Master Bilt Refrigerator CMICL 156 User Manual

Installation & Operations Manual  
Master-Bilt Products  
908 Highway 15 North  
New Albany, MS 38652  
Phone: (800) 684-8988  
PN 090-90000  
Rev 05/20/03 LocN.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
TABLE OF CONTENTS  
Page Numbers  
INTRODUCTION………………………………….……………………………………………………………4  
STORE CONDITIONS..……………….………...……...……………………………….………………….…4  
WARNING LABELS AND SAFETY INSTRUCTIONS…………………………………………………….5  
PRE-INSTALLATION INSTRUCTIONS………………………..….………………………………………..6  
Inspection for Shipping Damage…………………………………………………………….………6  
INSTALLATION INSTRUCTIONS……………………………………………………………………………6  
General Instructions………………………………………………………………………………….6  
Notice to store owners/ managers………………………………………………………………….6  
Electrical...………………………………………………………………………………………….… 7  
Panel Storage…………………………………………………………………………………………7  
Cam Fasteners………………………..…..………………………………………………………….8  
Level Floor…………………………………………………………………………………………….9  
Caulking……………………………………………………………………………………………….9  
Floor Assembly……………………………………………………………………………………...10  
Celing and Wall Penal Assembly………………………………………………………………….10  
Door and Frame installation……………………………………………………………………….10  
Refrigeration…………………………………………………………………………………………11  
Adjusting Door and Replacing Hinges……………………………………………………………11  
Door Frame Heater Replacement…………………………………………………………………12  
Temperature Controls………………………………………………………………………………12  
FINAL CHECK LIST…………………………………………………………………………………….……13  
SERVICE INSTRUCTIONS…………………………………………………………………………….……13  
MASTER-BILT PART NUMBERS………………………………………………………………………….14  
SALE AND DISPOSAL………………………………………………..…………………………………….14  
WIRING DIAGRAMS………………………………… ………………………………………………....15-20  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
INTRODUCTION  
Thank you for purchasing a Master-Bilt cabinet. This manual contains important instructions for installing,  
using and servicing a Master-Bilt CM/CL-156 case. A parts list is included in with this manual. Read all these  
documents carefully before installing or servicing your equipment.  
STORE CONDITIONS  
The Master-Bilt CM/CL-156 cases are designed to operate in the controlled environment of an air-conditioned  
store. The store temperature should be at or below 75°F and a relative humidity of 55% or less. At higher  
temperature or humidity conditions, the performance of these cases may be affected and the capacity  
diminished. It is not uncommon in a newly constructed store for the temperature and humidity to be above  
design conditions. These excessive conditions may produce sweating in the case until the store is operational  
and the ambient environment is more desirable.  
The Master-Bilt CM/CL-156 should not be positioned where it is directly exposed to rays of sun or near a direct  
source of radiant heat or airflow. This will adversely affect the case and will result in poor performance.  
NOTICE  
Read this manual before installing your cabinet. Keep the manual and refer to it before doing any  
service on the equipment. Failure to do so could result in personal injury or damage to the cabinet.  
DANGER  
Improper or faulty hook-up of electrical components of the refrigeration units can result in severe  
injury or death.  
All electrical wiring hook-ups must be done in accordance with all applicable local, regional or national  
standards.  
NOTICE  
A refrigeration mechanic and/or a licensed electrician must perform installation and service of the  
refrigeration and electrical components of the cabinet.  
The portions of this manual covering refrigeration and electrical components contain technical instructions  
intended only for persons qualified to perform refrigeration and electrical work.  
This manual cannot cover every installation, use or service situation. If you need additional information, call or  
write us:  
Customer Service Department  
Master-Bilt Products  
Highway 15 North  
New Albany, MS 38652  
Phone (800) 684-8988  
Fax (800) 684-8988  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
WARNING LABELS AND SAFETY INSTRUCTIONS  
This symbol is the safety-alert symbol. When you see this symbol on your cabinet  
or in this manual be alert to the potential for personal injury or damage to your  
equipment.  
