©2008 Pella Corporation
Part Number: 80GZ0102
INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION
ADVANCED PERFORMANCE AND HURRICANESHIELD® IMPACT RESISTANT
CLAD FRAME AND CIRCLE HEAD WINDOWS IN WOOD FRAME CONSTRUCTION
These instructions were tested and are Dade County certified for single laminated glass and
ASTM (Hallmark) certified for laminated insulating glass.
Important Safety Information:
Pella® HurricaneShield® products have been tested in accordance with the large missile impact
testing requirements of ASTM E 1886 and ASTM E 1996. Pella HurricaneShield products are
neither hurricane proof nor are they shatter proof. Severe wind and rain may produce temporary
conditions which exceed product performance standards. When these units are subjected to
intense storms or extreme conditions, which exceed the intended design pressures, air, water and
flying debris infiltration may occur. The performance of any building is dependent upon the
design, installation, and workmanship of the entire building system. Pella Corporation strongly
recommends consulting an experienced architect, contractor, or structural engineer prior to
installation of Pella products.
The individual (building owner, architect, contractor, installer and/or consumer) responsible
for the project must take into account local conditions, building codes, inherent component
limitations, the effects of aging and weathering on building components, and other design issues
relevant to each project. The determination of the suitability of all building components for each
project, as well as the design and installation of flashing and sealing systems, are the responsibility
of the building owner, architect, contractor, installer and/or consumer.
5PQ
'MBTIJOHꢀ
5BQF
0VUFSꢀ
0VUFSꢀ
7FSUJDBM
'MBTIJOHꢀ
5BQF
7FSUJDBM
'MBTIJOHꢀ
5BQF
0VUFSꢀ$PSOFS
'MBTIJOHꢀ5BQF
4JEF
'MBTIJOH
5BQF
'JOꢀ$PSOFS
/BJMJOHꢀ'JO
4JEF
'MBTIJOH
5BQF
4JMMꢀ'MBTIJOHꢀ5BQFꢀꢁꢂ
4JMMꢀ'MBTIJOHꢀ5BQFꢀꢁꢃ
8BUFSꢀ3FTJTUJWFꢀ#BSSJFS
4IFBUIJOH
'SBNJOH
Always read the Pella® Limited Warranty before purchasing or installing Pella products. By installing
this product, you are acknowledging that this Limited Warranty is part of the terms of the sale. Failure
to comply with Pella installation and maintenance instructions may void your Pella product warranty.
See Limited Warranty for complete details at http://warranty.pella.com.
Download from Www.Somanuals.com. All Manuals Search And Download.
E. Apply sill flashing tape #1. #UT A PIECE OF mASHING TAPE ꢂꢃꢅ
longer than the opening width. Apply at the bottom of the
OPENING AS SHOWN ꢁꢂ% SO IT OVERHANGS ꢂꢅ TO THE EXTERIORꢇ
ꢂꢇ
ꢆꢇ
ꢀ&
Note: The tape is cut 12" longer than the width so that it
will extend 6" up each side of the opening.
ꢂꢌꢃꢇ
ꢂꢌꢃꢇ
F. Tab the sill flashing tape and fold. #UT ꢂꢅ WIDE TABS AT EACH
CORNER ꢁꢂꢀꢃꢅ FROM EACH SIDE OF CORNER ꢁꢂ& ꢇ &OLD TAPE TO THE
exterior and press firmly to adhere it to the water resistive barrier.
ꢀ'
'ꢇ Apply sill flashing tape #2. #UT A PIECE OF mASHING TAPE ꢂꢃꢅ LONGER THAN THE OPENING WIDTHꢇ
!PPLY AT THE BOTTOMꢎ OVERLAPPING TAPE ꢈꢂ BY AT LEAST ꢂꢅꢇ $/ ./4 ALLOW THE TAPE TO EXTEND
PAST THE INTERIOR FACE OF THE FRAMING ꢁꢂ' ꢇ
Note: The flashing tape may not fully cover framing members.
