INSTALLATION AND OPERATION INSTRUCTIONS
BEER PUMP PANELS
MODEL NO.
63134-1
63134-2
63134-3
63134-4
IMPORTANT INFORMATION
Table of Contents
This manual has been prepared to assist you in the
operation of Perlick Beer Pump Panel System.
Installing the Panel ..............................................2
Panel Diagram .....................................................3
How to Operate the Beer Panel...........................4
Beer Pump Diagram ............................................5
Cleaning Diagram ................................................6
Cleaning Instructions ...........................................7
Winterizing a System with Beer Pumps...............7
Replacement Parts ..............................................7
We dedicate considerable time to ensure that our
products provide the highest level of customer
satisfaction. If service is required, your dealer can
provide you with a list of qualified service agents. For
your own protection, never return merchandise for
credit without our approval.
We thank you for selecting a Perlick product and
assure you of our continuing interest in your
satisfaction.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Download from Www.Somanuals.com. All Manuals Search And Download.
Diagram – Beer Pump Panel Diagram
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
3
Download from Www.Somanuals.com. All Manuals Search And Download.
How to Operate – Beer Pump Panels
■ Adjust primary CO2 regulator by turning
adjusting screw counterclockwise until it turns
freely, then turn hand valve counterclockwise on
CO2 cylinder to the fully open position. Next, turn
regulator adjusting screw clockwise until desired
pressure is reached.
■ Connect the coupler to a regulated water supply
with pressure less than 30 psig. Note: Pump
damage may occur with pressure higher
than 30 psig.
■ Open the water supply. Then open probe valve
on Perlick Smart coupler to the 45° position.
See figure 2. The beer pump will slowly pump
up the beer line in the trunk housing to set psig.
Note: If pump continues to run for longer than
expected, check lines for possible leaks at one
or more of the connections.
■ Gradually increase secondary regulator
pressure to the designed system pressure to
achieve a flow rate of one gallon per minute
from the dispensing head. Note: Maximum
beer pump operating pressure is 90 psig.
■ Open dispensing head faucet to purge air
trapped within the tubing.
Note: If CO2 is only being used for keg-
applied pressure, adjust to approximately
40 psig. If CO2 is being used to supply
beer pumps, adjust to the required system
pressure plus an additional 15 psig.
■ Adjust the air compressor output regulator
pressure to a minimum of 15 psig. greater than
the maximum required system pressure required
to operate the beer pumps. Maximum setting
100 psig.
■ Adjust secondary CO2 regulator which
supplies the keg pressure located on the
beer pump panel to the proper pressure
setting. Setting depends on beer brand and
temperature. Desired goal is to maintain the
natural carbonation in the beer. Open the shut-
off valves.
■ Ensure the Probe Valve on the Perlick Smart
Coupler is in closed position. See figure 1.
Ensure the Beer Pump Flow Reversal/Dispense
handle is in the dispense position. Adjust the
Secondary Air/ CO2 regulator located on the
beer pump panel to a minimum operating
pressure of 10 psig.
■ Check all gas and liquid line fittings and
connections for leaks.
■ Close probe valve on Perlick Smart Coupler.
(See figure 1) and disconnect coupler from
regulated water source.
■ Clean beer system. After cleaning and rinsing
the system, make sure the beer line is full of
cold water (beer dispensing from warm beer
lines will be poor quality).
■ Tap fresh keg with Perlick Smart Coupler. Open
dispensing head faucet until clear beer flows.
Smart Coupler Probe Valve Lever Positions
Figure 1
Figure 2
Figure 3
Open Position
Closed Position
45° or Cleaning Position
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
4
Download from Www.Somanuals.com. All Manuals Search And Download.
Diagram #2 – Beer Pump
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
5
Download from Www.Somanuals.com. All Manuals Search And Download.
Diagram #3 – Cleaning Diagram
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
6
Download from Www.Somanuals.com. All Manuals Search And Download.
Cleaning Instructions
■ Disconnect line-cleaning pump.
General Information
■ Remove and clean taps and couplers.
■ Reconnect taps and couplers and return Beer
Pump Dispense/Reverse Flow valve to the
Dispense position.
■ Reconnect couplers to keg and open dispensing
head faucets until clear beer flows.
■ The cleaning of beer lines with the new integral
flow reversal feature incorporated into the
Perlick Beer Pump gives the line cleaner
numerous configurations for line cleaning.
Although the Perlick Beer Pump can be used as
an in-line pump for moving the solution from the
coupler to the faucet due to its capability of
working with negative lift, the following is the
recommended method for cleaning beer lines
with the Perlick Beer Pump with integral flow
reversal installed.
Winterizing Systems with Beer Pumps
■ When a beer system with beer pumps will be
shut down for an extended period, clean the
system thoroughly. After completing the rinsing
step, prepare a mixture of 50% food grade
Glycerine and 50% water. Load the lines with
this mixture and make sure both ends of the
system are closed. Glycerine/water mixture
should remain in the lines for the duration of
the shutdown period.
Cleaning from the Tap/Faucet End
■ Disconnect Perlick Smart Couplers from the
kegs following Smart Coupler instructions.
■ Couple the two Smart Couplers together using
Dual Cleaning Adapters (43681) which have a
pin of sufficient length to lift the internal slide
within the Smart Coupler to allow proper flow.
■ Determine which sets of lines will be cleaned
together and rotate the Dispense/Reverse Flow
handle to the Reverse Flow position on the line
which fluid will be pushed back from the
Tap/Faucet.
Replacement Parts
44...................Air valve
40115 .............Regulator body
40129.............Regulator body
43553A...........Regulator repair kit
■ Rotate the Smart Coupler Valve Handle to the
Clean position on both couplers (See Smart
Coupler Instructions).
2
63705.............Beer pump, Flo-Jet, w/CO elbow
■ Relieve the line pressure by opening the
faucets.
63706.............Flow reversal valve
63707.............Elbow, flow reversal, 2/bag
■ Remove the faucet from the line, which will
have the Beer Line Cleaner pump connected
to it.
63708.............Fitting, tee, gas, barbed 1/4” with
check valve
63709 ..............Fitting, elbow, gas, barbed 1/4” with
check valve
■ Connect Beer Line Cleaner pump to the shank.
■ Follow standard line cleaning procedures.
Perlick recommendes that the lines first be
flushed with clean warm water (Water tempera-
ture not to exceed 100°F). Mix line-cleaning
solution per the manufacturer’s directions.
Circulate the solution thoroughly (Time for
circulation dependent on the length of the
system and pump capabilities). Rinse the lines
using clean cold water (Ensure all line cleaning
solution has been removed from the lines to
prevent hazardous results).
2
63710.............Beer pump, Flo-Jet, w/CO tee
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
7
Download from Www.Somanuals.com. All Manuals Search And Download.
8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A
Rev. 08.24.04
Download from Www.Somanuals.com. All Manuals Search And Download.
|