 is made up of  
three energy units that are controlled  
independently of each other. Each energy  
unit has its own DC inlet.  
DC Inlet  
Energy Unit  
Control Circuit Board  
Control circuit board 1  
Control circuit board 2  
Control circuit board 3  
AC Grid Connection  
Phase L1  
DC inlet 1  
DC inlet 2  
DC inlet 3  
Energy unit 1  
Energy unit 2  
Energy unit 3  
Phase L2  
Phase L3  
The following illustration shows the con-  
nection of the DC inlet and the layout of  
the energy unit:  
96  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Solar Inverter NT 10000  
Energy unit 3  
Energy unit 2  
Control circuit board 3  
Control circuit board 2  
Control circuit board 1  
Energy unit 1  
L1  
L2  
L3  
N
Interface circuit board  
PE  
+
+
+
Underside of  
the device  
AC grid  
connection  
(1) (2) (3)  
DC inlet  
97  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Protection Concept  
The micro controller continuously and  
simultaneously monitors and displays the  
following parameters. Numbers 1 to 3  
refer to the energy units 1 to 3:  
The numbering 1 to 3 refers respectively  
to the performance unit 1 to 3:  
Error  
No.021  
022  
Description  
Error No.  
001  
002  
003  
004  
005  
006  
007  
008  
009  
010  
011  
012  
013  
014  
015  
016  
017  
018  
019  
020  
Description  
DC overvoltage 1  
Insulation fault 2  
Insulation fault 3  
DC injection 1  
DC overvoltage 2  
DC overvoltage 3  
023  
Frequency fault 1  
024  
DC injection 2  
Frequency fault 2  
025  
DC injection 3  
Frequency fault 3  
026  
Isolated operation  
Grid overvoltage 3-phase  
Surge fault 1  
Overheating of heat sink 1  
Overheating of heat sink 2  
Overheating of heat sink 3  
Grid undervoltage 1-phase 1  
Grid undervoltage 1-phase 2  
Grid undervoltage 1-phase 3  
Grid overvoltage 1-phase 1  
Grid overvoltage 1-phase 2  
Grid overvoltage 1-phase 3  
Grid undervoltage 3-phase  
AFI fault 1  
027  
028  
029  
Surge fault 2  
030  
Surge fault 3  
031  
Grid voltage 10 minutes mean value  
> 10 percent U  
1
nominal  
032  
033  
Grid voltage 10 minutes mean value  
> 10 percent U  
2
nominal  
Grid voltage 10 minutes mean value  
> 10 percent U  
3
nominal  
034  
035  
036  
038  
Control circuit board 1 fault  
Control circuit board 2 fault  
Control circuit board 3 fault  
Back-up battery empty  
AFI fault 2  
AFI fault 3  
Insulation fault 1  
98  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
In case of an error, the current injection  
is immediately stopped, and the grid relay  
is triggered which disconnects the Solar  
Inverter from the grid.  
In addition, there are the following pro-  
tection devices on the grid side and on  
the PV generator side:  
· Varistors on the grid side  
GB  
They protect the power semiconductors  
in case of high-power, temporary voltage  
peaks in the grid, and they discharge the  
throttle in case of disconnection from  
the grid.  
· Varistors on the PV generator side  
Varistors offer protection from atmos-  
pheric overvoltage (e. g. caused by  
remote lightning strikes).  
99  
Download from Www.Somanuals.com. All Manuals Search And Download.  
2.0 Installation Instructions  
100  
Download from Www.Somanuals.com. All Manuals Search And Download.  
2.1 Safety Instructions  
Electrical Safety  
Prior to opening the housing, disconnect  
the Solar Inverter from the electricity of  
the grid and the PV generator.  
!
After disconnection from the PV generator  
and the grid, there is still lethal voltage  
inside the Solar Inverter and at the  
PV generator hubs for approximately five  
minutes. It takes that long for the energy-  
storing capacitors to fully discharge.  
GB  
After having disconnected the Solar Inver-  
ter from the grid and the PV generator,  
wait at least five minutes before opening  
the Solar Inverter.  
Mechanical Safety  
During assembly, make sure the cables  
or connecting lines attached to the Solar  
Inverter are installed safely and suitable  
mechanical cable retaining devices (e. g.  
cable channels) are used.  
101  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Cleaning Instructions  
!
Prior to cleaning your PV modules, always  
disconnect the PV system from the power  
grid by opening the grid disconnecting  
device (main fuse), and open the DC circuit  
breaker on the PV generator to prevent  
the risk of an electric shock.  
Use a dry, soft cloth to clean your PV  
modules. Never use caustic, solvent-based,  
or scouring cleaning agents or polish.  
Please observe the instructions of the  
PV module manufacturer.  
102  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
2.2 Basic Settings  
«420 V» position  
«540 V» position  
Setting the Fixed Voltage Level  
Your Sunways Solar Inverter is equipped  
with a precise MPP control. If less than  
200 watt are injected, the control of the  
energy unit concerned operates at a fixed  
voltage level. That prevents unnecessary  
MPP searching. To minimise adjustment  
losses during fixed voltage operation, the  
fixed voltage level of each energy unit of  
the Solar Inverter can be set separately.  
The optimum fixed voltage level depends  
on your PV generator model.  
GB  
Illustr.: Slide switch «S100» for setting the  
fixed voltage level  
Fixed voltage  
level  
No-load voltage  
PV generator at 25 °C  
420 V  
540 V  
630 V  
> 630 V  
The fixed voltage can be set with the slide  
switch «S100» on the control circuit board.  
Ex works, the switch is set to «420V».  
To set a fixed voltage of 540 V, slide the  
switch to the «540V» position.  
103  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Country Settings  
Please note that it takes different configu-  
rations to operate Sunways Solar Inverters  
in different countries. The setting can be  
adjusted accordingly with the DIP switch  
«S300» below the display circuit board.  
Illustr.: DIP switch «S300» for changing the  
country setting  
Switch position  
Change  
Country  
Germany  
Spain  
· Opening time after power failure: 3  
· Grid monitoring 1-phase  
104  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
To change the country setting, the housing  
cover must be removed. The DIP switch  
must be re-positioned to the respective  
country setting on all three control circuit  
boards.  
When delivered, the Solar Inverters are  
pre-set to the intended destination coun-  
try. The pre-set country is indicated by  
the first two digits of the serial number:  
GB  
Germany  
Spain  
00.....  
02.....  
105  
Download from Www.Somanuals.com. All Manuals Search And Download.  
The Solar Inverter may only be installed by  
a trained and qualified electrician.  
2.3 Installation  
Special tools are needed for installation.  
Please read this chapter very carefully.  
!
Ceiling  
Warm  
air  
Wall  
min. 300 mm  
min. 300 mm  
Cool air  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation Site Requirements  
If the Solar Inverter is installed in a switch  
cabinet, make sure the heat is removed to  
a sufficient degree.  
· Mechanical Load-Bearing Capacity  
During assembly, please keep in mind that  
the Solar Inverter weighs 30 kg. The  
assembly foundation must be solid and  
capable of bearing the weight in the long  
run.  
The ambient temperature may not drop  
below -25° C or rise above +40° C.  
To protect the Solar Inverter from unneces-  
sary external heat sources, do not expose  
the Solar Inverter to direct sunlight.  
· Thermal Interaction  
GB  
The assembly foundation must be made  
of flame-retardant material (unsuitable:  
wooden or plastic foundation; suitable:  
concrete and masonry), because the frame  
of the Solar Inverter can reach up to 70° C.  
· Protection from Moisture and Foreign  
Objects  
Thanks to the high protection level IP 54,  
the Solar Inverter can be installed indoors as  
well as in a sheltered outdoor area, but it  
may not be directly exposed to rain.  
Maintain a minimum distance of 300 mm  
to other devices, cabinets, ceilings, cable  
channels, etc. above, below, and next to  
the housing.  
Make sure the dust filter on the lower left  
side is not clogged by contamination.  
That would impair the intake of cooling air.  
Depending on the surroundings, the filter  
should be cleaned at regular intervals.  
The Solar Inverter must be installed in an  
upright position to ensure unobstructed  
convection.  
Do not install several Solar Inverters on  
top of each other, as they might heat  
each other up.  
107  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Mechanical Installation  
Electrical Connection and Cable Entry  
!
!
