Bunn Axiom 391300000J User Manual

INSTALLATION & OPERATING GUIDE  
BUNN-O-MATIC CORPORATION  
POST OFFICE BOX 3227  
SPRINGFIELD, ILLINOIS 62708-3227  
PHONE: (217) 529-6601 FAX: (217) 529-6644  
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts  
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at  
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.  
39130.0000J+ 04/12 ©2008 Bunn-O-Matic Corporation  
INTRODUCTION  
This equipment will brew a 12 gallon batch of coffee into an awaiting server.The brewer may have  
a hot water faucet for allied beverage use. It is only for indoor use on a sturdy counter or shelf.  
CONTENTS  
Warranty................................................................................................ 2  
User Notices ......................................................................................... 3  
Electrical Requirements........................................................................ 4  
Plumbing Requirements & Initial Set-Up............................................... 6  
Operating Controls & Coffee Brewing................................................... 7  
Cleaning & Tank Drain .......................................................................... 8  
Adjustments & Optional Settings .......................................................... 9  
USER NOTICES  
Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should  
be kept in good condition. Replace any unreadable or damaged labels.  
Optional Field Wiring  
#12364.0000  
120/208-240 V, 15.6-17.5 A, 2980-3850 W  
1PH, 3-Wire + GND, 60HZ  
Authorized service personnel only.  
Disconnect power before servicing.  
To reduce the risk of electric shock,  
do not remove or open cover.  
No user-serviceable parts inside.  
PN: 00658.0000G 02/08  
©
1985 BUNN-O-MATIC CORPORATION  
#29710.0007  
#00658.0000  
#37881.0002  
WARNING  
• DO NOT OVERLOAD CIRCUIT.  
• ALWAYS ELECTRICALLY GROUND  
THE CHASSIS.  
As directed in the International Plumbing Code of the  
International Code Council and the Food Code  
Manual of the Food and Drug Administration (FDA),  
this equipment must be installed with adequate  
backflow prevention to comply with federal, state  
and local codes. For models installed outside the  
U.S.A., you must comply with the applicable Plumb-  
ing /Sanitation Code for your area.  
• DO NOT DEFORM PLUG OR CORD.  
• FOLLOW NATIONAL AND LOCAL  
ELECTRICAL CODES.  
#03408.0002  
#03409.0002  
• KEEP COMBUSTIBLES AWAY.  
FAILURE TO COMPLY RISKS EQUIPMENT  
DAMAGE, FIRE OR SHOCK HAZARD.  
READ THE ENTIRE  
OPERATING MANUAL BEFORE  
USING THIS PRODUCT  
00986.0000F 10/07 ©1994 Bunn-O-Matic Corporation  
#00656.0001  
#00986.0000  
#00824.0002  
To reduce the risk of electric shock,  
do not remove or open cover.  
No user-serviceable parts inside.  
Authorized service personnel only.  
Disconnect power before servicing.  
WARMERS AND SURFACES ARE HOT  
CAUTION  
#37881.0000  
#02765.0000  
#00824.0001  
39130 052411  
Page 3  
ELECTRICAL REQUIREMENTS  
WARNING -  
The brewer must be disconnected from the power source until specified in Initial Set-Up.  
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.  
ELECTRICAL HOOK-UP (All Models)  
CAUTION Improper electrical installation will damage electronic components.  
1. An electrician must provide electrical service.  
2. Determine the available on-site electrical service.  
3. Select the desired unit voltage based on the available on-site electrical service.  
4. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.  
5. Remove the front access panel beneath the sprayhead to gain access to the terminal block.  
6. Feed the supply leads through the rear of the brewer.  
7. Using the above diagrams, connect the desired electrical service to the field wiring terminal block.  
8. If wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the Power  
Supply Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4 Con-  
ductor, Rated 90° C. Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Configuration,  
Rated 125/250V, 20 AMPS. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long  
(measured from Strain Relief to end of the Attachment Plug Cap).  
9. Before proceeding, verify the voltage at the field wiring terminal block.  
10. Set voltage switch to the appropriate position and replace the access panel. (DV Models Only)  
11. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If  
plumbing has been hooked up, the brewer is ready for Initial Set-Up.  
CE REQUIREMENTS  
• This appliance must be installed in locations where it can be overseen by trained personnel.  
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.  
• Appliance shall not be tilted more than 10° for safe operation.  
• An electrician must provide electrical service as specified in conformance with all local and national codes.  
• This appliance must not be cleaned by water jet.  
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental  
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of  
this appliance by a person responsible for its safety.  
• Children should be supervised to ensure they do not play with the appliance.  
• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with  
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.  
• Machine must not be immersed for cleaning.  
Twins  
All Twins are 120/208 & 120/240V AC  
Single phase unless otherwise noted.  
Note: Power cord must be  
connected to center terminal  
block on all Twins unless  
otherwise noted.  
Note: This electrical service requires  
3 current carrying conductors (Neutral,  
L1 and L2) and a separate conductor for  
earth ground.  
39130 120809  
Page 4  
ELECTRICAL REQUIREMENTS  
Single & Dual Volt Models  
Requirements for brewers with an attached cord set are as follows:  
Dual Voltage Switch  
in 120V position  
Note: This electrical service re-  
quires 2 current carrying conduc-  
tors(Neutral,andL1)andaseparate  
conductor for earth ground.  
120V  
120/208-240V  
For Supply Connections, Use No. 12 AWG  
Wires Suitable For At Least 90oC (194oF)  
FOR USE ONLY ON AN  
INDIVIDUAL BRANCH  
CIRCUIT RATED 20 AMPS  
NEUTRAL WHITE  
WHITE  
POWER CORD  
N
NEUTRAL  
L1 BLACK  
L1  
L1 BLACK  
GREEN  
G
120V 2 WIRE + GROUND  
120V AC  
Single phase models  
Requirements for brewers without an attached cord set are as follows:  
Dual Voltage Switch in  
120/208-240V position  
Note: This electrical service  
requires 3 current carrying  
conductors (Neutral, L1 and  
L2) and a separate conductor  
for earth ground.  
120V  
120/208-240V  
For Supply Connections, Use No. 12 AWG  
Wires Suitable For At Least 90oC (194oF)  
FOR USE ONLY ON AN  
INDIVIDUAL BRANCH  
CIRCUIT RATED 20 AMPS  
L2 RED  
WHITE  
L2 RED  
POWER CORD  
L2  
NEUTRAL WHITE  
N
NEUTRAL  
L1 BLACK  
L1 BLACK  
L1  
GREEN  
G
120/208-240V 3 WIRE + GROUND  
120/208 & 120/240V AC  
Single phase models  
A & B Models  
L2 RED  
WHITE  
L2 RED  
POWER CORD  
L2  
L2 RED  
L2 RED  
L2 RED  
NEUTRAL BLUE  
POWER CORD  
POWER CORD  
L2  
L1  
N
NEUTRAL WHITE  
N
L1 BLACK  
L1 BLACK  
NEUTRAL  
L1 BLACK  
L1  
L1 BLACK  
L1 BROWN  
L1 BLACK  
L1  
GREEN/YELLOW  
GREEN  
GREEN  
G
G
G
240V 2 WIRE + GROUND  
230V 2 WIRE + GROUND  
120/208-240V 3 WIRE + GROUND  
39130 060111  
Page 5  
PLUMBING REQUIREMENTS  
These brewers must be connected to a cold water system with operating pressure between 20  
and 90 psi (138 and 620 kPa) from a 12" or larger supply line. A shut-off valve should be installed in  
the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620  
kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14" flare.  
1
NOTE - Bunn-O-Matic recommends 4" copper tubing for installations of less than 25 feet and 38  
"
for more than 25 feet from the 12" water supply line. A tight coil of copper tubing in the water line will  
facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of  
a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this  
type of device may restrict water flow.  
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual  
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre-  
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must  
comply with the applicable Plumbing /Sanitation Code for your area.  
1. Flush the water line and securely attach it to the inlet fitting at the rear of the brewer.  
2. Turn on the water supply.  
INITIAL SET-UP  
1. Insert an empty funnel into the funnel rails.  
If setting up new brewer in high mineral  
2. Place an empty server under the funnel.  
3. Connect the brewer to the power source.  
4. Turn on the main ON/OFF switch located on the  
left side of brewer (If equipped).  
locations, refer to programming (Enable  
Brew Logic). Pertains to units with  
software version 1.06 & up.  
5. Waterwillowintothetankandstopwhenthetank  
is filled to its capacity.Display will show "PLEASE  
WAIT...TANK FILLING" until tank is filled with  
water.  
Brew water temperature is factory set at 200o F (93.3o C)  
Areas of high altitude will require lowering this tempera-  
ture to prevent boiling. This chart should be used as a  
guide when readjusting the brew water temperature.  
6. Wait approximately twenty minutes for the water  
in the tank to heat to the proper temperature.  
Display will show "READY TO BREW...WATER  
TEMP: 200°" when tank is at operating tempera-  
ture. Some water will drip from the funnel during  
this time; this is due to expansion and should not  
occur thereafter.  