Be sure you understand all safety messages and always follow recommended precautions and safe  
operating practices.  
NOTICE TO EMPLOYERS  
You must make sure that everyone, who installs, uses or services your cabinet is thoroughly familiar  
with all safety information and procedures.  
Important safety information is presented in this section and throughout this section and throughout the  
manual. The following signal words are used in the warnings and safety messages:  
DANGER: Severe injury or death will occur if you ignore the message.  
WARNING: Severe injury or death can occur if you ignore the message.  
CAUTION: Minor injury or damage to your cabinet can occur if you ignore the message.  
NOTICE:  
This is important installation, operation or service information. If you ignore the  
message, you may damage your cabinet.  
The warning and safety labels shown throughout this manual are placed on your Master-Bilt Products  
cabinet at the factory. Follow all warning label instructions. If any warning or safety labels become  
lost or damaged, call your customer service department at (800) 684-8988 for replacements.  
CAUTION!  
GROUND REQUIRED  
FOR SAFE OPERATION  
This label is located on top of the electrical control  
This label is attached to the cabinet power cord  
label and on the wiring channel.  
on models with a power cord  
.
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
PRE-INSTALLATION INSTRUCTIONS  
INSPECTION FOR SHIPPING DAMAGE  
You are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for  
damage as soon as they arrive. If damage is noted to shipping crates or cartons or if a shortage is found, note  
this on the bill of lading (all copies) prior to signing.  
If damage is discovered when the cabinet is uncrated, immediately call the delivering truck line and follow up  
the call with a written report indicating concealed damage to your shipment. Ask for an immediate inspection  
of your concealed damage item. Crating material must be retained to show the inspector from the truck line.  
INSTALLATION INSTRUCTIONS  
It is the responsibility of the erector to install this walk-in using safe construction practice. The manufacturer is  
not responsible for the performance of this walk-in if it is not installed in accordance with the instructions  
detailed in this manual.  
GENERAL INSTRUCTIONS  
1. Be sure competent service people properly install the equipment.  
2. Keep the equipment clean and sanitary so it will meet your local sanitation codes.  
3. Rotate your stock so that older stock does not accumulate. A "First-In, First-Out" rotation practice will keep  
the products in good salable condition.  
4. Do not place product in the case when it is soft or partially thawed. Also, product should not be put in the  
case for at least 6 hours after it is started.  
5. Stock cases as quickly as possible, exposing only small quantities to store temperatures for short periods  
of time.  
6. When replacing burned out fluorescent tubes, be sure that the electrical power to the lighting circuit is  
turned off.  
NOTICE TO STORE OWNERS / MANAGERS  
Moisture or liquid around, under, or inside the cabinet is a potential slip/fall hazard for persons  
walking by or working in the general area of the cabinet. Any cabinet malfunction or housekeeping  
problem that creates a slip/fall hazard around or under the cabinet should be corrected immediately.  
If moisture or liquid is observed around, under, or inside a Master-Bilt cabinet, an immediate investigation  
should be made by qualified personnel to determine the source of the moisture or liquid. The investigation  
should determine if the cabinet is malfunctioning or if there is a drainpipe leaking.  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
ELECTRICAL  
WARNING  
Before servicing electrical components in the case or the doors or doorframes make sure all power to  
case is off. Always use a qualified technician.  
PANEL STORAGE  
To comply with Sanitation requirements this cabinet must be mounted on casters, legs (6” high min.) or the  
base must be sealed to the floor. The casters provided with this case screw into the holes from which the  
shipping bolts were removed.  
Forks must be 4  
ft.in length to  
adequately support  
panels  
Figure # 1  
When panels must be stored at the job site prior to erection is very important that they be property stacked  
and covered. In doing this panels will be protected against staining from moisture and sunlight and damage  
by workmen and traffic.  
