Installation and Assembly -Ceiling Mount for
NEC NP 40/41/50/60/61/62/100/200 Projectors
Model: NP40CM
NEC DISPLAY SOLUTIONS OF AMERICA, INC.
This product is intended for use with UL
Listed products and must be installed by a
qualified professional installer.
R
Maximum Load Capacity: 50 lb (22.7 kg)
Read instruction sheet before you start installation and assembly.
WARNING
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and
components.
IMPORTANT! Be sure not to touch the projector while tightening the set screw on the
ball and socket mount. This may cause the image to be unaligned when you let go.
IMPORTANT! Turn to the appropriate page for your ceiling installation.
Applications:
FlushMount .................................................................................................................................................. page 5
ExtensionColumn........................................................................................................................................ page 6
Installations:
To Wood Joist Finished Ceilings,
Exposed Wood Joists, or Wood Beam Ceilings........................................................................................ page 3
To Concrete Ceilings.................................................................................................................................... page 4
1 of 8
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation To Wood Joist Finished Ceilings,
Exposed Wood Joists, or Wood Beam Ceilings
Drill two 5/32" (4 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach ceiling plate (G)
with two #14 x 2.5" (6 mm x 65 mm) wood
screws (F) as shown using 3/8" (10 mm) socket
wrench.
WOOD
JOIST
Skip to step 2.
CEILING
WARNING
• Tighten wood screws (F) so that ceiling plate (G) is
firmly attached, but do not overtighten. Overtightening
can damage the screws, greatly reducing their holding
power.
G
• Never tighten in excess of 80 in • lb (9 N.M.).
• Make sure that mounting screws are anchored into the
center of the studs. The use of an "edge to edge" stud
finder is highly recommended.
F
F
WARNING
• It is the responsibility of the installer to verify that the
supporting surface will safely support the combined
load of all attached hardware and components.
IMPORTANT: Be sure to drill holes into the
joistCENTER!
WOOD
JOIST
For optional Cord Management,
install two spacers (H) between ceiling
plate (G) and ceiling.
CEILING
H
H
G
F
F
3 of 8
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
WARNING
• When installing Peerless mounts on concrete, verify that you have a minimum of 1 5/8" of actual concrete surface in
the 1/4" diameter hole to be used for the concrete anchors. Do not drill into mortar joints! Concrete must meet ASTM
C-90 specifications.
• Concrete must be 2000 psi density minimum. Lighter density concrete may not hold concrete anchor.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
• Never exceed the Maximum UL Load Capacity of 50 lb (27 kg).
Installation to Concrete Ceilings
ACC 203 (Alligator® concrete anchors) are recommended.
Drill two 1/4" (6 mm) dia. holes to a minimum depth of
2.5" (64 mm). Attach ceiling plate (G) using two
concrete anchors and #14 x 2.5" wood screws (F) as
shown in Illustration A and 1, 2, and 3 (below).
Tightenallfasteners.
concrete
anchor
CONCRETECEILING
IMPORTANT: It is the responsibility of the installer
to verify that the ceiling will safely support the
combined load of all attached hardware and
components.
WARNING
G
• Tighten wood screws so that ceiling plate is firmly
attached, but do not overtighten. Overtightening can
damage the screws, greatly reducing their holding
power.
F
• Never tighten in excess of 80 in • lb (9 N.M.).
• Make sure that mounting screws are anchored into the
center of the studs. The use of an "edge to edge" stud
finder is highly recommended.
Illustration A
WARNING
concrete
ceiling
1
• FOR DIRECTATTACHMENT TO LOAD BEARING
CONCRETE ONLY! Concrete expansion anchors are
not intended for attachment to concrete ceilings
covered with a layer of plaster, drywall, or other
finishing material. If mounting to concrete ceiling
covered with plaster / drywall is unavoidable, plaster /
drywall must be counterbored as shown below.
concrete
anchor
Drill hole and insert anchor
2
G
concrete
anchor
F
INCORRECT
CORRECT
Place ceiling plate over anchor and secure with screw
metal
bracket
metal
bracket
concrete
3
concrete
concrete
anchor
F
plaster/
dry wall
plaster/
dry wall
After repeating step one tighten all fasteners
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
4 of 8
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
Flush Mount Application
Screw ball and socket mount (A) into ceiling plate (G). Align the notch with one of the four holes of the ceiling plate
(G) and secure ball and socket mount (A) with a M5 x 10 mm socket pin screw (C) using security allen wrench (B)
as shown in detail 1.
Note: Slotted set screw (K) is used to jam against the threads of the ball and socket mount to prevent any excess
movement of the ball and socket mount (A). Do not overtighten screw; overtightening screw will damage threads
making it difficult to separate the products.
Skip to step 3.
K
NOTCH
C
WOOD
A
G
CEILING
G
DETAIL 1
A
5 of 8
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation to
G
K
G
C
Extension Column
Screw extension column to ceiling plate (G).