ꢀ ꢀ  
For assembly, please observe the instruc-  
As soon as the Solar Inverter is fixed to the  
tions in the «Setup» leaflet!  
assembly frame, it can be electrically con-  
nected. The device may only be opened  
by a qualified electrician. For this purpose,  
loosen the four lateral hexagon socket  
screws by one rotation. The cover can now  
be moved up to the upper rabbet. Fix the  
cover in position by simply inserting the  
hexagon key on the lower right side. The  
wiring space is now accessible.  
108  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Grid Connection  
As an input-to-grid line protection ele-  
ment, we recommend using a 3 x 25 A  
automatic circuit breaker for the NT  
10000. No consumers may be connected  
to the supply line from the Solar Inverter  
to the automatic circuit breaker. The Solar  
Inverter injects in three phases via termi-  
nals L1, L2, and L3. Please mind the pin  
assignment. A wrong assignment may  
destroy the device.  
The Solar Inverter must be connected to  
the grid with five-cores (L1, L2, L3, N, PE).  
We recommend a cable cross-section of  
2
5 x 4 mm .  
The Solar Inverter is connected to the  
supply grid via its internal printed-circuit  
board terminals.  
GB  
Alarm relais, RS485 (in and out),  
DC1 DC2 DC3  
AC wiring loom  
L1, L2, L3, N, PE  
irradiation sensor with integrated  
temperature measurement  
DC+  
DC–  
USB  
RS232  
Illustr.: Entry openings on the underside of the device  
109  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Three-phase grid connection  
PE N L3 L2 L1  
25 A  
Always use sufficiently dimensioned cable  
cross-sections to prevent a significant incre-  
ase of the grid impedance between the  
service distribution system and the Solar  
Inverter. The capacity of the AC terminals is  
Inverters may repeatedly switch on and off.  
Carry out the following steps carefully:  
· Prior to inserting the power cable into  
the device, make sure it is de-energised.  
2
2
0.5 mm to 6 mm for rigid cables, and 0.5  
2
2
mm to 10 mm for flexible cables. If the  
grid impedance is high, i. e. due to relati-  
vely long or thin cables, the voltage at the  
grid terminal is increased during injection.  
If the terminal voltage exceeds the admissi-  
ble value, the Solar Inverter is disconnected  
from the grid. If the power grid is weak  
and the PV output is high, individual Solar  
110  
Download from Www.Somanuals.com. All Manuals Search And Download.  
· Insert the five-core AC cable (outer  
diameter 9–17 mm) into the M32 cable  
gland.  
· Connect lines L1, L2, L3, N, and PE to  
the slated printed circuit board terminal  
with a slotted screwdriver.  
GB  
· Pull the M32 cable gland tight, so the  
cable cannot exert mechanical force on  
the printed circuit board terminal.  
111  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. Accessible and conductive parts of the  
PV generator (e. g. metal frame, support  
structure, etc.) must be earthed (connec-  
tion to PE).  
Connecting the PV Generator  
!
5. Make sure the PV generator is earth-  
fault free.  
· Preparation  
Please note that the NT 10000 has three  
independent DC inlets. The PV generators  
may have different ratings, but they must  
be compatible with the specifications of  
the Solar Inverter.  
6. Connect the Solar Inverter to the power  
line.  
1. Install the DC cables in accordance with  
the system ratings prescribed by your PV  
planner. Measure the no-load voltage  
and the short-circuit current of each PV  
phase to make sure they work perfectly.  
2. Read the type plate of the Solar Inverter  
to make sure it is licensed for the maxi-  
mum PV generator voltage.  
3. To avoid dangerous touch voltage  
during the assembly of PV systems, the  
positive and negative conductors must  
be kept away from the earth potential  
(PE) electrically.  
112  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Important Information  
· Connection  
The PV generator is connected by means of  
the externally accessible, touch-safe Tyco  
Solarlok connectors included in the con-  
signment. The Tyco Solarlok connectors are  
!
2
designed for a cable cross-section of 4 mm  
· The DC voltage can reach up to 850 V.  
The device may only be opened by a  
qualified electrician!  
and have to be crimped. For further infor-  
mation, please read chapter 4.2 «Tyco  
Solarlok Connectors».  
GB  
· As soon as the PV generator has been  
connected to the Solar Inverter by means  
of the DC connectors and the PV genera-  
tor has been switched on, the PV genera-  
tor voltage is applied internally!  
Please note:  
All PV generator inlets are positioned in  
pairs. Inlet 1 is left, inlet 2 is in the middle,  
and inlet 3 is right. The upper connections  
are «POSITIVE», and the lower ones are  
«NEGATIVE».  
· Please note that the inlet capacitors are  
still live, even after the PV generator has  
been switched off or the PV generator  
connector has been pulled out!  
· After the AC and DC sides have been  
isolated, the Solar Inverter remains live  
for up to approximately five minutes!  
· Therefore, wait at least five minutes for  
the internal voltage to discharge. Prior to  
working on the Solar Inverter, always  
Illustr.: PV generator connection via Tyco  
Solarlok connectors  
113  
Download from Www.Somanuals.com. All Manuals Search And Download.  
check the residual DC voltage with a volt-  
meter. Then you may work on the termi-  
nals. See chapter 2.1.  
· Always disconnect the PV generator side  
first by opening the PV generator switch;  
then interrupt the grid connection by iso-  
lating (switching off) the corresponding  
grid fuse!  
· Never disconnect the PV generator by  
pulling out the Tyco Solarlok connectors  
under load. Otherwise a powerful electric  
arc might damage the connectors. The  
damaged connectors then have to be  
replaced!  
· If your PV system does not have a PV  
generator switch, interrupt the grid con-  
nection by isolating (switching off) the  
corresponding grid fuse first. A fault will  
then be recorded in the fault memory  
of the Solar Inverter, however.  
114  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Communication Interfaces  
!
The communication interfaces enable you  
to retrieve operating data from the data  
memory with an external computer and to  
change certain settings. There are several  
communication interfaces: USB, RS232,  
and RS485.  
Illustr.: USB connector (left) and SUB-D9  
connector (right) for the RS232 connection  
on the underside of the device.  
GB  
The standard communication interface is  
the USB interface which is installed in  
every common PC or Notebook. This inter-  
face will let you communicate with your  
Solar Inverter via an interconnecting USB  
cable. As an alternative, you can also use  
the RS232 interface. The RS485 interface is  
for cross-linking several Solar Inverters.  
The USB and RS232 interfaces are connec-  
ted on the outside of the housing with a  
standard USB connector or a SUB-D9 con-  
nector.  
Illustr.: Terminal block for the RS485  
connection  
115  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
· RS485 Wiring  
Use a twisted two-wire cable for the RS485  
wiring of the Solar Inverter. Connect the  
terminals «RS485 +» between the Solar  
Inverters with one core and the terminals  
«RS485 -» with the other.  
Solar Inverters NT 10000 can be cross-lin-  
ked via RS485. When doing so, please keep  
in mind that the Solar Inverters must be  
connected in series. Cross-linking them  
point-to-point is not admissible. Interface  
RS485 is connected via the printed circuit  
board terminals and the corresponding  
M12 cable glands inside the housing. Prior  
to wiring the RS485, move the cover of the  
Solar Inverter up, and fix it in position by  
tightening a lateral screw. See chapter 2.1  
«Safety Instructions».  
If you use a shielded twisted two-wire  
cable, you can earth the shield. That will  
improve the communication reliability.  
With the last Solar Inverter, the jumper  
«RS485 MATCH» must be closed. With all  
other Solar Inverters, it has to be in the  
open position (see chapter 3.6 «Com-  
munication Link»).  
The required cable terminal block («X6»)  
with the connections «RS485 +», «RS485 -»,  
and «RS485 GND» is in the lower section of  
the circuit board (see illustr. page 115).  
Caution: There are two each of all termi-  
nals, so the ingoing and outgoing lines can  
be connected separately.  
· Connecting a cable to the spring-loaded  
terminal  
· Use a small screwdriver. Press the orange  
terminal. The terminal will open.  
· Insert the (at least 11 mm bare) cable into  
the respective terminal hole.  
· Release the pressure from the screw-  
driver. The cable is now attached to the  
connection.  
· Make sure the cable is connected tightly.  