H. Install and level sill spacers. Place
ꢂꢇ
ꢂꢅ WIDE BY ꢂꢀꢆꢅ THICK SPACERS ON THE
ꢀ)
BOTTOM OF THE WINDOW OPENING ꢂꢀꢃꢅ
from each side. Spacers are also required
at points where windows are joined
in multiple window applications. Add
shims as necessary to ensure the spacers
are level. Once level, attach spacers and
shims to prevent movement.
ꢀ(
Note: Improper placement of shims
or spacers may result in bowing the
bottom of the window.
WINDOW PREPARATION
2
6" MAX
A. Remove plastic wrap and cardboard packaging from window.
FOR PLACEMENT
OF FRAME
SCREWS AND
INSTALLATION
CLIPS
Note: If screens, grilles or hardware are removed from the
window at this time, label them and store them in a protected
area.
10"
MAX
10"
MAX
For installation using installation clips, preceed to Step C.
10"
B. Windows using frame screws:
MAX
Pre-drill installation screw holes.
On the room side of the window,
DRILL ꢂꢉꢀꢌꢆꢅ DIAMETER CLEARANCE
holes through the frame as shown
on the placement diagram.
ꢁ#
6" MAX
%SJMMꢀꢂꢊꢌꢆꢄꢇ
6" 10"
10"
6"
DMFBSBODFꢀIPMF
ꢂꢍꢂꢌꢃꢇ
MAX MAX MAX MAX
Space the holes a maximum
OF ꢌꢅ FROM EACH END AND A
MAXIMUM OF ꢂꢄꢅ ON CENTER ON
the head, jambs and sill.
$MBEꢀ'SBNFꢀ4JMM
ꢁ$
C. Fold out installation fin to 90°. Be careful not to remove
or tear the fin corners.
Note: If the fin is not at 90°, the window will not line up
correctly on the interior.
#6 x 5/8” corrosion
resistant screws
6“ from end
D. Windows using Installation Clips: Install installation
clips. Place the clip so that the lip is facing up and against
the installation fin, at the locations shown in the placement
DIAGRAMꢇ 3ECURE THE CLIP BY DRIVING ꢈꢌ X ꢋꢀꢍv CORROSION
resistant screws through the outer two holes of the three
holes shown.
Lip
2D
Download from Www.Somanuals.com. All Manuals Search And Download.
SETTING AND FASTENING THE WINDOW
3
TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS.
A. Insert the window from the exterior of the building.
Place the bottom of the window on the spacers at
the bottom of the opening, then tilt the top into
position. Center the window between the sides of the
opening to allow clearance for shimming, and insert
one roofing nail in the first hole from the top of each
jamb nailing fin. These are used to hold the window
ꢂ"
in place while shimming it plumb and square.
B. Plumb and square window. Place shims between
the window frame and the rough opening at each
installation screw hole. Adjust the shims as required
to plumb and square the window in the opening.
ꢂ#
Note: DO NOT over shim.
*OUFSJPS
C. Check the interior reveal. Make sure the
measurement from the interior face of the window to
the interior face of the wall is equal at several points
around the window.
ꢂ$
ꢀ
*/$)&4
NN
Note: If the dimensions are not equal, check
to make sure the fins are folded out to 90° at
all points.
ꢁ
ꢃ
ꢁ
ꢂ
ꢂ
ꢃ
ꢄ
ꢃ
ꢅ
ꢃ
ꢆ
ꢃ
ꢇ
ꢃ
D. Fasten the window to opening. On windows with a fixed
EXTRUDED lNꢎ DRILL ꢂꢀꢍꢅ DIAMETER HOLES IN THE lN
EVERY ꢂꢃꢅꢇ $RIVE A ꢃꢅ GALVANIZED ROOlNG NAIL
INTO EACH OF THE PREꢊPUNCHED AND PREꢊDRILLED
holes.