7. Place a small container beneath the faucet and  
open the faucet handle.Release it when you hear  
the tank refilling.  
8. Watervolumesandowsettingshavebeenpreset  
at the factory. Refer to adjustments for the Set  
Brew Volumes section of this manual should the  
volume need to be increased or decreased.  
9. The brewer is now ready for use in accordance  
with the instructions for Coffee Brewing.  
10. Repeat steps 5-9 for remaining side on Twins.  
Boiling point  
of water  
Recommended  
water temperature  
Altitude  
o F  
o C  
o F  
o C  
(Feet)  
-1000  
-500  
0
213.8  
212.9  
212.0  
211.1  
210.2  
209.3  
208.4  
207.4  
206.5  
205.6  
204.7  
203.8  
202.9  
201.9  
201.0  
200.1  
199.2  
198.3  
197.4  
196.5  
195.5  
194.6  
193.7  
101.0  
100.5  
100.0  
99.5  
99.0  
98.5  
98.0  
97.4  
96.9  
96.4  
95.9  
95.4  
94.9  
94.4  
93.9  
93.4  
92.9  
92.4  
91.9  
91.4  
90.8  
90.3  
89.8  
200  
200  
200  
200  
200  
200  
200  
200  
199  
198  
197  
196  
195  
195  
194  
193  
192  
191  
190  
189  
188  
187  
186  
93.3  
93.3  
93.3  
93.3  
93.3  
93.3  
93.3  
93.3  
92.8  
92.2  
91.7  
91.1  
90.6  
90.6  
90.0  
89.4  
88.9  
88.3  
87.8  
87.2  
86.7  
86.1  
85.6  
500  
1000  
1500  
2000  
2500  
3000  
3500  
4000  
4500  
5000  
5500  
6000  
6500  
7000  
7500  
8000  
8500  
9000  
9500  
10000  
39130 020608  
Page 6  
OPERATING CONTROLS  
(A) ENABLE BREW ON/OFF SWITCH  
Pressing the "ENABLE BREW ON/OFF" switch (indicator  
on) supplies power to the brew station warmer and enables  
the brew circuit. Pressing the switch again (indicator off)  
stops brewing and de-energizes the brew station warmer.  
Stopping a brew cycle after it has been started will not stop  
the flow of water into the server until the funnel is empty.  
P3633  
(B) BREW SWITCH  
Momentarily pressing and releasing the switch starts a  
brew cycle when the "ENABLE BREW ON/OFF" indicator  
is on.  
B
C
A
D
(C) ADDITIONALWARMER or HALF/FULL BATCH SWITCHES  
Pressinganyadditionalwarmerswitchsothattheindica-  
tor is on, supplies power to the associated warmer.  
NOTE 1: APS & TC models have no warmers.  
NOTE 2:These switches are Half/Full Batch on "Single  
Axiom" models.  
(D) MAIN ON/OFF SWITCH  
This switch, located on the left side of the brewer, turns  
power on and off to all components in the brewer.  
P3969.50  
COFFEE BREWING  
1. Begin each brew cycle with a clean empty brew  
funnel.  
2. Insert a BUNN filter into the funnel.  
3. Pour (or grind) fresh coffee into the filter and level  
the bed of grounds by gently shaking.  
4. Slide the funnel into the funnel rails until it stops.  
5. Place an empty server under the funnel.  
6. Verify that the "ENABLE BREW ON/OFF" indicator  
is on.  
7. Momentarilypressandreleasethe"BREW"switch.  
The display will read "NOW BREWING", and show  
the time remaining in the brew cycle.  
8. Following the brew, the display reads "DRIPPING"  
which shows the time remaining until the coffee no  
longer drips from the funnel tip.  
9. After the coffee finishes dripping from the funnel  
tip, carefully remove the brew funnel and discard  
the grounds and filter.  
NOTE: Some models are equipped with a backup  
pour in feature, in case the plumbed water supply is  
disrupted. In this event, disregard steps 7-8, and pour  
in 64 ounces of fresh water.  
39130 092110  
Page 7  
CLEANING  
1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for  
cleaning all surfaces on Bunn-O-Matic equipment.  
2. Check and clean the sprayhead. The sprayhead holes must always remain open. Insert the short  
end of the sprayhead cleaning tool into each of the five water outlets of the plastic sprayhead to  
remove any mineral deposits (Refer to Fig 1)  
3. Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times  
to remove any mineral deposits from the fitting (Refer to Fig 2).  
NOTE: In hard water areas, this may need to be done daily. It will help prevent liming problems in  
the brewer and takes less than a minute.  