116  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Inverter 2  
Inverter 3  
Inverter 1  
Jumper  
SPARE  
RS485MATCH  
SPARE  
RS485MATCH  
SPARE  
RS485MATCH  
RS485  
connection  
Interface  
transformer  
IT  
USB/RS232  
· Release the pressure from the screw-  
driver. The cable is now attached to the  
connection.  
· Make sure the cable is connected tightly.  
117  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Connecting the Alarm Relay  
The required terminal block with the  
connections «S-» and «S+» is on the lower  
right side of the circuit board («X5»).  
Allocate the terminals as shown:  
All Sunways Solar Inverters are equipped  
with a potential-free alarm relay. The relay  
is designed as a make-contact element  
and is always triggered when the device  
reports an error. That ensures that any  
faults in the PV system are reported  
quickly and reliably on site. With PV  
systems with several Solar Inverters, the  
individual relays can be paralleled and  
connected via a joint indicator light.  
· Important Information:  
!
The alarm relay is rated for 230 V / 2 A.  
Any higher power/voltage may destroy the  
relay. The connected indicator module  
must be fused separately!  
The alarm relay cannot be triggered if  
there is a power failure on L1, because  
that is the supply phase for the Solar  
Inverter.  
· Connecting a cable to the spring-loaded  
terminal  
The alarm relay cannot be triggered if  
there is a grid failure on L1 since this is  
the supply phase for the solar inverter.  
· Use a small screwdriver. Press the orange  
terminal. The terminal will open.  
· Insert the (at least 11 mm bare) cable  
into the respective terminal hole.  
· Release the pressure from the screwdri-  
ver. The cable is now attached to the  
connection.  
· Connection  
Move the cover of the Solar Inverter  
up, and fix it in position by tightening a  
lateral screw. See chapter 2.1 «Safety  
Instructions».  
· Make sure the cable is connected tightly.  
118  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
The terminals are designed for a cable  
2
2
cross-section of 0.2 mm to 1.5 m .  
When selecting the dimensions of the  
cross-section, please keep the power  
consumption of the connected indicator  
module in mind!  
Illustr.: Alarm relay connection  
GB  
Alarm relay terminal allocation  
Paralleled alarm relays of several Solar  
Inverters  
INVERTER  
(1)  
INVERTER  
(2)  
INVERTER  
(n)  
S –  
S–  
S+  
S+  
INDICATOR LIGHT  
L1 N  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Connecting the Insolation and  
Temperature Sensor  
The optional insolation sensor with the  
temperature probe is connected to the  
cable terminal block «X4» in the lower  
section of the circuit board.  
The optional insolation sensor (type  
Si-01TC-T by Ing.-Büro Mencke & Tegt-  
meyer) with its integrated PT-100 tempera-  
ture probe for measuring the temperature  
lets you record the insolation data and the  
corresponding module temperature and  
store them in the internal data memory  
as a 15-minute average value.  
This additional measuring unit helps you  
analyse the performance of the system.  
Based on the values, any faults in the PV  
generator, e. g. shaded or defect solar  
cells, can be detected.  
Illustr.: Connection insolation sensor  
Prior to connecting an insolation sensor,  
move the cover of the Solar Inverter up,  
and fix it in position by tightening a late-  
ral screw. Please note that the inlets and  
outlets are not short-circuit-proof. Please  
observe chapter 2.1 «Safety Instructions».  
120  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
· Allocation of the cable terminal block:  
Sensor pin name  
Pin allocation  
Solar inverter pin name  
sensor connector  
Plus signal temperature  
Plus signal insolation intensity  
Plus connection supply +5 V  
Earth reference  
Pin 1  
Pin 2  
Pin 3  
Pin 4  
S-Temp  
P-Solar  
V+  
V-  
· Use a small screwdriver. Press the  
orange terminal. The terminal will open.  
· Insert the (at least 11 mm bare) cable  
into the respective terminal hole.  
· Release the pressure from the screw-  
driver. The cable is now attached to  
the connection.  
· Make sure the cable is connected tightly.  
121  
Download from Www.Somanuals.com. All Manuals Search And Download.  
2.4 Commissioning the Solar Inverter  
Starting-Up and Shutting-Down the  
Solar Inverter  
Prior to starting up the Solar Inverter,  
move the housing cover downwards by  
releasing the lateral fixation on the right  
lower side of the housing and pulling the  
four lateral hexagon socket screws tight.  
As soon as the Solar Inverter has been  
mechanically installed and connected to  
the power lines, it can be commissioned as  
follows. Depending on whether or not you  
are using DC main switches, the start-up  
and shut-down sequence for the DC and  
AC side differs.  
Do not deposit any objects (e. g. this  
manual) on the housing of the Solar  
Inverter. The ventilation behind the Solar  
Inverter must not be obstructed.  
Note: The Solar Inverter is supplied from  
the grid. If the PV output is high enough,  
the Solar Inverter will switch on autom  
atically. For that purpose, on and off thres-  
hold values have been determined.  
If the device is installed outdoors, please  
double-check that the cable glands, the  
housing cover, and the protection cap of  
the SUB-D9 connector (provided this ter-  
minal is not allocated) are tight.  
Start-up (with DC main switch)  
1. Switch the grid connection on with the  
external automatic circuit breaker.  
2. Switch the PV generator voltage on  
by closing the DC main switch. If the  
PV input voltage is sufficient, the Solar  
Inverter will start and inject solar  
energy into the electrical grid. The  
injection is indicated by the power  
pointer on the display.  
122  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Start-up (without DC main switch)  
1. Connect the Tyco Solarlok connectors  
to your Solar Inverter.  
!
2. Start-up the AC side.  
Never disconnect the PV generator by  
pulling out the Tyco Solarlok connectors  
under load! Otherwise a powerful electric  
arc might damage the connectors.  
The damaged connectors then have to  
be replaced!  
Shut-down (with DC main switch)  
1. Disconnect the PV generator side by  
opening the DC main switch.  
GB  
2. Open the grid connection by isolating  
(switching off) the corresponding grid  
fuse.  
2.5 Dismantling the Solar Inverter  
To dismantle the Solar Inverter, loosen the  
hexagon socket screws, and move the  
cover up. Make sure the Solar Inverter is  
de-energised; then remove the supply  
lines. The Solar Inverter may then be lifted  
out of the assembly frame.  
3. After a waiting time of at least five  
minutes, the Solar Inverter is deener  
gised.  
Shut-down (without DC main switch)  
1. Interrupt the grid connection by isola-  
ting (switching off) the corresponding  
grid fuse. A fault will then be recorded  
in the fault memory of the Solar  
Inverter.  
2. Pull the Tyco Solarlok connector out of  
your Solar Inverter.  
123  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
3.0 Operating Instructions  
124  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3.1 Operating the Display  
· Menu Guide  
Activate the main menu by pressing any  
random key. In the top menu level, there  
are four items to choose from:  
· display current values  
A dot matrix LCD display with 2 x 16 cha-  
racters is integrated in the housing of the  
Solar Inverter. The language of the dis-  
played messages can be selected (German,  
English, Spanish, Italian, or French). The  
four arrow keys to the right of the display  
are for navigating the menu structure. The  
background lighting of the display is acti-  
vated by pressing any random key. It auto-  
matically switches off if no input is made  
for more than one minute.  
· display energy yield  
· change settings  
· display Solar Inverter specifications  
· Navigating with the Arrow Keys  
GB  
You can use the UP arrow  
and DOWN  
arrow  
level. To select a menu item, press the  
RIGHT arrow key . To return to a  
higher menu level, press the LEFT arrow  
key  
keys to scroll within a menu  
As a standard, line one of the display  
shows the current total output of the Solar  
Inverter, and line two shows the partial  
output of the three energy units 1 to 3.  
This information is always displayed if no  
key is pressed for one minute.  
.
· Setting Values  
To set values, move to the next figure by  
pressing the RIGHT arrow key. To change  
the current figure, press the UP/DOWN  
arrow key. If the cursor is on the last figu-  
re, you can confirm the input by pressing  
the RIGHT arrow key. To abort the changes  
during entry, press the LEFT arrow key.  
125  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
If a displayed value can be changed, an  
arrow is shown behind it. In this case, press  
the RIGHT arrow key to reach the «edit«  
mode.  
Main menu  
Display current  
values  
The current power and voltage values are  
displayed separately for each of the three  
energy units.  