&YUFSJPS
For flexible fins: Drive nails until the head
ꢂ%
contacts the fin, however DO NOT sink
ꢂ%
the head. This allows for movement of
building materials.
Note: Make sure the fin corner is lying as
flat as possible.
Download from Www.Somanuals.com. All Manuals Search And Download.
INTEGRATING THE WINDOW TO THE WATER RESISTIVE BARRIER
4
A. Units that do not have pre-applied fin
corners: Cut four pieces of flashing tape
ꢂꢊꢂꢀꢃꢅ LONGꢇ !PPLY ONE PIECE OF mASHING
tape to each end of the sill fin so that it
EXTENDS ꢂꢊꢂꢀꢃꢅ PAST THE END OF THE SILL
fin. Apply one piece of flashing tape to
the bottom end of each flexible vinyl fin,
BEGINNING ꢂꢊꢂꢀꢃꢅ FROM THE END OF THE lNꢎ
and lapping over the flashing tape that
extends from the end of the sill fin.
ꢄ"
ꢂTU
ꢄ"
ꢃOE
Note: The flashing tape must be applied approximately 1/2"
onto the frame cladding at the jambs and head. Pre-folding the
tape at 1/2" before removing the paper backing will make it
easier to apply the tape correctly. If the siding is less than 1/2"
thick, adjust the dimension of the fold so the exterior sealant
line will cover the exterior edge of the tape.
B. Apply side flashing tape. #UT TWO PIECES OF mASHING TAPE ꢋꢅ LONGER
than the frame height of the window. Position the tape so it laps
ꢂꢀꢃꢅ ONTO THE FRAME CLADDINGꢎ COVERS THE lN AND LAPS ONTO THE WATER
RESISTIVE BARRIERꢇ 4HE TAPE SHOULD EXTEND ꢃꢅ ABOVE THE TOP OF THE
WINDOW AND ꢉꢅ BELOW THE BOTTOM OF THE WINDOWꢇ 0RESS THE TAPE DOWN
firmly while folding down the excess tape at the top and bottom of
the window.
Note: DO NOT tape or seal the bottom nailing fin.
ꢄ#
C. Circle top window:
Apply top flashing tape. First layer: Several pieces of flashing tape will be needed
to cover the top fin. Start taping from the sides of the window working toward the
peak. To determine the length of cuts, hold the tape along the radius, and cut the
tape just past where it leaves the top fixed extruded fin or for the flexible fin, just
PAST THE mEXIBLE WEATHERꢊ
strip. The top tape must
overlap the one beneath
it in order to divert water
properly. The sharper the
arc of the window, the
shorter the pieces of tape
will be.
&YUFSJPS
ꢄ$
'JSTUꢀ-BZFS
ꢄ$
Second layer: Apply a
second layer of tape just
above and overlapping the
first layer of flashing tape by
ꢂꢅ AND OFFSETTING THE SEAMS
of the first layer. Press the
tape down firmly.
4FDPOEꢀ-BZFS
Download from Www.Somanuals.com. All Manuals Search And Download.
C1. Rectangular window:
Apply top flashing tape. Cut two pieces of flashing tape
long enough to go across the top of the window and
EXTEND ꢂꢅ PAST THE mASHING TAPE ON BOTH SIDESꢇ !PPLY
ONE PIECE OF TAPE LAPPING IT ꢂꢀꢃꢅ ONTO THE FRAME
cladding, covering the fin and lapping onto the
water resistive barrier. Fold the overlapping tape
down, and press all tape down firmly. Apply the
second piece of tape just above and overlapping
THE lRST PIECE OF mASHING TAPE BY ꢂꢅꢇ 0RESS THE
tape down firmly.
ꢄ$ꢀ
ꢄ$ꢀ
ꢂꢇ
ꢂꢇ
#ꢃꢇ Angle top window:
Apply top flashing tape. /N THE SHORT SIDE OF A TRAPEZOID
window, DO NOT allow the side flashing tape to extend higher
than the top tape will cover.