3/4" X 3/4"  
wood spacer  
2 X 4 wood  
frame  
Groove edge of panel down  
Figure # 2  
Whenever possible panels should be stored indoors panels stored indoors may be stored in their original  
factory crates. If it is necessary to store panel’s outdoors, they should be stacked vertically on skids, with  
spacers between the panels. This protects the panel edges and provides proper ventilation. This method of  
stacking permits drain-off of condensation moisture, which comes from temperature changes and guards  
against the resultant formation of white rust stains or oxidation. (See Figure #2). Panels should be covered  
with a waterproof covering to protect them from the elements of weather. Master-Bilt recommends black  
polyethylene sheeting, which keeps sunlight out and eliminates the “greenhouse” condition, which occurs  
when clear plastic is used. In heavy traffic areas, it is advisable to place protective rails around stacks of  
panels to guard them from any possible damage.  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
CAM FASTENERS  
NOTE: When facing the interior of the wall panel, all vertical latch access holes should be on the left  
side of the panels.  
Before attempting to erect the walk-in, you should know how Master-Bilt cam-lock on some panels, it may be  
difficult to position the hex wrench as showing Figure #3, #4, and #5. However, the locking procedure for all  
cam-locks will be as shown.  
Cam  
Wrench  
Hook in Open  
Position  
Figure #3  
NOTE: All cam-lock locking arms must be in the “open” position before attempting to lack panels  
together.  
Push panels together and turn cam-wretch ¼” turn clockwise. This will engage locking arm over locking pin.  
Continue to turn cam-wretch for ½” turn or until panels are fastened together securely.  
Figure # 4  
CAUTION: Do not over-tighten cam fasteners. When the cam fastener tool stops, due to normal  
tightening, the fastener has done as much as it can. The panel will be tight and secure to the adjoining  
panel.  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
Figure #5  
If locking arm fails to hook locking pin, turn cam-lock counter-clockwise one completes turn and repeat the  
procedure like Figure #3  
LEVEL FLOOR  
It is very important that the existing floor be level If it is not level the insulated floor panels must be leveled by  
shimming between the existing floor and the floor panels. Assembling a walk-in of any type on an uneven or  
unleveled floor without some sort of shimming of grouting is not practical, not advisable and will never result in  
a satisfactory installation.  
Leveling of floor type walk-in floor panels should be accomplished by the use of a sand leveling bed or the use  
of shim stock. Shim stock can be rot resistant wood, strips of galvanized sheet metal, etc. Shims under floor  
panels must be no further than 18” on center in both length and width so as to property support the floor  
panels when the walk-in is assembled and the product load is in place. Shimming just the outer edges of just  
the corners of the floor panels will result in broken panels and/or separation of the metal liners from the foam.  
CAULKING  
Caulking is recommended in all panel joints as shown in Figure #6, #7, and #8. Caulk should be of high-  
grade outdoor type odorless compound. Approximately one tube of caulk is repaired for every 60 square feet  
of panel surface.  
It should be noted that on walk-ins subject to external weather conditions, the caulking of roof joints does not  
seal the roof against water penetration. Therefore, a weather protective roof must be installed atop the  
insulated roof panels.  
Wall Panel  
Joining  
seam  
of  
Caulking  
Floor Panel  
Caulking  
like  
Caulking  
panels  
Roof  
panel  
wall  
panel  
Figure # 6  
Roof to Wall Caulking Detail  
Figure # 7  
Like Panel To Like Panels Caulking Details  
Figure # 8  
Floor to Wall Caulking Detail  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
FLOOR ASSEMBLY  
Lay out all floor panels in sequence as shown on assembly drawings and make sure they are level. Fasten  
these panels as evenly as possible to one another. Tighten the cam fasteners all the way so that the panels  
are aligned evenly and as snug one to the other as possible.  
CEILING AND WALL PANEL ASSEMBLY  
NOTE: When facing the interior of the wall panel, all vertical latch access holes should be on the left  
side of the panel.  