Display  
yield  
Change  
settings  
Solar Inverter  
specifications  
126  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Power (kW)  
DC current (A)  
DC voltage (V)  
AC current (A)  
AC voltage (V)  
Temp. module (°C)  
2
Insolation (W/m )  
Date / Time  
Error display  
Today’s yield  
Yesterday’s yield  
Monthly yield  
Annual yield  
Total yield  
Address RS485  
Date / Time  
Language  
Change  
LCD contrast  
Total yield  
Total  
Works menu  
Energy unit 1  
Energy unit 2  
Energy unit 3  
Change  
Serial number  
Firmware version  
Date of commissioning  
127  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3.2 Configuring the Solar Inverter  
Setting the Date/Time  
To set the time or date, select the menu  
item «change settings» / «date/time», and  
move to the «edit» mode by pressing the  
RIGHT arrow key.  
You can enter the following settings in  
your Solar Inverter:  
· set RS485 address  
· set date / time  
Setting the Display Language  
· set display language  
· set LCD contrast  
· set total yield  
To set the display language, select the  
menu item «change settings» / «lan-  
guage». Here, you can choose from the  
languages German, English, Spanish,  
French, and Italian by pressing the  
UP/DOWN arrow key. Confirm your input  
by pressing the RIGHT arrow key.  
Please note that the configuration can only  
be changed when the Solar Inverter is ope-  
rating. Alternatively, you can change these  
settings by using the enclosed software  
Sunways Monitor.  
Setting the LCD Contrastt  
If you wish to change the LCD contrast to  
improve the clarity of the display, select  
the menu item «change settings» / «LCD  
contrast». Press the RIGHT arrow key to  
activate the «edit» mode; then select the  
desired contrast by pressing the UP/DOWN  
arrow key. To confirm your input, press  
the RIGHT arrow key.  
Setting the RS485 Address  
To use the communication via the RS485  
bus, the Solar Inverters must have consecu-  
tive RS485 addresses. That means, if you  
link three Solar Inverters together, their  
addresses must be 1, 2, 3. When delivered,  
address 1 is preset. To change the address,  
select the menu item «settings» / «RS485  
address», and press the RIGHT arrow key to  
call up the «edit» mode. There, you can  
enter an address from 1 to 99.  
Setting the Total Yield  
If your Solar Inverter needs to be replaced,  
you can take over the total yield from the  
128  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
former Solar Inverter to your new one.  
You can either take over the total yield of  
the device, or the individual yield of each  
energy unit. If you set the total yield of the  
device, it will automatically be split among  
the energy units 1 to 3 in equal shares.  
If you change the yield of the individual  
energy units separately, they will be added  
up to the total yield.  
3.3 Internal Data Memory  
Your Solar Inverter is equipped with an  
internal data memory as a standard fea-  
ture. With the enclosed software Sunways  
Monitor, you can access these data. These  
Solar Inverter data will give you detailed  
information on the functioning method  
and relevant values of your solar energy  
supply at any time. The measured values  
are stored in a ring buffer that automati-  
cally overwrites the earliest values with  
the latest ones. The following measured  
values are stored in your Solar Inverter  
NT 10000:  
GB  
To do so, select the menu item «change  
settings» / «total yield». Here, you can  
select the total yield, energy unit 1, energy  
unit 2, or energy unit 3. To start changing  
the displayed value, press the RIGHT arrow  
key.  
15 minutes average values (500 data  
records, each with date/time):  
· DC current  
· DC voltage  
· AC current  
· AC voltage  
· injected power  
· insolation (optional)  
· module temperature (optional)  
129  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
In addition, the following total injected  
energy values (electrical output) are  
stored:  
3.4 Sunways Monitor 2.0 Software  
General Information  
The visualisation software Sunways Monitor  
2.0 is for monitoring the PV system and  
configuring the Sunways Solar Inverter with  
a PC. You can install it on your PC from the  
enclosed CD ROM.  
· daily yield (40 days)  
· monthly yield (13 months)  
· total yield (since commissioning)  
The last 100 errors of the Solar Inverter  
are stored with their date, time, and error  
number.  
To download the latest software version  
on the Internet. Our system recommenda-  
tion is:  
Please note that, in the nominal case, all  
displayed values have a maximum measu-  
ring accuracy of 5 percent. The power  
meter of your power supply company is an  
absolute reference for the injected energy.  
· Intel Pentium with at least 500 MHz  
· Microsoft Windows 98 Second Edition,  
Windows 2000, Windows XP  
· Microsoft .NET-Framework 1.1  
· 200 MB available ROM  
· 256 MB RAM  
· VGA monitor with at least 1024 x 768  
resolution, at least 256 colours  
With the Sunways Monitor 2.0 software, all  
measured values stored in the Solar Inverter  
are retrieved and filed in a data bank. The  
software lets you visualise the measured  
values in diagrams or in tables.  
130  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
You can flexibly manage as many PV  
systems as you like with up to 99 Solar  
Inverters and different types of con-  
nections (modem or direct).  
3.6 Communication Link  
Every Sunways Solar Inverter NT 10000 is  
equipped with the interfaces RS232, RS485,  
and USB, by which it can be connected to  
your PC. If the PV system and the PC are  
far apart, the data can also be retrieved via  
a modem link. If linked via the RS485  
interface, up to 99 Solar Inverters can be  
monitored and read out.  
To learn more about the software possi-  
bilities, please read the instructions on  
the CD ROM.  
GB  
3.5 Sunways Portal and Sunways  
Communicator  
Modem Link  
For that purpose, a modem (remote  
modem) must be connected to the Solar  
Inverter. We recommend using the «ACER  
surf 56» modem by ACER as a remote  
modem. This accessory is available from  
your Solar Inverter dealer.  
To supervise a solar system with several  
Sunways Solar Inverters, we recommend  
using the Sunways Communicator. This  
device lets you connect your system to  
the Sunways portal where you can access  
your system data via the Internet.  
Moreover, it can warn you of system faults  
by email, fax, or SMS.  
For further suppliers, please visit our  
website ww.sunways.de.  
Connect the second modem (local modem)  
to the RS232 interface of your PC.  
If you would like to find out more infor-  
mation about the Sunways Communicator,  
look it up on the supplied CD ROM.  
To learn more about the Sunways  
Communicator, please look up the infor-  
mation on the enclosed CD ROM.  
131  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
using products made by ICP Germany to  
ensure a reliable data transfer  
!
To connect the interface transformer to a  
COM port (RS232) of your PC, use the  
«I-7520» model; to connect it to a USB-port  
of your PC, use the «I-7561» model. This  
accessory is available from your Solar  
Inverter dealer. For further suppliers, plea-  
se visit our website ww.sunways.de.  
Modem types not recommended by  
Sunways are not necessarily guaranteed  
to work.  
For the remote modem to automatically  
respond to an incoming call and open the  
line, it has to be initialised with the  
Sunways Monitor software prior to instal-  
lation. For this, please also observe the  
software instructions.  
!
Interface Cables  
Depending on the type of link, different  
types of interface cables are needed. They  
are available from your Solar Inverter dea-  
ler. For further suppliers, please visit our  
website ww.sunways.de.  
To set up the RS485 communication bet-  
ween the Solar Inverters properly, the  
RS485 addresses have to be set consecuti-  
vely, starting with address 01 (see chapter  
«Setting the RS485 Address»).  
Interface Transformer  
If you wish to read out the Solar Inverter  
data with your PC via the RS485 interface,  
you need an interface transformer to  
transform the RS485 signals into PC-compa-  
tible RS232 signals. We recommend .  
132  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Linking and Interconnecting Possibilities  
Depending on the distance to be overcome and the number of Solar Inverters,  
there are the following linking possibilities:  
Type of Link  
Solar System with 1  
Solar Inverter  
Distance  
Solar System with up to 99  
Solar Inverters  
(cross-linked via RS485)  
Sunways  
Monitor Direct  
Link  
Connection of the PC via  
USB (max 5 m) or RS232  
(max. 25 m) (see 1)  
PC not more than  
5 - 25 m away  
Connection between the PC and  
the Solar Inverter via USB with  
the RS485 address 01 (max. 5 m)  
(see 4)  
Sunways  
Monitor Local  
Link  
Link between Solar  
PC not more than  
500 m away (mi-  
nus RS485 cable  
length between  
Link between Solar Inverter and  
PC via RS485 bus, using an inter-  
face transformer at the PC  
(see 5)  
Inverter and PC via RS485  
bus, using an interface  
transformer at the PC  
the Solar Inverters) (see 2)  
Sunways  
Monitor  
Use of a remote modem  
PC more than  
500 m away  
Connection of the remote  
modem via an interface trans-  
former at the RS485 of the Solar  
Inverter with the RS485 address  
01, link via modem at the PC  
(see 6)  
at the Solar Inverter RS232  
port; link via modem at  
the PC (see 3)  
Remote Link  
Sunways  
Use of an RS485 cable set  
(comes with the Sunways  
Communicator)  
Sunways Commu-  
nicator not more  
than 25 m away  
Use of an RS485 cable set  
(comes with the Sunways  
Communicator)  
Communicator  
Direct Link  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
The cables and interface transformers that  
should be used are shown in the following  
diagrams.  