ꢄ%
&YUFSJPS
D. Fold down top flap OF WATER RESISTIVE BARRIER ꢁꢆ$ ꢇ
E. Apply flashing tape to diagonal cuts. Cut
PIECES OF mASHING TAPE AT LEAST ꢂꢅ LONGER THAN
the diagonal cuts in the water resistive
ꢄ&
barrier. Apply the tape covering the entire
diagonal cut in the resistive water barrier
at both upper corners of the window.
ꢄ&
Note: Be sure to overlap the top
corners (4E).
Note: If installing the window using installation
clips, proceed to Step 6 - Installation Clip Method.
SECURING THE WINDOW
5
A. Install a #10 x 3-1/2" corrosion resistant wood
screw INTO EACH PREꢊDRILLED SCREW HOLEꢇ
#10 x 3-1/2"
corrosion
resistant
Note: Minimum 1-1/4" embedment into the
wall framing is required.
5A
wood screw
Proceed to Step 7.
INTERIOR
INSTALLATION CLIP METHOD
6
A. Fasten the window to the opening BY DRIVING TWO ꢈꢌ ꢂꢊꢂꢀꢃv OR LONGER
CORROSION RESISTANT SCREWS INTO THE PREꢊPUNCHED HOLES IN THE CLIPSꢇ )F
clips are bent and fastened to the interior stud/block, install the screws
as close to the bend as possible.
6A
Note: DO NOT shim above the window. For masonry openings use
two 3/16” x 1-1/2” masonry screws per clip. Pre-drill the masonry
before attempting to drive the screws in.
Download from Www.Somanuals.com. All Manuals Search And Download.
INTERIOR SEAL
7
Caution: Ensure use of low pressure polyurethane window and door insulating foams
and strictly follow the foam manufacturer’s recommendations for application. Use of high
pressure foams or improper application of the foam may cause the window frame to bow
and hinder operation.
A. Apply insulating foam sealant. &ROM THE INTERIORꢎ INSERT THE NOZZLE
*OUFSJPS
OF THE APPLICATOR APPROXIMATELY ꢂꢅ DEEP INTO THE SPACE BETWEEN THE
WINDOW AND THE ROUGH OPENING AND APPLY A ꢂꢅ DEEP BEAD OF FOAMꢇ
4HIS WILL ALLOW ROOM FOR EXPANSION OF THE FOAM AND WILL MINIMIZE
SQUEEZE OUTꢇ )F USING FOAM OTHER THAN 'REAT 3TUFF - 7INDOW
and Door Insulating Foam Sealant by the Dow Chemical
ꢆ"
Company, allow the foam to cure completely
ꢁUSUALLY ꢍ TO ꢃꢆ HOURS BEFORE PROCEEDING TO
the next step.
Note: DO NOT completely fill the space from the
back of the fin to the interior face of the opening.
SEALING THE WINDOW TO THE EXTERIOR WALL CLADDING
8
When applying siding, brick veneer or other exterior finish material, leave adequate space
between the window frame and the material for sealant. Refer to the illustration that
corresponds to your finish material.
Note: The sealant details shown are standard recommendations from the sealant industry.
Contact your sealant supplier for recommendations and instructions for these and any
other applications.