Lay out wall panels in accordance with the assembly drawings supplied with the walk-in. It is suggested to  
begin by assembling the front of the walk-in first. The front is normally considered that portion of the walk-in  
that has the walk-thru door in it. However, if the walk-in is to be installed inside an existing building or space  
with two or three of the walk-in walls restricted, assembly then may be accomplyshed easier by beginning at  
the rear (opposite the door wall). Assemble the wall panels of the front portion until you get to both corners  
and then start to assemble roof sections so as to secure that portion of the walls that are already in place. As  
wall panels are assemled, they should be completely aligned and cam fasteners completely tightened. If wall  
panels appear to have a stair-step effect on the top horizontal egde as thy are being assembled, the foor is not  
level. At this point, you must stop immediately and take corrective measures to poperty level floor panels. All  
walls and corners can be assembled prior to the installation of the ceiling. As ceiling panels are assembled,  
each one should be property aligned to the adjoining ceiling and wall panels and locked into position as tightly  
as possible.  
DOOR AND FRAME INSTALLATION  
NOTE: It is very important that the floor be level where that walk-in is to be installed. Shims may be  
installed under the floor, if necessary, to ensure that the entire walk-in is square and plumb.  
ROOF PANEL  
1/4" SPACE  
SHIMS  
FLOOR PANEL  
Figure #9  
1. Set wall and roof panels, except the roof panel above door frame and adjoining corner panel to the right  
side of the door frame (when facing the inside of the door), in accordance with the Walk-in Installation  
instructions and plan drawing supplied. (Make sure all are assembled square and plumb to ensure proper  
operation.)  
2. Set door and frame in place.  
3. Place a spirit level against the door frame leg (inside door opening) to ensure that it is correctly aligned  
vertically, and latch the door frame to the adjoining wall/corner panel.  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. Using the same procedure as above continue with the installation of the remaining corner panels.  
5. Place a carpenter’s level against the face of the door frame to ensure correct vertical alignment and latch  
the door frame to the roof panel while holding level in place.  
6. Adjust the bottom wiper gasket of the door to the point that it sweeps the finished floor when the door is in  
the fully closed position. (Note: do not adjust the wiper gasket so far downs that it prevents the door  
from closing property.)  
7. Before securing the panels to the floor, double check the door frame alignment by placing a carpenter’s  
level vertically against each door frame leg.  
8. Connect correctly fused 120Volts-service line to the J-box by the light fixture on the interior of the walk-in.  
REFRIGERATION  
NOTE: Wiring diagrams are located inside pre-wired electrical panel on the condensing unit.  
Be sure electrical service is the same as the electrical characteristics on the compressor data plate. Connect  
correctly fused service line to the service line J-box on the condensing unit.  
After routing condensate line with standard trap from drain pan of evaporator coil, seal around drain line with  
silicone or butyl caulking to prevent moist air entering box from outside.  
Start compressor and allow running at least 24 hours before committing product into the walk-in. This 24  
hours period should be a testing period to check temperature-holding range versus the temperature control  
setting. On low temperature units, check the defrost control system to see that all ice is removed from the coil  
during each defrost period. In addition all checks of door operation and all other component operation should  
be checked.  
ADJUSTING DOOR AND REPLACING HINGES  
NOTE: all Master-Bilt swing doors are provided with adjustable back-up plates in the door for hinge  
adjustment.  
1. Place shims under door ( See Figure #9)  
2. Loosen to adjust or remove to replace those screws that attach hinge blade to door. When adjusting door  
hinges do not screws fastening hinge to frame of door.’  
3. Shim under door as necessary to provide a ¼” space between top of door and the door frame to ensure  
square fit( See Figure #9)  
4. Tighten or reinstall screws attaching the hinge blade to the door.  
5. The following procedure should be followed if one or all hinges are replaced.  
6. After adjusting or replacing the hinges, remove shims and check the space at the top of the door  
periodically for proper alignment.  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
DOOR FRAME HEATER REPLACEMENT  
CAUTION: Disconnect main power supply to door of walk-in before beginning the following procedure  
to avoid electrical shock.  