(1) Local link with a maximum distance of 25 m between the Solar Inverter and the PC  
SUB-D9 connector  
USB  
SUB-D9 connector  
USB  
PC  
(Sunways cable type 1, null modem cable female / female  
(alternative: Sunways cable type 5, USB-device cable)  
(2) Local link with an interface transformer between the Solar Inverter and the PC  
Connection bar  
Sub-D9 hub  
SUB-D9 connector  
RS485  
PC  
IC  
(Sunways cable type 2, modem cable female / male)  
(twisted 2-wire cable)  
Data+  
Data–  
IT  
134  
Download from Www.Somanuals.com. All Manuals Search And Download.  
(3) Remote link with a modem between the Solar Inverter and the PC  
SUB-D9 connector  
Sub-D9 hub  
Sub-D9 connector SUB-D9 hub  
PC  
MODEM  
MODEM  
(Sunways cable type 2  
modem cable hub/connector)  
(Sunways cable type 2  
modem cable hub/connector)  
(4) Local link for up to 99 Solar Inverters with a maximum distance of 25 m  
between the Solar Inverters and the PC  
RS485  
SPARE  
RS485MATCH  
RS485  
PC  
SPARE  
RS485MATCH  
USB  
(Sunways cable type 5,  
RS485  
USB  
USB plug)  
SPARE  
RS485MATCH  
135  
Download from Www.Somanuals.com. All Manuals Search And Download.  
(5) Local link for up to 99 Solar Inverters (IT or USB)  
Alternatively USB  
RS485  
SPARE  
RS485MATCH  
RS485  
PC  
PC  
SPARE  
RS485MATCH  
USB  
SUB-D9  
connector  
RS485  
USB  
SUB-D9 hub  
SPARE  
IT  
IT  
RS485MATCH  
(twisted pair  
cable)  
(Sunways cable type 2,  
(Sunways cable type 5,  
USB device cable)  
modem cable female / male)  
Ad (5): Local Link for up to 99 Solar  
interface transformer with the following  
allocation: «RS485 +» to «DATA+» and  
«RS485 -» to «DATA-».  
Inverters  
With this interconnection, up to 99 Solar  
Inverters can be cross-linked and read out.  
That results in a maximum RS485 cable  
length of 500 m between the Solar  
Inverters and the interface transformer.  
The interface transformer transforms the  
RS485 signal into RS232. It is linked to the  
PC with cable type 2 (standard modem  
cable). With the Solar Inverter that is fur-  
thest away from the interface transformer,  
the jumper RS485 MATCH must be closed.  
The RS485 signal is transferred from the  
first Solar Inverter in the row into the  
136  
Download from Www.Somanuals.com. All Manuals Search And Download.  
With all other Solar Inverters, it has  
to be in the open position.  
!
To identify the individual Solar Inverters, a  
clear RS485 has to be assigned to each of  
them. See chapter «Setting the RS485  
Address».  
(6) Remote link for up to 99 Solar Inverters with an interface transformer and a modem  
RS485  
SPARE  
RS485MATCH  
(twisted pair cable)  
RS485  
PC  
SPARE  
RS485MATCH  
SUB-D9  
connector  
(twisted pair cable)  
SUB-D9  
connector  
SUB-D9  
hub  
SUB-D9  
hub  
RS485  
SPARE  
MODEM  
IT  
MODEM  
RS485MATCH  
(Sunways cable type 2  
modem cable  
(Sunways cable type 3  
modem cable  
(twisted pair cable)  
hub/connector)  
connector/connector)  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Ad (6): Remote Link for up to 99 Solar  
Inverters  
Finding the Jumper «RS485 MATCH»  
in the Solar Inverter  
If you wish to connect several Solar  
Inverters to the remote monitoring system,  
the individual Solar Inverters must be cross-  
linked via RS485. The RS485 signal of the  
first Solar Inverter in the row is transferred  
into the interface transformer with the fol-  
lowing allocation: «RS485 +» to «DATA+»  
and «RS485 -» to «DATA-». Connect the  
remote modem to the interface transfor-  
mer. With the last Solar Inverter, the jum-  
per «RS485 MATCH» must be closed. With  
all other Solar Inverters, it has to be in the  
open position.  
Please make sure the jumper «RS485  
MATCH» is in the right position, considering  
the communication interconnection you  
have chosen. This jumper is on the under-  
side of the interface circuit board.  
Illustr.: Position of the jumper «RS485  
MATCH»  
!
To identify the individual Solar Inverters,  
a clear RS485 has to be assigned to each of  
them. See chapter «Setting the RS485  
Address».  
138  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3.7 Error Display  
Errors 001 to 003  
Your Solar Inverter works fully automatically. · DC overvoltage  
Should external or internal factors neverthe- A maximum PV generator no-load voltage  
less lead to an error, an error number will be of 850 V is admissible. All components of  
flagged on the display. Below, you will find  
a description of the error for each error  
number. If three consecutive error numbers  
are listed in the description, each of them  
the DC inlet have a sufficient safety factor. If  
this limit is exceeded, the Solar Inverter will  
stop the injection, and «error 001» will be  
flagged, for example. That means an over-  
refers to an energy unit of the Solar Inverter. voltage of the PV generator on inlet 1 or on  
E. g. for the description of errors 004 to 006, the lower energy unit.  
this means:  
GB  
· Error 004 refers to:  
Errors 004 to 006  
DC inlet 1 (left DC connection)  
energy unit 1 (lower control circuit board)  
grid phase L1  
· Frequency fault  
The Solar Inverter continuously monitors  
the applied grid frequency. Should it be  
outside the range specified in E DIN VDE  
0126-1-1, the Solar Inverter will stop the  
· Error 005 refers to:  
DC inlet 2 (middle DC connection)  
energy unit 2 (middle control circuit board) injection, and «error 004» will be flagged,  
grid phase L2  
for example. That means a grid frequency  
error on grid phase L1 or on the lower  
energy unit.  
· Error 006 refers to:  
DC inlet 3 (right DC connection)  
energy unit 3 (upper control circuit board)  
grid phase L3  
139  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Errors 007 to 009  
Errors 013 to 015  
· Overheating  
· Grid overvoltage 1-phase  
Your Solar Inverter is designed for an  
ambient temperature of up to +40° C.  
If the maximum temperature of the heat  
sink is exceeded, the injection will stop.  
When the heat sink temperature has  
dropped, the Solar Inverter will automa-  
tically restart. If the upper heat sink over-  
heats, for example, «error 009» will be  
flagged.  
Your Solar Inverter continuously monitors  
the voltage level of the injection phase.  
If it rises above the maximum admissible  
limit value, the Solar Inverter will stop the  
injection and only restart when the voltage  
value drops below the maximum admissi-  
ble limit value. If there is a grid overvolta-  
ge on phase L2, for example, «error 014»  
will be flagged.  
Error 016  
Errors 010 to 012  
· Grid undervoltage 3-phase  
· Grid undervoltage 1-phase  
Your Solar Inverter is equipped with an  
intrinsically safe 3-phase grid monitoring  
system that complies with E DIN VDE  
0126-1-1. The voltage level of phases L1,  
L2, and L3 is continuously monitored.  
If it drops below the minimum admissible  
limit value, the Solar Inverter will stop the  
injection and only restart when the voltage  
value rises above the minimum admissible  
limit value.  
Your Solar Inverter continuously monitors  
the voltage level of the injection phase.  
If it drops below the minimum admissible  
limit value, the Solar Inverter will stop the  
injection and only restart when the voltage  
value rises above the minimum admissible  
limit value. If the voltage of L1 drops  
below 160 V, the Solar Inverter can no  
longer be supplied, and the display will  
switch off. If there is a grid undervoltage  
on phase L3, for example, «error 012» will  
be flagged.  