7*/:-ꢌ45&&-
4*%*/(
#3*$,ꢀ7&/&&3
#BDLFSꢀ3PEꢀ
BOE
4FBMBOUꢀ
UZQJDBM
#BDLFSꢀ3PEꢀBOE
4FBMBOUꢀUZQJDBM
ꢂꢌꢄꢇꢀ$MFBSBODF
ꢂꢌꢄꢇꢀ
$MFBSBODF
"DDFTTPSZꢀ
(SPPWF
*OTVMBUJOH
GPBN
*OTVMBUJOH
GPBN
"DDFTTPSZꢀ(SPPWF
1FSJNFUFSꢀ4FBMBOUꢀ
NVTUꢀFYUFOEꢀUPꢀ
SPPNTJEFꢀPGꢀ
1FSJNFUFSꢀ4FBMBOUꢀ
NVTUꢀFYUFOEꢀUPꢀ
SPPNTJEFꢀPGꢀ
"DDFTTPSZꢀ(SPPWFꢉ
"DDFTTPSZꢀ(SPPWFꢉ
ꢂꢌꢄꢇ
ꢂꢌꢄꢇ
4*%*/(
8*5)ꢀ53*.
ꢂꢌꢄꢇ
.JOꢉ
4FBMBOUꢀUZQJDBM
ꢂꢌꢄꢇ
.JOꢉ
ꢂꢌꢄꢇꢀ$MFBSBODF
*OTVMBUJOH
GPBN
"DDFTTPSZꢀ(SPPWF
1FSJNFUFSꢀ4FBMBOUꢀ
NVTUꢀFYUFOEꢀUPꢀ
SPPNTJEFꢀPGꢀ
"DDFTTPSZꢀ(SPPWFꢉ
ꢂꢌꢄꢇ
800%
4*%*/(
#BDLFSꢀ3PEꢀ
BOE
4FBMBOUꢀ
UZQJDBM
456$$0
ꢂꢌꢄꢇꢀ
4FBMBOUꢀUZQJDBM
ꢂꢌꢄꢇꢀ$MFBSBODF
$MFBSBODF
*OTVMBUJOH
GPBN
"DDFTTPSZꢀ
(SPPWF
*OTVMBUJOH
'PBN
1FSJNFUFSꢀ4FBMBOUꢀ
NVTUꢀFYUFOEꢀUPꢀ
SPPNTJEFꢀPGꢀ
"DDFTTPSZꢀ(SPPWFꢉ
ꢂꢌꢄꢇ
ꢂꢌꢄꢇ
ꢂꢌꢄꢇ
.JOꢉ
Download from Www.Somanuals.com. All Manuals Search And Download.
SEALING THE WINDOW TO THE EXTERIOR WALL
CLADDING (continued)
8
A. Insert backer rod into the space around the window to provide approximately
ꢂꢀꢆꢅ CLEARANCE BETWEEN THE BACKER ROD AND THE EXTERIOR FACE OF THE WINDOWꢇ
Note: Backer rod adds shape and depth for the
sealant line.
B. Apply a bead of high quality exterior grade sealant to
ꢇ"
the entire perimeter of the window.
Note: For wood siding applications, when using the
flexible fin, ensure the sealant bead covers the exterior
edge of the fin weather-strip.
C. Shape, tool and clean excess sealant. When finished,
the sealant should be the shape of an hourglass.
Note: This method creates a more flexible sealant
line capable of expanding and contracting.
ꢇ#
9INTERIOR FINISH
If products cannot be finished immediately, cover with clear plastic to protect from dirt, damage and
MOISTUREꢇ 2EMOVE ANY CONSTRUCTION RESIDUE BEFORE lNISHINGꢇ 3AND ALL WOOD SURFACES LIGHTLY WITH ꢂꢍꢄ
GRIT OR lNER SANDPAPERꢇ $/ ./4 USE STEEL WOOLꢇ "% #!2%&5, ./4 4/ 3#2!4#( 4(% ',!33ꢇ
Remove sanding dust.