1. Remove stainless steel raceway from around door opening. Possition raceways away from walk-in to  
allow them to warm to room temperature. This will aid in tape adhesion described below. For freezers,  
the door power cord must be removed from the light base located on the interior hinge side of the door  
frame.  
2. Disconnect the heater cable lead wires from the power supply inside the light switch J-box and discard  
heater cable.  
3. Feed new heater cable lead wires through the opening in the inner frame and secure grommet in the  
openning in the back of the ligth switch J-box. Do not connect heater to power supply at this time.  
4. Rout heater cable along inside corner of raceway and secure with foil tape. Fasten raceways to door  
frame as heater cable is secured in place.  
5. Route heater cable along inside bed of sill plate as shown. Note diffeence in routing of cooler and freezer  
heater through sill plate. Again, secure heater cable sith foil tape as if is routed. Special care should be  
taken not to “kink” heater cable, resulting in improper operation and shortened life of heater. After routing  
cable through sill plate, position and fasten threshold plate into place.  
6. Fasten heater cable lead wires to power supply in light switch J-box and connect main power supply to  
door frame.  
TEMPERATURE CONTROLS  
On the CM models, the Temperature Control is on the end penel of the blower housing. These controls have  
an “off” position ( at full counter-clockwise position) and should be turned clockwise for “colder”.  
On the CL models have an Temperture Control mounted on the front of the Blower housing. The left control is  
the Temperature Control and should be turned clockwise for colder. This control does not hae an “off “  
position. There is also another control mounted to the right of the Temperature Control. This control is the “  
Defrost Termination-Fan Delay Control “ and shuold be preset to the “ 11:00” position. Counter-clockwise  
rotation will lengthen defost time; clockwise rotation will decrease defrost time. Turning the knob varies the  
defrost termination temperature only and has no effect on the (non-adjustable) fan delay.  
INSTALLING AND OPERATING DIRECTIONS:  
Place start pins in outer (24 hours) dial at the time of day that wsitch countacts are to be reverse from shown  
when dail pins are opposite time pointer. CAUTION: (Leave at least 1 hole between each adjacent pin).  
To set back-up defrost termination: Push down and rotate pointer on inside (2 hours) dial until it is opposite  
desired time.  
To set time of the day: Grasp knob in the outer of the inner (2 hours) dial and rotate it in a counter-clockwise  
direction. This will revolve the outer dial. Line up the correct time of day on the outer dial with the time pointer.  
Do not try to set the time control by grasping the outer dial. Rotate the inner dial only.  
Fro Replacement: of this control contact Refrigerator manufacture. Master_Bilt (800) 684-8988  
12  
Download from Www.Somanuals.com. All Manuals Search And Download.  
FINAL CHECK LIST  
A. Check operating pressures.  
B. Check electrical requirements of unit to supply voltage.  
C. Set temperature control for desired temperature range  
D. Check system for proper defrosts settings and operation.  
1. Set three 30 minutes per 24 hours.  
E. Check condensing unit for vibrating or rubbing tubing. Dampen and clamp as required.  
F. All valves should be completely opened counter-clockwise.  
G. Check for the interior of the wall panel. All vertical latch access holes should be on the left side of the  
panes.  
H. Replace all service valve caps and latch unit covers.  
.
SERVICE INSTRUCTIONS (Trouble Shooting Guide)  
1.  
High head pressure and high back pressure  
A.  
B.  
Condenser coil clogged or restricted.  
Condenser fan motor defective.  
2.  
Low back pressure and low head pressure  
A.  
B.  
C.  
Restriction in system.  
Refrigerant undercharged.  
Leak in system.  
3.  
4.  
5.  
Pressures normal – Cabinet warm  
A.  