140  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Errors 017 to 019  
Errors 023 to 025  
· AFI fault current  
· DC injection  
The error «AFI fault current» occurs if fault  
current has penetrated the PV system and  
the Solar Inverter has subsequently discon-  
nected from the grid. The earth fault is  
monitored on the AC and on the DC side  
(universal current sensitive FI). If this error  
message occurs, the entire PV system must  
be checked for insulation faults. The func-  
tioning method complies with E DIN VDE  
0126-1-1. In case of fault current at inlet 1  
of the PV generator, for example, «error  
017» will be flagged.  
Your Solar Inverter continuously monitors  
the quality of the injected electricity. If an  
increased share of DC current is detected in  
the injected electricity, the Solar Inverter  
will stop the injection The Solar Inverter  
will only try to continue the injection after  
the system has been shut down and restar-  
ted manually, or automatically the next  
day.  
GB  
Error 026  
· Isolated operation  
Errors 020 to 022  
Your Solar Inverter is equipped with a  
high-quality redundant grid monitoring  
system that complies with E DIN VDE  
0126-1-1 and continuously monitors the  
grid. If one of the monitoring phases fails,  
or if the phase relation changes between  
the individual conductors, the Solar  
Inverter will stop the injection and only  
restart when the error has been elimina-  
ted, i. e. when the AC grid works properly  
again.  
· Insulation faults  
Prior to start-up, your Solar Inverter always  
checks the PV system for an earth fault or  
an insulation fault. Should such a fault be  
detected, the injection will not start. The  
functioning method complies with E DIN  
VDE 0126-1-1. In case of an insulation fault  
at inlet 2 of the PV generator, for example,  
«error 021» will be flagged.  
141  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error 027  
Errors 031 to 033  
· Grid overvoltage 3-phase  
· Grid overvoltage > 10 percent  
Your Solar Inverter is equipped with an  
intrinsically safe 3-phase grid monitoring  
system that complies with E DIN VDE 0126-  
1-1. The voltage level of phases L1, L2, and  
L3 is continuously monitored. If it rises  
above the maximum admissible limit value,  
the Solar Inverter will stop the injection  
and only restart when the voltage value  
drops below the maximum admissible  
limit value.  
If the voltage of the injecting phase has  
exceeded 253 V for more than ten minutes,  
the Solar Inverter will stop the injection  
and only try to restart when the grid  
voltage is within the admissible range  
again. The functioning method complies  
with E DIN VDE 0126-1-1. If the applied  
grid voltage at phase L2 is higher than  
253 V for more than 10 minutes, for  
example, «error 032» will be flagged.  
Errors 028 to 030  
Errors 034 to 036  
· Surge fault  
· Control fault  
Your Solar Inverter continuously monitors  
the quality of the AC grid. If there are high  
voltage peaks in the grid, the Solar Inverter  
will stop the injection and try to restart.  
If such a surge impulse is detected at  
energy unit 3, for example, «error 030»  
will be flagged.  
Your Solar Inverter is equipped with a self-  
monitored micro controller as a standard  
feature. If a fault occurs in the control  
sequence, the Solar Inverter will stop the  
injection and will only restart when the  
fault has been eliminated. If a fault occurs  
in the control circuit board of the third  
energy unit (upper energy unit), for exam-  
ple, «error 036» will be flagged.  
142  
Download from Www.Somanuals.com. All Manuals Search And Download.  
There are two «D302» and «D304» LEDs  
each on the three control circuit boards;  
they describe the current status of the  
Solar Inverter:  
on  
Solar Inverter is operating normally  
LED green  
Led red  
off  
blinking Solar Inverter has detected a fault  
blinking  
LED green  
LED red  
GB  
off  
on  
Internal control fault  
Led green  
LED red  
Illustr.: Operation indicator LED  
143  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3.8 Error Diagnosis  
You can look up error causes yourself in  
the following list. Select the occurred error,  
and read the «Remedies» to find out how  
to eliminate it.  
Error  
Causes  
Remedies  
Errors 001 to 003 The maximum DC voltage  
Check the rating of your PV generator.  
DC overvoltage  
has been exceeded.  
Reduce the number of modules in the  
DC inlet concerned, and recommission  
the system.  
Too many modules are  
connected in series.  
Errors 004 to 006 The grid frequency is outsi-  
Frequency fault de the admissible range.  
Ask your power supply company about  
the stability and design of the grid.  
Errors 007 to 009 The maximum admissible  
The installation site is not suitable.  
Overheating  
ambient temperature of  
40°C has been exceeded.  
Please select a different installation site.  
If contamination is blocking the cooling  
system, clean the Solar Inverter.  
The required air circulation  
was not considered during  
installation.  
144  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Error  
Causes  
Remedies  
Objects have been deposi-  
ted on the heat sink,  
Remove the objects.  
obstructing the convection.  
Errors 010 to 012 The grid voltage of the  
Ask your power supply company about  
the stability and design of the grid.  
Grid under-  
injecting phase is too low.  
The Solar Inverter monitors  
the lower and upper admis-  
sible grid voltage limits. If  
the voltage drops below the  
voltage 1-phase  
Check the rating of your grid connection  
(power meter) or the grid injection  
point to your power supply company.  
lower limit (U  
= 184 V),  
min  
the Solar Inverter will auto-  
matically switch off and will  
only restart when the volta-  
ge value rises above the  
lower limit again. The shut-  
down can already be trig-  
gered if the voltage drops  
below the lower limit for a  
short time.  
Errors 013 to 015 The grid voltage of the  
Grid overvoltage injecting phase is too high.  
Ask your power supply company about  
the stability and design of the grid.  
1-phase  
The Solar Inverter monitors  
the lower and upper admis-  
sible grid voltage limits.  
145  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
If the voltage exceeds the  
upper limit (U  
= 264 V),  
max  
the Solar Inverter will auto-  
matically switch off and will  
only restart when the volta-  
ge value drops below the  
upper limit again. The shut-  
down can already be trig-  
gered if the voltage drops  
below the lower limit for  
a short time.  
The cable cross-section of  
the AC supply line to the  
Check the rating of your grid connection  
(power meter) or the grid injection point  
Solar Inverter is insufficient. to your power supply company.  
Your solar system injects  
electricity into an insuffi-  
ciently rated spur line.  
Ask your power supply company about  
the stability and design of the grid.  
146  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
Error 016  
The grid voltage is too low.  
The Solar Inverter monitors  
the lower and upper admis-  
sible grid voltage limits in  
3-phases. If the voltage  
Ask your power supply company about  
the stability and design of the grid.  
Grid under-  
voltage 3-phase  
drops below the lower limit  
(U  
= 184 V), the Solar  
min  
Inverter will automatically  
switch off and will only  
restart when the voltage  
value rises above the lower  
limit again. The shutdown  
can already be triggered if  
the voltage drops below the  
lower limit for a short time.  
Errors 017 to 019 The AFI fault is flagged if  
AFI fault current  
The entire PV system must be checked  
fault current has penetrated for insulation faults.  
the PV system and the Solar  
Inverter has subsequently  
disconnected from the grid.  
147  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
Errors 020 to 022 During start-up, the Solar  
Check your PV system for insulation  
faults.  
Insulation fault  
Inverter has detected an  
insulation fault in the PV  
system.  
Errors 023 to 025 The Solar Inverter has detec- Restart the Solar Inverter. Should the  
DC injection  
ted a DC share > 1 A in the  
grid current.  
fault still occur, please call the technical  
hotline. The phone number is on the  
back of the user manual.  
Error 026  
Isolated opera-  
tion  
Failure of one or more of  
Check the grid phases L1, L2, and L3.  
the grid phases L1, L2, or L3.  
The position of the indivi-  
dual phase conductors in  
relation to each other has  
moved beyond the admis-  
sible tolerances.  
Ask your power supply company about  
the stability and design of the grid.  
148  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
Error 027  
The grid voltage is too high. Ask your power supply company about  
Grid overvoltage  
3-phase  
The Solar Inverter monitors  
the lower and upper admis-  
sible grid voltage limits in  
3-phases. If the voltage  
exceeds the upper limit  
the stability and design of the grid.  
