Installation and Assembly - Side to Side Adapter Mount
Models: ACC 830
IMPORTANT! Read entire instruction sheet before
you start installation and assembly.
WARNING
• Installer must verify that the ceiling will safely support
four times the combined weight of all attached equip-
ment and hardware.
Before you start check the parts list below to
make sure all of the parts shown are included.
Parts List
Description
Part Number
Qty.
B
A
B
C
D
bracket
055-1184
580-0004
520-1106
520-1084
1
1
1
1
LCD flush mount tube
#10-32 x 1/8 socket pin screw
#10-32 x 3/8 socket pin screw
A
Note: Actual parts may appear slightly different than illustrated.
C
D
Attach adapter bracket (A) to bottom exten-
sion column (sold separately). Thread flush
mount tube (B) into bracket (A) as shown until
it is threaded all the way down.
Side to side adjustment is accomplished by
rotating adapter bracket (A) about extension
column. Lock into position by screwing 1/8"
long socket pin screw (C) into hole as shown,
jamming screw into threads. For extra
security, align one of the three holes in
adapter bracket (A) with notch in column,
then fasten 3/8" long socket pin screw (D)
into hole and through notch.
ExtensionColumn
(sold separately)
Note: The socket pin tool is sold with the
Vector Pro projector mount.
B
A
PJC unit or
Accessories
C
D
Notch
ISSUED:01-08-01 SHEET#: 055-9075-3 08-06-04
1 of 1
For customer service call 1-800-729-0307 or 708-865-8870.
©2004PeerlessIndustries,Inc. Allrightsreserved.
PeerlessisaregisteredtrademarkofPeerlessIndustries,Inc.
Allotherbrandandproductnamesaretrademarksorregisteredtrademarksoftheirrespectiveowners.
Download from Www.Somanuals.com. All Manuals Search And Download.
|