B.  
C.  
D.  
Coil blocked with frost or ice  
Refrigerant undercharged.  
Control set too warm.  
Air screen disturbance.  
Coil blocked with frost or ice  
A.  
B.  
C.  
D.  
Defective temperature control.  
E.  
F.  
G.  
I.  
P-trap in drain not installed.  
Doors aren’t sealing when closed.  
Evaporator fans motor defective.  
Low voltage.  
Time clock not operating properly.  
Improper time clock setting.  
Defrost heater not operating.  
Compressor starts and runs – but cycles on overload  
A.  
B.  
C.  
D.  
Low voltage.  
Dropped phase (3 phase).  
Overload protector defective.  
High head pressure (See #1).  
13  
Download from Www.Somanuals.com. All Manuals Search And Download.  
6.  
7.  
Compressor will not start – hums, but cycles on overload  
A.  
B.  
C.  
D.  
Low voltage.  
Relay defective.  
Overload defective.  
High head pressure (see 1).  
Special service situations  
If moisture or liquid is observed around or under a Master-Bilt cabinet, an immediate investigation  
should be made by qualified personnel to determine the source of moisture or liquid. The investigation  
made should determine if the cabinet is malfunctioning or if there is a simple housekeeping problem.  
Moisture or liquid around or under a cabinet is a potential slip/fall hazard for persons walking by or  
working in the general area of the cabinet.  
Any cabinet malfunction or housekeeping problem that creates a slip/fall hazard around or under a  
cabinet should be corrected immediately.  
MASTER-BILT PART NUMBERS  
The table below gives Master-Bilt part numbers. Use this chart when ordering replacement parts for your  
CM/CM cases.  
Description  
CM/CL-156  
R35E-070UU  
R35XZ070UU  
C12X-070UU  
W46X-070UU  
D28RX070UU  
F35E-07-UU  
F35S-070UU  
Qty  
1
1
4
3
1
1
1
SK#3 & 3A  
SK # 1  
SK # 1  
28X63-RH-NSF-1092-DGT-SK#2-2P-  
TOTALS  
12  
Vapor Proof Light Globe(for door panel)  
1 " Dia. Gray Plug Buttons  
1 " Dia. Chrome Plug Buttons  
5/16" Hex Cam Wrench  
23-00594  
29-01287  
29-01300  
35-0180  
1
70  
8
1
SALE AND DISPOSAL  
OWNER RESPONSIBILITY  
If you sell or give away your Master-Bilt cabinet you must make sure that all safety labels and the Installation-  
Service Manual are included with it. If you need replacement labels or manuals, Master-Bilt will provide them  
free. Contact the customer service department at Master-Bilt at (800) 684-8988.  
The customer service department at Master-Bilt should be contacted at the time of sale or disposal of your  
cabinet so records may be kept of its new location.  
If you sell or give away your Master-Bilt cabinet and you evacuate the refrigerant charge before shipment,  
Master-Bilt recommends that the refrigerant charge be properly recovered in compliance with section 608  
of the Clean Air Act effective November 1995 and in accordance with all applicable local, regional, or national  
standards.  
14  
Download from Www.Somanuals.com. All Manuals Search And Download.  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
16  
Download from Www.Somanuals.com. All Manuals Search And Download.  
17  
Download from Www.Somanuals.com. All Manuals Search And Download.  
18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
20  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Krell Industries Stereo Amplifier KBL User Manual
Lanier Copier LW 210 User Manual
LG Electronics Clothes Dryer DLEX3001P User Manual
LG Electronics Refrigerator LFCS31626S User Manual
Life Fitness Treadmill 8972901 REV B 3 User Manual
Magnavox Flat Panel Television 321D User Manual
Mazda Automobile 2007 3 4 DOOR User Manual
McCulloch Blower 41BS321G077 User Manual
McIntosh Speaker System XRT2K User Manual
Memorex Karaoke Machine MKS2430 User Manual