(U  
= 264 V), the Solar  
max  
Inverter will automatically  
switch off and will only  
restart when the voltage  
value drops below the  
upper limit again. The shut-  
down can already be trig-  
gered if the voltage rises  
above the upper limit for  
a short time.  
Errors 028 to 030 The Solar Inverter has detec- The Solar Inverter will automatically  
Surge fault  
ted a high voltage peak in  
the injecting phase.  
restart when the error has been elimina-  
ted. Should the error occur often, please  
consult your power supply company.  
149  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
Errors 031 to 033 The grid voltage of the  
The grid impedance of your grid connec-  
ting point is too high.  
Grid overvoltage  
> 10 %  
injecting phase is too high.  
The Solar Inverter monitors  
Ask your power supply company about  
the lower and upper admis- the stability and design of the grid.  
sible grid voltage limits.  
If the voltage exceeds the  
upper limit by 10 % (U  
=
max  
253 V), the Solar Inverter  
will automatically be discon-  
nected from the grid after  
10 minutes (in compliance  
with E DIN VDE 0126-1-1).  
The cable cross-section of  
the AC supply line to the  
Check the rating of your grid connection  
(power meter) or the grid injection point  
Solar Inverter is insufficient. to your power supply company.  
Your PV system injects elec-  
tricity into an insufficiently  
rated spur line.  
Ask your power supply company about  
the stability and design of the grid.  
Errors 034 to 036 The self-monitoring Solar  
Control error  
Please call the technical hotline. The  
Inverter has detected a con- phone number is on the back of the  
trol fault. user manual.  
150  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Error  
Causes  
Remedies  
Error 038  
The back-up battery on the  
interface circuit board is  
empty.  
Have the battery (button cell) exchanged  
by a qualified person. The battery is on  
the LCD display circuit board.  
Back-up battery  
empty  
Display is blank,  
The display contrast is bad,  
That can happen if the ambient tempera-  
ture is high. As soon as the temperature  
drops, the display will work properly  
again. That does not affect the injection  
of electricity.  
despite sufficient because the temperature is  
injection  
high.  
The display circuit board is  
not supplied with electricity.  
Make sure the ribbon cable between  
the display circuit board and the control  
circuit board is not loose. For this pur-  
pose, switch the Solar Inverter off, and  
disconnect the AC and DC supply.  
When doing so, please observe chapter  
2.1 «Safety Instructions».  
The PV generator is (partly)  
covered with snow.  
Clear the snow off the PV generator,  
or wait until it has melted.  
151  
Download from Www.Somanuals.com. All Manuals Search And Download.  
152  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.0 Appendix  
153  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.1 Tyco Solarlok Connectors  
!
· Tyco Solarlok connectors may only be  
connected to permanent lines!  
Illustr.: Manual crimping tool for assembly  
of Tyco Solarlok connectors  
· They may not be disconnected under  
load!  
Contamination of any kind (dust, moisture,  
etc.) has a negative effect on the working  
order of the connector system over its aspi-  
red service life. That especially applies to  
the working order of the seals and the  
crimping of the contacts. Therefore, make  
sure everything is clean during assembly.  
· For this purpose, interrupt the electric  
circuit at a suitable point! Put a corre-  
sponding sticker on the lines near the  
Tyco Solarlok connector!  
· To avoid an electric shock, always  
disconnect the Tyco Solarlok connec-  
tors from all other voltage sources  
during preparation!  
Illustr.: Tyco Solarlok connectors  
154  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
With Tyco Solarlok connectors, different  
kinds of annular contacts are used for dif-  
ferent conductor cross-sections. Make sure  
to use the right tools for these cross-sec-  
tions. The enclosed Tyco Solarlok connec-  
tors are equipped with annular contacts  
for a cable cross-section of 4 mm. The  
enclosed seals have an internal diameter of  
6 mm (for lines with a cladding diameter  
of 5.3 to 6.2 mm) and 8 mm (for lines with  
a cladding diameter of 7.2 to 8.0 mm).  
Make sure to use a seal that fits the clad-  
ding diameter of the cable used.  
1. Bare the de-energised line by 8 mm  
2. Crimp the annular contact  
3. Slide the gland, the compression sleeve,  
and the seal onto the line  
4. Engage the contact in the connector  
housing  
GB  
5. Screw the lock nut on  
6. Tightening torque for the cable gland:  
1.5 Nm  
When installing the Tyco Solarlok connec-  
tors, proceed in the following order:  
155  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.2 List of Special Terms and Abbreviations  
Designation  
AC  
Description  
Alternating Current: grid current  
AFI, RCD  
Operator protection in the event of residual currents  
AFI: Universal Sensitive Residual Current  
RCD: Residual Current Device  
DC  
Direct Current  
PV generator side of the solar inverter  
EMC  
EB  
IC  
Electromagnetic Compatibility  
Electricity Board  
Interface Converter  
IP  
Identification of class of protection against external  
environ-mental influences (penetration of water and  
mechanical foreign bodies)  
kW  
Kilowatt  
LCD  
Liquid Crystal Display  
156  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Designation  
Description  
MPP  
Maximum Power Point  
Resistance of grid, impedance  
Temperature sensor  
Photovoltaic  
Grid impedance  
PT  
PV  
GB  
PV generator switch  
DC load break switch to cut off the PV generator  
from the solar inverter  
157  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.3 Technical Data NT 10000  
Model  
Solar Inverter NT 10000  
7000–12000 Wp  
Recommended solar generator output  
11000 W  
Nominal input  
DC  
20 W  
< 0.3 W  
7 W  
400 V  
350 <= UMPP <= 750 V  
850 V  
420 V  
Standby consumption  
Night consumption  
Injection starts from  
Nominal voltage  
UMPP voltage range  
No-load voltage  
Turn-on voltage  
340 V  
Turn-off voltage  
Maximum current  
Nominal current  
Number of inlets  
10 A per MPP multitracking inlet  
9 A per MPP multitracking inlet  
1 per MPP multitracking inlet;  
3 altogether  
96.4 percent (with ventilator operation)  
95.9 percent (with ventilator operation)  
yes  
Maximum efficiency level  
European efficiency level (weighted)  
®
HERIC topology  
10000 W  
10000 W  
50 Hz  
AC Nominal output continuous operation Pn  
Maximum output Pp  
Nominal frequency  
400 V  
Grid voltage  
-20 to +15 percent  
14.5 A  
18.2 A  
< 3 percent  
approx. 1  
sine  
Grid voltage tolerance range  
Nominal current per phase  
Max. current per phase  
Distortion factor with Pn  
Reactive power factor (cos phi)  
Current waveform  
158  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Grid voltage monitoring  
Earth-fault monitoring  
Three phase according to E DIN VDE 0126-1-1  
AFI (universal sensitive) according to E DIN  
VDE 0126-1-1  
Insulation monitoring  
Yes, according to E DIN VDE 0126-1-1  
Frequency monitoring  
Yes, according to E DIN VDE 0126-1-1  
DC monitoring  
Yes, according to E DIN VDE 0126-1-1  
Outlet characteristics  
Current source  
Grid connection fuse rating  
Required number of phases per grid connection  
Number of injection phases (230 V single-phase)  
3 x 25 A  
3
3
Data interfaces  
Sensor interfaces  
Display  
RS232, RS485, USB  
Irradiation, temperature  
LCD, 2 x 16 characters, 100 x 25 mm screen size  
Level of protection against environmental factors  
Max. relative air humidity  
Cooling  
Ambient temperature (Celsius)  
Dimensions (height x width x depth)  
Weight  
IP 54  
95 percent  
Ventilator above back panel, 2-chamber system  
-25° C to 40° C  
max. 805 x 500 x 175 (height x width x depth)  
30 kg (without assembly frame)  
Subjekt to technical changes.  
159  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.4 Conformity and Safety Declarations  
Declaration of Conformity to EU Low Voltage Directive 73/23/EEC, Appendix III B  
We hereby declare that the product described below, including the required accessories,  
conforms to the provisions of EU Directive 73/23/EEC following 93/68/EEC:  
Solar Inverter  
Product  
Sunways AG, Photovoltaic Technology  
Macairestr. 3-5, D -78467 Konstanz, Germany  
Sunways NT 10000  
Manufacturer  
Type  
15 September 2005  
As from manufacturing date  
Applied standards  
Standard  
Title  
EN 50178, EN 60950  
Electronic equipment for use in power  
installations  
Edition  
1998  
Comments  
This product is a component, which is designated for the installation in a PV system and therefore only can correspond to the  
guidelines for end devices, machines or systems depending on where it is installed in the overall PV system. The assessment of  
the electrical and mechanical safety and the environmental influences (foreign bodies, moisture) must follow in the installed  
condition in the overall PV system. In the installed condition, the EMC characteristics of this product can change. Therefore for  
the overall PV system, a check of the EMC characteristics through the final product manufacturer is practical. Changes reserved.  
