READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE
This fixture is intended for installation in accordance with the National Electrical Code and local regulations.
To assure full compliance with local codes and regulations, check with your local electrical inspector before
installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
IINSSTRU:C8TIO2N S9HEE2T NCO. Y
A0400
Page 1 of 2
™
INSTRUCTIONS FOR THE INSTALLATION AND OPERATION OF PowerArc CANOPY FIXTURE
INSTRUCTIONS FOR ATTACHING PowerArc CANOPY FIXTURE TO
WALL OR CEILING MOUNTED JUNCTION BOX (see FIG’s 1 & 2):
FIXTURE GROUND LEAD
J-BOX
CROSS-BAR
J-BOX SCREWS
1. Turn off power at fuse box before installation.
2. Using the appropriate slots in CROSS-BAR, secure the CROSS-BAR
ASSEMBLY to the J-BOX with the J-BOX SCREWS.
CROSS-BAR
ASSEMBLY
NOTE: To lock HORIZONTAL ROTATION, install the ROTATION SCREW
into the desired position hole in the CROSS-BAR and tighten (see Fig 2).
These holes are located every 45˚. This step is necessary only if hori-
zontal locking is desired. Otherwise, rotation screw can be removed.
3. Rotate the HEAD of fixture 90˚ for easier access to the J-BOX.
4. Feed both FIXTURE LEADS through the EYELET in the center of the
CROSS-BAR ASSEMBLY and back out of the J-BOX.
5. Move the FIXTURE MOUNTING BRACKET in direction “A”, lining up
the 2 top slots on the bracket with the 2 top FIXTURE MOUNTING
SCREWS. Once the 2 top slots are inserted, slide the fixture in
direction “B” until all 4 slots on the FIXTURE MOUNTING BRACKET
engage into all 4 FIXTURE MOUNTING SCREWS. Tighten all 4
FIXTURE MOUNTING SCREWS.
FIXTURE
MOUNTING
SCREWS (4)
FIG. 1
MOUNTING
SURFACE
CANOPY
FIXTURE
MOUNTING
BRACKET
FIXTURE
MOUNTING
SCREWS (4)
HEAD
A
B
ROTATION
SCREW
6. Make wiring connections using WIRE NUTS (local hardware item):
• When installing 120V fixture (8292WECY), black FIXTURE LEAD to
hot (black) SUPPLY LEAD, white FIXTURE LEAD to neutral (white)
SUPPLY LEAD, and FIXTURE GROUND LEAD to SUPPLY
ground.
EYELET
TOP SLOTS
SUPPLY LEADS
FIG. 2
WIRE NUTS GROUND
WIRE
FIXTURE LEADS
• When installing 277V fixture (8292WECY2),red FIXTURE LEAD to
hot SUPPLY LEAD, white FIXTURE LEAD to neutral (white)
SUPPLY LEAD, and FIXTURE GROUND LEAD to SUPPLY ground .
Once connections have been made, push wires and connections
into the J-BOX.
90˚ VERTICAL
HEAD ROTATION
HEAD
7. Push CANOPY against MOUNTING SURFACE to cover J-BOX.
AIMING ADJUSTMENTS (see Fig 3):
CAUTION: ALLOW TIME FOR FIXTURE TO COOL
BEFORE MAKING ANY ADJUSTMENTS!
VERTICAL AIMING
ANGLE INDICATOR
Fixture has both a VERTICAL and a HORIZONTAL ROTATION. It is
equipped with stops for both rotations (DO NOT FORCE FIXTURE PAST
STOPS. DOING SO MAY CAUSE ELECTRICAL HAZARD).
For Precise AIMING, rotate Head of fixture and line up desired angle
on the AIMING INDICATOR with the INDICATOR TAB.
350˚ HORIZONTAL
ROTATION
INDICATOR TAB
CAUTION: IN ACCORDANCE WITH LAMP MANUFACTURES INSTRUC-
TIONS, DO NOT INSTALL PowerArc ON WALL IN A MANNER THAT
WOULD POSITION THE LAMP MORE THAN 45˚ AWAY FROM THE
HORIZONTAL PLANE (SEE FIG.4).
FIG. 3
INSTRUCTIONS FOR UNLOCKING THE HORIZONTAL ROTATION, ONCE THE
PowerArc CANOPY FIXTURE IS FULLY INSTALLED (see FIG’s 1, 2 & 3):
1. Turn off power at fuse box before making adjustments.
2. Rotate the HEAD of fixture 90° for easier access to the J-BOX.
3. Reverse steps 7 and 5 from the fixture mounting instructions above.
4. Uninstall the ROTATION SCREW from the CROSS-BAR ASSEMBLY.
5. Repeat steps 5 and 7 from the fixture mounting instructions above.
FIG. 4
®
LIGHTOLIER a GENLYTE company.
631 Airport Road, Fall River, MA 02720
Download from Www.Somanuals.com. All Manuals Search And Download.
|