NOTE: In the event that the "Brew Logic" circuit activates (compensating for high lime build up), it  
will temporarily disable the "Recovery Booster" and "Pulse Brewing" systems until the unit has been  
de-limed. Refer to the Troubleshooting section for more details.  
FIGURE 1  
FIGURE 2  
TANK DRAIN  
1. Loosen screws that secure the front access panel. Remove the panel.  
2. Unfasten the hose clamp at the end of the drain hose. Remove the plug.  
3. Place the end of the drain hose in a container that has a minimum capacity of 200 oz (5.9 L).  
4. Release the white clamp to drain water from the tank.  
5. When tank is empty, close the white clamp, replace the plug, and tighten the clamp at the end  
of the drain hose. (Repeat steps 2-5 for remaining side on Twins)  
6. Replace the front panel and tighten screws.  
39130 060206  
Page 8  
ADJUSTMENTS & OPTIONAL SETTINGS  
1
2
3
%811  
READY TO BREW  
WATER TEMP: 200°  
5($5  
)5217  
:$50(5  
:$50(56  
P3633-2  
4
Using the menu-driven display on the front of the brewer, the operator has the ability to alter or  
modify various brewing parameters such as brew lockout, brew volume, brew strength, etc. This  
allows for the precise brewing of various flavors of coffee.  
Programming of the brewer is achieved by entering a certain function.Then, by the use of hidden  
programming switches, the operator can customize the brewing process to their specifications.  
PROGRAMMING SWITCHES  
1. FUNCTION SCREEN  
This is the display which shows the various functions.  
2. (Right of the display)  
This is used to access the program mode and is also used to step forward through the menu.  
3. (Left of the display)  
This is used to step backwards through the function list.  
4. "Digital" (lower left under the display)  
This is used to select options that appear on the display during programming (NO/-)  
"Brewer" (center under the display)  
This is used to select options that appear on the display during programming (DONE)  
"Control" (lower right under the display)  
This is used to select options that appear on the display during programming (YES/+)  
39130 060111  
Page 9  
ADJUSTMENTS & OPTIONAL SETTINGS (CONT.)  
PROGRAMMING FUNCTIONS - FLOW CHART  
BrewWIZARD  
BREW LOCKOUT ?  
BREW OZ: 64.0  
BREW METER  
1
+
NO  
DONE  
YES  
(-)  
DONE  
(+)  
-
ENABLE ADS ?  
ENTER SERVICE #?  
EXITING  
NO  
DONE  
YES  
NO  
YES  
BrewWIZARD  
LEVEL 2  
ENTER PASSWORD  
SET PASSWORD  
SET LANGUAGE ?  
NO YES  
0
0
0
0
0
0
UNITS  
SET TEMP:  
200°  
(+)  
SET READY: 195°  
METRIC DONE ENG  
(-)  
DONE  
(-)  
DONE  
(+)  
(CONT.)  
39130 020608  
Page 10  
ADJUSTMENTS & OPTIONAL SETTINGS (CONT.)  
LEVEL 2 (CONT.)  
ENTER ASSET # ?  
NO YES  
SET PULSE BREW ?  
NO YES  
DRIP TIME 0:30  
(-)  
DONE  
(+)  
Enabl EnergySavr  
NO DONE YES  
EnableFreshTimer  
ENABLE CLEAN  
NO DONE YES  
NO  
DONE YES  
(Ver. 1.07 & above)  
ENABL WARMER OFF  
NO DONE YES  
0
REFILL 155  
DONE (+)  
ENABLE BrewLOGIC  
(-)  
NO  
DONE  
YES  
(These two screens will change if "BrewLogic" is enabled)  
SPRAY OZ/M: 25.0  
(-) DONE (+)  
CALIBRATE FLOW ?  
BREW COUNTERS ?  
NO  
YES  
NO  
YES  
Return To Main Screen  
SERVICE TOOLS ?  
NO YES  
FACTORY DEFAULTS  
AXIOM  
NO  
YES  
VERSION xx.xx  
Displays Model &  
Software Version  
39130 053107  
Page 11  

Nokia 3510i User Manual
Maxtor Basics STM302503EHM301 RK User Manual
Lenovo ThinkPad 43N3224 User Manual
GPX C209B User Manual
Asus EEE PAD PC TF101 User Manual
Apple 2A034 4760 A User Manual
Antec Quiet Computing VSK 2000 User Manual
Alpine CDA 7998 User Manual
AKG Acoustics PERCEPTION 120 User Manual
Addonics Technologies AD25MSD User Manual