The currently valid issue is available upon request.  
Constance, 13 Sept. 2005  
Place, date  
Roland Burkhardt, Executive Board  
160  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Declaration of Conformity to EMC Directive 89/336/EEC, Including Changes 91/263/EEC  
and 93/68/EEC  
We hereby declare that the product described below conforms to the provisions of EU  
Directive 89/336/EEC (EMC Directive with changes 91/263/EEC and 93/68/EEC):  
Solar Inverter  
Product  
Sunways AG, Photovoltaic Technology  
Macairestr. 3-5, D -78467 Konstanz, Germany  
Sunways NT 10000  
Manufacturer  
GB  
Type  
15 September 2005  
As from manufacturing date  
Applied standards  
Standard EN 50082-2 (EN 61000-4-2, -4-3, -4-4, -4-6, -4-8)  
EN 55014-1; EN 55011; EN 61000-3-2;  
EN 61000-3-3; E DIN VDE 0126-1-1  
Comments  
The adherence to the EMC guideline presupposes an installation of the components in the system or machine, which is suitable  
for EMC. The installation instructions in the technical documents are to be observed. The checks follow for an installation,  
which is typical for the system on a measuring station, which conforms to the norms. The legal requirements for the stability  
and the emitted interference, limit values and norms are listed in the documentation named above. The Sunways products are  
intended for the installation in a PV system. The check results are not transferable in all cases to the installed condition in the  
PV system. This declaration therefore does not contain the assurance of EMC characteristics of the final product. Changes reser-  
ved. The currently valid issue is available upon request.  
Constance, 13 Sept. 2005  
Place, date  
Roland Burkhardt, Executive Board  
161  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Safety Clearance / Certificate of Compliance with the Directives on the Connection and  
Parallel Operation of In-Plant Generation Systems to the Low-Voltage Grid (VDEW  
[German Electricity Association], 4th Edition 2001)  
We hereby declare that the following product complies with the provisions of the appli-  
cable VDE [German Association for Electrical, Electronic & Information Technologies]  
directive for operation parallel to the grid. In particular, the directives for connection and  
parallel operation of in-plant generation systems to the low-voltage grid of the energy  
supply company (VDEW 4th edition 2001) and DIN 0838 are complied with.  
Solar Inverter  
Product  
Sunways AG, Photovoltaic Technology  
Macairestr. 3-5, D -78467 Konstanz, Germany  
Sunways NT 10000  
Manufacturer  
Type  
15 September 2005  
As from manufacturing date  
Applied standards  
Norm  
Title  
In-Plant Generation Systems to the  
Low-Voltage Grid  
4th edition 2001  
Edition  
Explanations  
Sunways Solar Inverters of series NT 10000 are Solar Inverters that inject in three-phases and are not capable of isolated opera-  
tion. The NT 10000 consists of three single-phase inverters with a three-phase voltage monitoring system that inject into different  
phases. These integrated inverters control their phase angle independently of each other. They are equipped with a voltage-  
monitoring system and a three-phase monitoring system for any reduction of the linked voltage, in accordance with section 2.4.2  
of the VDEW directive (4th edition 2001). Therefore, no always accessible isolating point is required (see section 2.1.2 Schaltstelle  
mit Trennfunktion [Control Point with Disconnection Function]). A routine test is carried out with each device to make sure the  
turn-off values of the three-phase voltage reduction protection are maintained. Subject to changes. Currently valid edition availa-  
ble at request.  
Constance, 13 Sept. 2005  
Place, date  
Roland Burkhardt, Executive Board  
162  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
4.5 Terms and Conditions of  
Guarantee  
inform us beforehand, stating your name,  
address, phone number, email address (if  
applicable), and the serial number. The  
phone number is on the back of the user  
manual.  
· Duration of Guarantee  
The duration of guarantee is five years,  
starting from the day the Solar Inverter  
is purchased by the end user. The gua-  
rantee chard enclosed with the device  
must be completed and sent back to  
Sunways AG.  
The Solar Inverter may only be shipped  
with the prior approval of Sunways AG.  
The approval will be granted as soon as  
the completed fault protocol has arrived,  
stating the occurred fault and the way you  
would like the guarantee claim to be pro-  
cessed. Devices sent to Sunways AG  
without prior notification cannot be  
accepted and repaired.  
GB  
Please keep the original receipt with the  
date of purchase and the serial number.  
In case of a guarantee claim, it is requi-  
red as evidence, together with the gua-  
rantee card.  
· Conditions  
The time required to correct the fault  
must be granted. Sunways AG will try to  
correct the fault within 14 days after  
having received the device. If that is not  
possible, we will let you know the reason  
and when the fault will be corrected.  
Within the guarantee period, the Solar  
Inverter will be repaired in the factory in  
Constance, Germany, without material or  
labour being charged. Assembly costs  
shall be borne by the customer, unless  
something else has been agreed on.  
Please keep the original packaging, even  
after the guarantee period has run out.  
Forwarding companies may only accept  
the Solar Inverter if it is in the transport-  
proof original packaging. Therefore, please  
let us know if you have lost the original  
The completed guarantee card must be  
sent to Sunways AG, Constance, within  
seven days after purchase.  
In case of a guarantee claim, please  
163  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
packaging, prior to having the device pic-  
ked up. We will be glad to send you a new  
packaging against payment.  
Any further-reaching or other claims for  
direct or indirect damage, especially claims  
for compensation including ones for positi-  
ve breach of contract are excluded, unless  
they are compellingly prescribed by law.  
·
Exclusion of Liability  
Claims and liability for damage directly or  
indirectly caused by the following reasons  
are excluded:  
· interventions, changes, and repair  
attempts  
· insufficient ventilation  
· force majeure (e. g. lightning strike,  
water damage, vandalism, fire,  
overvoltage, storm, etc.)  
· inappropriate transportation  
· non-compliance with applicable regula-  
tions, or wrong installation/commissio-  
ning  
· leakage of overvoltage of the varistors  
on the DC side at the PV generator  
164  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4.6 General Exclusion of Liability  
All rights reserved. © Sunways AG  
Although the accuracy and completeness  
of the information in this manual have  
carefully been checked, no liability what-  
soever can be accepted for mistakes or  
omissions.  
The products named in the title are protec-  
ted by copyright and are sold under license.  
Without a prior written permission of  
Sunways AG and the Sunways licensors, no  
part of this document may be reproduced  
in any form.  
· Sunways AG reserves the right to chan-  
ge the hardware and software features  
described here at any time, without  
prior notification.  
Registered trademark  
GB  
Sunways NT 10000 and the Sunways logo  
are registered trademarks of Sunways AG,  
Constance, Germany.  
· Without the prior written approval of  
Sunways AG, this manual may not be  
duplicated, transferred, copied, or trans-  
lated into other languages in any form  
or by any means, in part or in whole.  
· Sunways AG does not accept responsibi-  
lity for damage caused by false or lost  
data due to wrong operation or mal-  
functions of the Solar Inverter, the soft-  
ware, additional devices, or PCs.  
®
HERIC is a registered trademark of  
Fraunhofer Gesellschaft, Munich, Germany.  
165  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Sunways AG  
Photovoltaic Technology  
Macairestraße 3 - 5  
D -78467 Konstanz  
Telefon +49 7531 996770  
Fax +49 7531 99677444  
E-Mail info@sunways.de  
Technische Hotline +49 7531 99677577  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Sharp Air Conditioner AF Q60PX User Manual
Sharp Blu ray Player BD HP25A User Manual
Singer CD Player ACC 31 User Manual
Soleus Air Air Conditioner GM TTW 10HC User Manual
Sony Flat Panel Television 50R550A User Manual
Sony Security Camera SNCZM550 User Manual
Sony Speaker System ZS 2000 User Manual
Sony Webcam VPCM1 User Manual
Surf Control Welder 524 User Manual
Tanaka Brush Cutter TBC 220 User Manual