Align the notch with one of the four holes in
the ceiling plate (G) and secure extension
column with a M5 x 10 mm socket pin
screw (C) using security allen wrench (B).
See detail 4.
EXTENSIONCOLUMN
(UL Listed EXT or ADJ
Series)
EXTENSION
COLUMN
Screw extension column connector (I) to
extension column. Align slot in extension
column with one of the top holes in
extension column connector (I). Insert and
tighten one #10-32 x 3/8" socket pin screw
(J) through extension column connector (I)
into slot on extension column using security
allen wrench (B). See detail 5.
Sold Separately
SLOT
DETAIL 4
EXTENSION
COLUMN
Screw ball and socket mount (A) to
extension column connector (I). Align slot in
ball and socket mount (A) to one of the
bottom holes in extension column connector
(I). Insert and tighten one #10-32 x 3/8"
socket pin screw (J) through extension
column connector into slot in ball and
socket mount (A) using security allen
wrench (B). See detail 6.
SLOT
K
I
I
SLOT
J
Note: Slotted set screws (K) are used to
jam against the threads of each connecting
joint to prevent any excess movement. Do
notovertightenscrews;overtightening
screws will damage threads making it
difficult to separate the products.
A
DETAIL 5
EXTENSION
COLUMN
SLOT
I
K
A
J
DETAIL 6
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
6 of 8
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
Find your projector from the models listed below
*Notch indicates front of projector.
Flip projector upside down and remove feet from bottom of projector. Fasten two M3 x 25 mm socket pin
screws (N) and two .198 x .750 retaining spacers (P) into the threaded inserts as indicated below. Fasten one
M3 x 16 mm socket pin screw (M) and one .156 x .375 retaining spacer (O) into the threaded insert as indi-
cated below. Finish tightening screws (N, M) using 2 mm security allen wrench (Q).
N
M
L
P
O
A. NEC NP40/41/50/60/61/62
*Notch indicates front of projector.
3-1
Flip projector upside down and fasten three M3 x 25 mm socket pin screws (N) and three .198 x .313 x .688
retaining spacers (R) into the threaded inserts as indicated below. Finish tightening M3 x 25 mm socket pin
screws (N) using 2 mm security allen wrench (Q).
N
L
R
B. NEC NP100/200
7 of 8
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
For customer care call 1-800-729-0307 or 708-865-8870.
Download from Www.Somanuals.com. All Manuals Search And Download.
Note: The projector adapter plate and projector you are installing may differ in appearance from the sample
illustrated below.
Attach projector, with adapter plate already on it, to the
ball and socket mount (A) by inserting the ball and
socket mount (A) into the adapter plate connection and
twisting until the adapter plate will no longer turn
(about 75°). The spring loaded captive screw should
line up with a corresponding hole on the adapter plate
(this should line up automatically when the two are
connected). Push down and tighten the spring loaded
captive screw to secure the adapter plate to the mount.
If not using the optional security feature, fasten thumb
screw (D) in the hole opposite the spring loaded
captive screw.
To adjust roll, pitch, and yaw loosen the set screw
(shown below) using security allen wrench (B) or
standard 4 mm allen wrench. You should be able to
just slightly loosen the screw so that your adjustments
can be set without having to hold the projector. Move
projector to desired position and slowly tighten set
screw.
Note: Be sure not to touch the projector while
tightening the set screw. This may cause the image
to be unaligned when you let go.
5
IMPORTANT: Allen wrench is your key for projector
removal. Store it in a safe place.
OPTIONAL: For Armor Lock™ security, insert serrated
washer head socket pin security screw (E) in the hole
opposite the spring loaded captive screw. Tighten with
security allen wrench (B). This will prevent the
projector from being removed.
WOOD
JOIST
Note: Be sure to only use the #10-32 x 3/8" screw (E)
(or the thumb screw (D)) opposite the spring loaded
captive screw.
CEILING
CEILING
SETSCREW
E
D
WOOD
JOIST
CAPTIVE
SCREW
PROJECTOR
A
CUTAWAY VIEW OF
CEILING PLATE (G)
2
Peerless offers several Projector Mounts to fit various
projectors. New Projector Mounts are continually being
developed to meet the demands of a growing projector
market. To find out if a mount is available for your particular
projector, call Peerless customer service at 1-800-729-
0307 or 1-708-865-8870.
PROJECTORADAPTER PLATE
(UL Listed PAP Series)
Sold Separately
1
PROJECTOR
WARNING
• Do not lift more weight than you can handle! Use
additional man power or mechanical lifting equipment
to safely handle placement of the projector!
ISSUED: 11-01-06 SHEET #: 055-9478-6 01-14-09
8 of 8
For customer care call 1-800-729-0307 or 708-865-8870.
©2008, PeerlessIndustries, Inc. Allrightsreserved.
Allotherbrandandproductnamesaretrademarksorregisteredtrademarksoftheirrespectiveowners.
Download from Www.Somanuals.com. All Manuals Search And Download.
|