Pella products must be finished per the below instructions; failure to follow these instructions voids the
Limited Warranty.
s /N CASEMENT AND AWNINGSꢎ IT IS OPTIONAL TO STAIN OR lNISH THE VERTICAL AND HORIZONTAL SASH EDGESꢇ
s /N SINGLEꢊHUNG AND DOUBLEꢊHUNGꢎ DO NOT PAINTꢎ STAIN OR lNISH THE VERTICAL SASH EDGESꢎ ANY lNISH
on the vertical sash edges may cause the sash to stick; it is optional to paint, stain or finish the
HORIZONTAL SASH EDGESꢇ
s /N PATIO DOORSꢎ IT IS OPTIONAL TO PAINTꢎ STAIN OR lNISH THE VERTICAL AND HORIZONTAL PANEL EDGESꢇ
Note: To maintain proper product performance do not paint, finish or remove the weather-
stripping, mohair dust pads, gaskets or vinyl parts. Air and water leakage will result if these
parts are removed. After finishing, allow venting windows and doors to dry completely before
closing them.
Pella Corporation is not responsible for interior paint and stain finish imperfections for any product
THAT IS NOT FACTORYꢊAPPLIED BY 0ELLA #ORPORATIONꢇ 5SE OF INAPPROPRIATE lNISHESꢎ SOLVENTSꢎ BRICKWASHꢎ OR
cleaning chemicals will cause adverse reactions with window and door materials and voids the
Limited Warranty.
For additional information on finishing see the Pella Owner’s Manual or got to www.pella.com.
EXTERIOR FINISH
The exterior frame and sash are protected by aluminum cladding with our tough EnduraClad® or
%NDURA#LAD 0LUS BAKEDꢊON FACTORY lNISH THAT NEEDS NO PAINTINGꢇ #LEAN THIS SURFACE WITH MILD SOAP AND
water. Stubborn stains and deposits may be removed with mineral spirits. DO NOT use abrasives.
DO NOT scrape or use tools that might damage the surface.
Use of inappropriate finishes, solvents, brickwash or cleaning chemicals will cause adverse reactions
with window and door materials and voids the Limited Warranty.
CARE AND MAINTENANCE
Care and maintenance information is available in the Pella Owner’s Manual. You can obtain an owner’s
manual by contacting your local Pella retailer. This information is also available on www.pella.com.
Download from Www.Somanuals.com. All Manuals Search And Download.
IMPORTANT NOTICE
Because all construction must anticipate some water infiltration, it is important that the wall system be
designed and constructed to properly manage moisture. Pella Corporation is not responsible for claims
or damages caused by anticipated and unanticipated water infiltration; deficiencies in building design,
construction and maintenance; failure to install Pella® products in accordance with Pella installation
instructions; or the use of Pella products in wall systems which do not allow for proper management
of moisture within the wall systems. The determination of the suitability of all building components,
including the use of Pella products, as well as the design and installation of flashing and sealing systems
are the responsibility of the Buyer or User, the architect, contractor, installer, or other construction
professional and are not the responsibility of Pella.
Pella products should not be used in barrier wall systems which do not allow for proper management of
moisture within the wall systems, such as barrier Exterior Insulation and Finish Systems (EIFS)
ꢁALSO KNOWN AS SYNTHETIC STUCCO ꢎ OR OTHER NONꢊWATER MANAGED SYSTEMSꢇ %XCEPT IN THE STATES OF
#ALIFORNIAꢎ .EW -EXICOꢎ !RIZONAꢎ .EVADAꢎ 5TAHꢎ AND #OLORADOꢎ Pella makes no warranty of any kind
and assumes no responsibility for Pella windows and doors installed in barrier wall systems. In
the states listed above, the installation of Pella products in barrier wall or similar systems must be
in accordance with Pella installation instructions.
Product modifications that are not approved by Pella Corporation will void the Limited Warranty.
ADDITIONAL CUTTING PATTERNS
)BMGꢀ$JSDMF
2VBSUFSꢀ$JSDMF
'VMMꢀ$JSDMF
0WBM
$JSDMFꢀ)FBE
"SDIꢀ)FBE
%PHꢀ)PVTF
5SBQF[PJE
3JHIUꢀ5SJBOHMF
0DUBHPO
3FDUBOHMF
Download from Www.Somanuals.com. All Manuals Search And Download.
|